8 May 2003 - cp EPTAB4 1. 8 May 2003 - cp EPTAB4 2 News BAAN400 – move underway June? Destocking continuing The pool has many low-rental items with high.

Slides:



Advertisements
Similar presentations
Financial Planning 1 Introduction and Budgeting. Learning Objectives Understand the importance of linking planning and budgeting Understand the importance.
Advertisements

Telecom Regulatory Authority of India An introduction.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
1 Measuring ICT4D: ITUs Focus on Household and Individual Market, Economics & Finance Unit Telecommunication Development Bureau.
Comstar Software Services Logon To Success Software As A Service.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
OPERATIONAL BUDGETING
Costing a Service Level Agreement Douglas Westwater 4 th September 2008 Welcome.
Personal reflections, Belgrade, November 30,2009 Markus Nordberg, CERN/ATLAS.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” LC-TPC-LBL 18-Oct Tracking Detector R&D at Cornell University and.
Capability Maturity Model (CMM) in SW design
Advanced Costing - ABC Activity Based Costing
Electronic Systems Support The CERN Electronics Pool The current review Long term issues C. Parkman EP-ESS Electronics Advisory Board 23 May 2003.
Module five: Session Two M5S21. Training objective To review the various financing options available to road contractors M5S22.
So you want to be a farmers’ market vendor?. Benefits of Farmers’ Markets Incubator and testing ground: “test the waters” to see how popular products.
Food control performance metrics Evidencing the effectiveness of enforcement activities Eoghan Daly, UK Policy and technical advisor (food)
K.Fedra ENV-e-CITY WP 8, T8.3: Business Model (updates, June 2003) DDr. Kurt Fedra ESS GmbH, Austria Environmental.
“NATIONAL CHAMBER OF PRIVATE BAILIFF OFFICERS ” in the new era of the online execution SIAIP INTRODUCTION 16 th of December 2014.
CNJohnson & Associates, Inc An Overview of Chargeback Best Practices.
GAIN A COMPETITIVE ADVANTAGE BY SELLING ATLAS
Who is Southern Company ? Regulated Utilities - Southeast Georgia Power Alabama Power Mississippi Power Gulf Power Savannah Electric & Power Southern.
Chapter 19: Implementing and
June 20, 2012 Outsourcing Physical Plant Should I ???
Copyright 2010, The World Bank Group. All Rights Reserved. Managing resources Finance – People – Knowledge Part 1 Strengthening Statistics Produced in.
Taking Your Business to the Internet. The Internet is one of the fastest growing mediums for businesses today, yet most businesses are not yet taking.
2001 HSC Examination q 25 (a, b,c ). Calculate the gross profit ratio for (Show all working.)
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Electronic Systems Support Electronics Pool Status & Evolution Chris Parkman, November 7, 2002.
C h a p t e r 20 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Break-even analysis Break-even point Budget.
Ph. Farthouat EPTAB August Pool: ATLAS needs u Current ATLAS use u Proposals made a year ago u Future needs u Summary.
Initial Idea Presentation for CS410 Instant Receipt Tracker Online Database Fall 2009.
Presentation made by 3D High School G.B. Bodoni.  What is it? Business Plan is a planning document that describe in detail the business project and allows.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
WP4 STATUS AND OUTLOOK Hartmut Hillemanns TTN Meeting, December
27 August cp EPTAB5 1. Electronic Systems Support EPTAB 5 27 August 2003 News & Information Chris Parkman Catherine Moine.
HEAVY VEHICLE CHARGING AND INVESTMENT REFORM: WAFLC Meeting : August 2012 Freight and Logistics Council of WA A more holistic HVCI Reform Meena Naidu,
City of Alexandria, Virginia Sanitary Sewer Master Plan February 23, 2013 City Council Public Hearing.
Lesson 9: Types of information system. Introduction  An MIS is a decision support system in which the form of input query and response is predetermined.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
Part 3 Implementing an e- Loyalty Plan. “The success of an e- loyalty program doesn’t end with a great program strategy. It’s ultimately dependent on.
BUDGETING PROCESS Dr. BALAMURUGAN MUTHURAMAN Chapter
Electronic Systems Support EPTAB 7 Electronics Pool Status Report 6 December 2004 Chris Parkman Catherine Moine.
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Click to add text 4.1 The Role of Marketing. What is Marketing?  The management task that links the business to the customer by identifying and meeting.
Fundamentals of Information Systems, Sixth Edition Chapter 1 Part A An Introduction to Information Systems in Organizations.
Electronic Systems Support EPTAB 6 23 April 2003 News & Information Chris Parkman Catherine Moine.
Physical Resources. The Operations Plan This part of your business plan will help you achieve Assessment Objectives AO2 and AO3. It is essential that.
Lesson 1 - Pricing VIRTUAL BUSINESS - RETAILING. What is Pricing? The method followed by a business to determine the selling price for its product or.
People Group Deanna Phillips Commissioner (Long Term Conditions, Dementia, and End of Life Care) Warwickshire County Council.
Electronic Systems Support EPTAB Electronics Pool - Status Report 3 May 2006 Catherine Moine.
09/09/10FV 1 NA62 common crate project. Crates survey result VF2 09/09/10 VME High populated TELL1 High populated TELL1 (Spare) Low populated TELL1 Low.
Road Owners and PMS Christopher R. Bennett Senior Transport Specialist East Asia and Pacific Transport The World Bank Washington, D.C.
Business Directory Script | Online Business Directory Software | business classified ad script
STRATEGIC TEMPLATE Business Create, Deliver & Capture Value Model.
Parts Management Agreements
Strategic Information Systems Planning
Mobility service Presentation to EN
PANDA collaboration meeting FEE session
Introduction to Rental Management
This project is funded by the European Union
Coherent sets of equipment Magnus Hansen
Electronics Pool Technical Advisory Board
Barrie rawlings halo CORPORATE finance
CUSTOMER RELATIONSHIP MANAGEMENT CONCEPTS AND TECHNOLOGIES
Create, Deliver and Capture Value
Company name: Date: Entrepreneur: Version:
REMOTE POWER MONITORING OF MARINE SITES
EXPLANATION The following slides describe the changes between the first draft of the general fund budget presented to the Board on March 28, 2017 and the.
Financial Management Budget = financial plan used to forecast needs, allocate resources, and track progress set goals and objectives record what is accomplished.
Presentation transcript:

