State Estimator (SE) and Simultaneous Feasibility Test (SFT) Status Report Steve Myers Manager of System Operations.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 Texas Nodal Observability Status ROS Feedback Thursday, February 14, 2008.
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
SO – CART Project Status Protocol Revision Subcommittee Update 2/23/06.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
September 8, 2008 TPTF Nodal Core Projects Updates Nodal Project Managers.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
State Estimator & Telemetry. Imagine a student measuring current on an electrical circuit.59 With on meter, he measures.59 A. Being a cautious type, he.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
ERCOT Operational Audit 2005 August 1 - August 19, 2005.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
1 Readiness Scorecard – May ‘10 NATF Brandon McElfresh Nodal Readiness and Transition May 4, 2010.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Scheduling and Operating Transmission Devices in the Nodal Environment.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
© Property of ERCOT EMMS Improvements Operations Review Group 11/17/04.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
1 Nodal Stabilization Market Call December 27, 2010.
Operations Update ERCOT Board Meeting March 18, 2003.
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
Telemetry and State Estimator Standards Network Data Support Working Group June 16, 2006.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
09/20/20061 RTCA, CAM, and SFT Presented by: John Dumas September 20, 2006.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
01/21/2009 Telemetry Process & Progress ERCOT State Estimator & LFC Team Operations Advanced Network Applications Support.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
GREDP Monitoring QSE Manager’s Working Group December 15, 2010.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
Congestion Management and Ramp Rate for Delivering Ancillary Services
Settlements Analysis due to SFT Deration Issue
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
PEAK’s RMTNET Tool Sarma (NDR) Nuthalapati, Principal NetApps Engineer
Presentation transcript:

State Estimator (SE) and Simultaneous Feasibility Test (SFT) Status Report Steve Myers Manager of System Operations

State Estimator  Progress Total difference between generation & load reduced from 10’s of 1000’s at first to <500 MW Approximately 25 buses >50 MW mismatch 90% observability (75% with measurements)

Uses of the State Estimator  Identifying data problems  Identifying model problems  Monitoring of locations w/o SCADA (by System Operators)  Creating a case for Contingency Analysis Normally successful at least once per day

SE Plan  Continue to incrementally improve  Continue to reduce mismatches  With Engineer’s attention, use in Day-Ahead analysis  Train System Operators  Ultimately – SE will run CA in RT sequence

SE Plan  Needs Data Response from QSE’s and Private Networks Unit Status – QSE Private Network Issues to Correct Net Gen sent as one unit Loads not modeled Data required by ERCOT Operating Guides Section 8

Simultaneous Feasibility Test (SFT)  Calculates “Shift Factors” used in Congestion Management  Progress Attempted use in December '02 Bugs that had not shown up in test mode Waiting on fixes from vendor Once offline testing complete, will test again in production

SFT Plan  Use in Day-Ahead Initially peak hour Limited contingencies  Use in Hours Ahead Initially test mode Limited contingencies Limited iterations with SPD

Next Steps  Contingency Analysis will run in the Real- Time sequence and upon demand  SE and SFT will run for each BES deployment  ERCOT expects its systems to be ready By April 1

What Do We Gain?  More accurate analyses – closer to RT  Greatly improved pro-active CM  Much more accurate “Shift Factors”  Potentially less OOM deployments