Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011.

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
January 6. January 7 January 8 January 9 January 10.
March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.
Damping Rings Discussion Session: Implications and Impact of the Central Injector Configuration and Other Layout Issues ILCDR07 Workshop.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Damping Rings Baseline Lattice Choice ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
September 12, 2011 Global Design Effort 1 ILC Damping Ring Activities Cornell Group Mark Palmer GDE.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Working group on Damping rings, ATF and CESRTA October 20 th, 2010 S. Guiducci (INFN/LNF), M. Palmer (Cornell), Y. Papaphilippou (CERN), J. Urakawa (KEK/ATF)
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
DR to RTML ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
Design of a one-stage bunch compressor for ILC PAL June Eun-San Kim.
August 11, 2011 FNAL Meeting Global Design Effort 1 DR-CFS Discussion Mark Palmer GDE.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
2011 Damping Rings Lattice Evaluation WebEx Meeting May 24, 2011 Mark Palmer Cornell University.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 20, 2011.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
ILC Damping Rings: Configuration Status and R&D Plans Andy Wolski Lawrence Berkeley National Laboratory January 19, 2006.
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Third ILC Damping Rings R&D Mini-Workshop KEK, Tsukuba, Japan December 2007 Choosing the Baseline Lattice for the Engineering Design Phase Andy Wolski.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
DR Interface to Sources and RTML
Conventional Facilities and Siting Global Group (ARCFS)
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
Tom Lackowski Revised 10/12/2011
LER 2010 Overview (and other)
ILC DR instability simulations
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
ILC 3.2 km DR design based on FODO lattice (DMC3)
ILC DR instability simulations
ILC 3.2 km DR design based on FODO lattice (DMC3)
CLIC damping rings working plan towards the CDR
Lattice Session Summary
Session Introduction & Damping Rings Baseline Lattice Decision
ILC DR instability simulations
DR Session Introduction
J. Seeman Perugia Super-B Meeting June 2009
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011

Proposed Steps – Now to ALCPG11 Today: –Establish final design criteria –Verify lattice contributors Tuesday, February 8 th –Design Status WebEx –Review status of designs –Evaluate any final adjustments to design criteria Tuesday, March 8 th –Design Review WebEx –Circulate Design Summaries to full DR mailing list January 19, 2011 Damping Rings Lattice Meeting 2

ACLPG11 Lattice evaluation session as part of DR parallel sessions (March 20 or 21?) Present recommendation to ILC GDE on March 23 rd January 19, 2011 Damping Rings Lattice Meeting 3

Evaluation Criteria At TILC08, the previous lattice evaluation, we compared 4 lattices on the basis of 8 criteria: –Lattice Design and Dynamical Properties –Conventional Facilities and Layout –Magnets, Supports and Power Supplies –Vacuum System and Radiation Handling –RF System –Injection and Extraction Systems –Instrumentation and Diagnostics –Control System, Availability and Reliability Rankings of 1-5 (5 is best) for each criterion were used January 19, 2011 Damping Rings Lattice Meeting 4

ACLPG11 Evaluation for ALCPG11 should be simpler –Many items for the previous evaluation have now been locked in for both possibilities –Still have several comparisons to make: Proposed evaluation criteria: –Lattice Design and Dynamical Properties –Magnet and Power Supply Requirements –Vacuum System and Radiation Handling –RF System –Space for instrumentation and Diagnostics January 19, 2011 Damping Rings Lattice Meeting 5