M&M Precast, Inc. Project: I-66 Highways for Life Location: Rt. 50 Ramp (East) off I-66 – Fairfax, Virginia VDOT Project No.: (FO)0066-029-767, M501 FHWA.

Slides:



Advertisements
Similar presentations
Nucorhighway.com Nucor Steel Marion, Inc. What makes us special? Simple System Line Posts Cable Hook Bolts Turnbuckles End treatment.
Advertisements

WAREHOUSING MANAGEMENT
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Construction Sequencing I-15, Ontario, CA HFL Show Case, June 22, 2010 Peter J. Smith, P.E. The Fort Miller Co., Inc.
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
USE OF POLYURETHANE GROUT FOR CONCRETE PAVEMENT SLAB STABILIZATION Indiana County District 10-0 Lessons Learned 1.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
“A driver initiated program” Lance Morgan Dave Conklin.
PowerPoint ® Presentation Chapter 4 Flatwork Flatwork Applications Site Preparation Concrete Reinforcement Flatwork Procedures Joint Control Bleedwater.
A-ABLE SEPTIC-SEWER SERVICE, INC. MOUND SYSTEM MOUND SYSTEM.
RIPRAP INSTALLATION Dennis Clute Construction Engineer NDCSMC Clute
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 6 Dowel Bar Retrofit.
Concrete Pre Cast Panel By Peter Spence ID:
Research Advisory Committee Annual Meeting FHWA Briefing Michael Trentacoste Associated Administrator Research, Development, & Technology Director, Turner.
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
HSE TRAINING LADDER SAFETY January TMD-8303-SA LADDER SAFETY Whereas all other categories of occupational injury / illness and fatality statistics.
 Project Delivery  Design Considerations  Lessons Learned.
Building with PolySteel. #1Footings Install standard (level) footings with rebar placed at the intervals required by your building design, as outlined.
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
Preparation before placing concrete Chapter 3. Chapter Topics Subgrade preparation Compaction around buried pipes and excavations Establishing grades.
Batching, Mixing, and Handling. Ordering or Specifying Concrete Alternative (1) Common: When the owner requires the concrete supplier to assume responsibility.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 7 Isolated Partial Depth Concrete Repair.
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Pre-Construction Concrete Conference Agenda. Project:Project name Location:Project Location Scope of Work:Description of scope (i.e. foundation, sog,
Planning for slab-on-ground placement Chapter 1. Chapter Topics Introduction Specification requirements Determining the size of concrete placements Ordering.
PRE-FABRICATED STRUCTURES
Chapter 12 Concrete Construction Part 2 1CE 417, King Saud University.
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
2013 Section Engineer’s Meeting.  Correct Type, Gauge, and Coating (Standard Drawings)  Based on Pipe Diameter, Fill Height & Soil pH  Obtain copy.
B ASEPLATES S LIDE S HOW. Anchor Bolts are positioned and placed in the concrete before it cures. Plastic caps are placed over the anchor bolts to protect.
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
I. Advantages of Smooth Pavements: Longer Life Public Opinion Save Fuel Less Surface Maintenance II. Ways to Ensure Smooth Pavements Subgrade and Subbase.
1. The Challenge Hospital-associated infections (HAIs) like MRSA continue to be a problem in health care facilities It is estimated that each year in.
Office of Highway Safety Oversight of Construction Projects George Black.
Tying together means and methods in a Methods of Construction – Concrete & Masonry curriculum A Faculty Perspective Case Study.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Lunda Quality Management Plan Contractor-Engineer Conference Presentation January 22, 2009.
Paving & Surfacing Module #6 Prepared by Dr. Randy R. Rapp July 2005.
Objective Distinguish between site preparation, placing, finishing, and curing.
Student Objectives: Who are the key players in the Concrete Industry? Describe the interactions among industry players INTRODUCTION TO THE CONCRETE INDUSTRY.
Concrete Countertops. Cast in place Pre – Cast Overlay.
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
The New Science Building Texas A&M International University Laredo, TX Nicole Griffith.
Greg Hainsworth, P.E. M&R Workshop February 2014.
Continuously Reinforced Concrete Pavement
TYPE OF STAIRS STRAIGHT-RUN STAIRSQUARTER-TURN STAIR HALF-TURN STAIR SPIRAL STAIRS WINDING STAIR CIRCULAR STAIR Building construction illustraded 4 th.
Case Study: PV Plant Concrete Cabins Presented by: Justin Kretzmar Rocla (ISG)
LARP Collaboration Meeting Racetrack Coil Fabrication
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
YOUR BEST CONNECTIONS All parties concerns and interests combined
Foundation – jay Desai.
Ryan Thurston | Duncan McLennan
Cast in Place 2 way Flat slabs Basically joists in both directions
Concrete and Masonry Construction 29 CFR 1926, Subpart Q
Batching, Mixing, and Handling
PRODUCTION PLANNING AND CONTROL
RCC UNIT-12 Prestressed Concrete
BASEPLATES SLIDE SHOW.
Installation Binder / IRR – an example
Prime Factors for Successful Preservation Treatments
Presentation transcript:

M&M Precast, Inc. Project: I-66 Highways for Life Location: Rt. 50 Ramp (East) off I-66 – Fairfax, Virginia VDOT Project No.: (FO) , M501 FHWA #: IM-066-1(322) Contractor: Lane Construction Corp. – Superintendent: Erich Brown Client: Virginia Department of Transportation – VDOT Coordinator: David P. Shiells, P.E. Challenges: – Gain approval [at the 11 th hour] for a HPC mix design – 224 Slabs – everyone geometrically different (no 90 o corners, some warped) – Must be delivered in proper sequence – one wrong slab and the project is shut down – Extremely tight production and delivery schedules – New product with a new and untrained workforce – High profile project with persistent scrutiny

Proper Set Up Proper set up is the key to maintaining an efficient, safe, and quality conscience environment. Having the raw materials, tools, and shop drawings available at the source saves time and helps eliminate confusion.

Raw Material Organization Dowels bars, pails filled with PVC sleeves, and pre-wrapped dove-tail inserts at each table saves valuable time.

Information Station Daily schedules and cut sheets keeps the crew informed and valuable information readily available.

Quality Control Since we had 224 Slabs that were all different geometrically, quality control checks were crucial: Tables were checked after initial rail layout and table height adjustments. Tables were again checked before casting: – Dimensions – Warp adjustments (with auto-level) – Rebar placement – Dovetail slot placement – Lifting insert placement and bolt adjustment – Magnet placement and engagement – Dowel depth Slabs were checked during concrete placement and after concrete finishing Post-pour checks were conducted after curing Slab stacking sequence was pre-arranged and checked by QC Slabs were again checked after trailer loading for: – Dimensions – Dunnage placement – Finish – Slab identification

Required tools Clean and ready for production is pivotal.

Concrete Finishing Using a roller screed ensures meeting slab thickness and flatness requirements.

Concrete Finishing Using a bull float to achieve a smooth consolidated finish.

Pre-loading Trailers for Delivery Having trailers pre-loaded and QC inspected is the key to on-time and quality insured deliveries.

Slab Removal On site – First night of slab installation

Dowel Drilling & Sub-grade Preparation

Sub-grade Checks and Slab Placement Although the finished roadway looked good, several cracks formed due to improper sub-grade levels. The sub-grade levels in the corners, where hand finishing is required, was up to 2” lower than proper grade. I suggest immediate grouting to help eliminate this possibility.

Slab Placement and Section Completion