8 May cp EPTAB4 1

8 May cp EPTAB4 2 News BAAN400 – move underway June? Destocking continuing The pool has many low-rental items with high repair costs LeCroy HV mainframe Rental 17 CHF/month Repair 1,050 CHF LeCroy NIM dual amplifier Rental 6 CHF/month Repair 415 CHF Evaluation of NIM in VME form-factor starting Latest introductions

8 May cp EPTAB4 3 Rental Fee Profile

8 May cp EPTAB4 4 Pool Users May 2003 Total LHC Experiments 41.7%

8 May cp EPTAB4 5 Financial Predictions Best case? Assumes that CMS will keep equipment in place at “overhead” rate of 18%, no fixed target and other users continuing at 2004 levels Guess! Assumes that CMS will resume at 2004 levels, no fixed target and other users continuing at 2004 levels

8 May cp EPTAB4 6 Future Of Pool The Pool must continue W-D.S., V.V., R.C. If dismantled, unlikely to be ever restarted Technical quality control – should this be compromised? 2005 Only CMS has requested test beam after 2005…? Fixed target programme? Find strategy to get past 2005 Extra customers Occupy staff Use income in 2003/4 for survival and to focus the pool Bank some revenue to meet incompressibles in 2005 To preserve infrastructure Set up coherent product lines Application orientated sets Renew the pool stock Benefit from 2 year guarantee Input required on Likely use of the Pool in 2005 and after Contact with resource coordinators, technical coordination… Other “pools” at CERN

8 May cp EPTAB4 7 Rental Existing scheme Heavy, unrealistic, difficult (~impossible) to implement Not transparent Possibilities “Commercial” scheme Life-time amortisation But we don’t sell off equipment at end of life (as does a car rental) We do not aim to be “commercial”, but to provide a service Too much selling off would put us in competition with ourselves in a small market Transparent No rental Funding by levy on experiments & support groups pro rata to needs Moves the problem Need to put responsibility for equipment at the appropriate level to ensure its proper treatment & return to pool Not transparent

8 May cp EPTAB4 8 Rental Conditions – Current Model Lifetime 5 years

8 May cp EPTAB4 9 Lifetime Amortisation Lifetime 5 years

8 May cp EPTAB4 10 Compromise Rental Scheme Soften the strict business model Problems with lifetime amortisation Constant rental fee Set by pool operations based on Initial cost Estimated useful lifetime Likely maintenance charges Likely usage End of life change in fee linked to level of technical support Based on statistics from real use Transparency Justify to EPTAB/EAB…

8 May cp EPTAB4 11 Compromise – Constant Rental Costs exceed revenue - action!

8 May cp EPTAB4 12 Application Orientated Sets Take a functional view of detector readout electronics Examine which functional blocks should/could be included in the Pool Survey the functional requirements and needs for LHC Detector functions and technologies Electronics Requirements for R&D and commissioning Practical examples of solutions adopted Which items could not be found from the Pool?

8 May cp EPTAB4 13 A functional view of the readout electronics Typical Read-Out STANDARD MODULES AND CUSTOM MODULES Discr. High- Bandwidth (> a few 100MHz) Detector Amplifier Pulse Shaper ADCMemory Computer interface Computer TDC Trigger Logic Creation of a database of the existing circuits: Circuit specifications Availability Contact person etc. Specificity increases, EPOOL role decreases