The Public Waterfront Act. Covering the basic questions Why? Purpose of Act and Regulations Where? Geographic Jurisdiction What? Activities Subject to.

Slides:



Advertisements
Similar presentations
U.S. Army Corps of Engineers Regulatory Program Regulatory Program.
Advertisements

City of Tybee Island 2007 Master Plan Summary Report Area Character Maps and Area Development Recommendations.
Aspen Falls Park Development Land Acquisition for Parks One Minute to Start.
Shoreline Public Access
WHAT DOES THE CITY of New Orleans ZONING ORDINANCE DO?
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
PENNSYLVANIA CODE Title 25.Environmental Protection Chapter 102 Erosion and Sediment Control Clean Streams Law-Act 394 of To preserve and improve.
1 Residential Design by the Rosellini Group, llc, copyright © 2007, all rights reserved THE WATERFRONT at FIDALGO BAY A Planned Mixed-Unit Development.
Brian Wolyniak Urban Forester Penn State Extension ORDINANCES TO PROTECT AND ENHANCE TREE POPULATIONS.
Shale Gas Drilling County-wide SURFACE DRILLING CONSTRAINTS SPATIAL ANALYSIS EXERCISE.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Saugus Economic Development Committee Fox Hill Yacht Club February 26, 2014 PRESENTATION DRAFT WATERFRONT MIXED USE OVERLAY DISTRICT Courtesy Photo -Jim.
The Mystic River Corridor Strategy Project Metropolitan Area Planning Council Boston Redevelopment Authority City of Chelsea City of Everett City of Malden.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
Shale Gas Drilling Deep Creek watershed SURFACE DRILLING CONSTRAINTS SPATIAL ANALYSIS EXERCISE.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
A Public Hearing Clean Water Act Section 401 Water Quality Certification Regarding Windsor Point Part II March 9, 2010.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
Hominy Pot Road Bridge Fox Chase Road Fox Chase Road History Original Layout: 1785 (33’ ROW) Original Layout: 1785 (33’ ROW) Discontinued subject.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Land Use Study for the Community of Winchester May 21, 2012.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Toll FL Limited Partnership District 1 August 4, 2015 Environmental Protection.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Land Use and Development Regulations © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Our object in the construction of the state is.
Session 131 A community profile provides a base for overlay analysis and for discussing a hazard’s impacts on a community.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
August 20, 2015 Aquatic Habitat Protection Program Turtle Lake Watershed - AGM Ben Wilson – Aquatic Habitat Protection Specialist.
MECKLENBURG COUNTY MECKLENBURG COUNTY CLARKS CREEK GREENWAY BROWNE’S FERRY NEIGHBORHOOD.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
New Brighton Planning Commission Meeting April 18, 2006 Public Hearing: Zoning Ordinance Amendment: Section Regarding Commercial/Industrial Park.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
Appeal to the Recommendation of the Environmental Protection Commission John Jakes February 23, 2010 Environmental Protection Division Environmental Protection.
 FRLP Proposed Boundary Line Adjustment: Confluence Virginia What life have you if you have not life together? There is no life.
Coastal Management Issues and Strategies: State and Municipal
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
Annexations as a Means to Preserve Open Space October 29, 2009.
Astoria Riverfront Vision Code Assistance The City of Astoria, Oregon Planning Commission Work Session October 28, 2014.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
ADOPTION PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 24, 2014.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
PART I: COMMUNITY PRESERVATION Stewardship and Maintenance Christine M. Chale, Esq. Rodenhausen Chale LLP
Department of Port Control Center for Regional Economic Initiatives February Doan Brook Stream Restoration Project Center for Regional Economic.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
LOCATIONAL AND SUPPLEMENTAL CRITERIA FOR UTILITY SCALE PHOTOVOLTAIC SOLAR FACILITIES.
Submerged Lands Leasing Program Dan Prichard Bureau of Parks and Lands Department of Conservation.
Reuben E. Lee Restaurant (now removed) Island Prime Restaurant.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
Area Plan Overview Public Comments and Area Plan Changes Environmental Analysis Schedule Presentation Overview.
Land Use and Development Regulations © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Our object in the construction of the state is.
 Overview of Project  Economic Development Tools  Municipal Management Districts  Tax Increment Reinvestment Zones  Session Review, Q&A.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
BROOKLYN BRIDGE PARK micah sherman daniel martinez.
N Current Adopted Post-LCP Certification and Appeal Jurisdiction Map Exhibit 1.
Environmental Quality Board
Political & Billboard Signage
Environmental Critical Areas Regulations
Jefferson County RZ To amend the existing Planned Development (PD) zone district to allow for mini-warehouse storage. Case Name: Tri-Star Office.
Texas Master Naturalist Lindheimer Chapter
Hudson Wetlands Protection Bylaw
Anne Arundel County Maryland
Planning Commission Meeting: August 3, 2016
IMPLEMENTING AMENDMENT 1
Level 1B: Advanced Fundamentals Effective August 2018
Presentation transcript:

The Public Waterfront Act

Covering the basic questions Why? Purpose of Act and Regulations Where? Geographic Jurisdiction What? Activities Subject to Jurisdiction How? Application process and standards When? Apply pre & post construction Who? Program Contact Information

Formerly established in 1866 Rooted in the Public Trust Doctrine Codified in colonial ordinances of Public Has Fundamental Rights in Natural Resources such as the air, the sea, and the shore. The state, as trustee of the public’s rights, has a duty to preserve these resources and the public’s right to use them. Chapter 91 Overview

Purpose of Regulations CMR 9.00 to ensure tidelands are utilized for water- dependent uses or otherwise serve a proper public purpose To protect public health, safety & general welfare To revitalize urban waterfront properties To promote public use and enjoyment of the water Chapter 91 Overview

Geographic Jurisdiction Flowed Tidelands Filled Tidelands Great Ponds List by County available on line Navigable Rivers and Streams

Geographic Jurisdiction Commonwealth Tidelands publicly owned lands accessible for all lawful purposes beyond low water (or 100 rods seaward of historic high water) Private Tidelands Between mean low and high water Privately owned subject to public rights to fish, fowl, navigate and natural derivatives thereof Landlocked Tidelands landward of the first public way and 250 feet from high water

Designated Port Areas in the Mystic 3 areas designated Chelsea Creek Mystic River East Boston DPA Boundary Follows roads Includes Charlestown, East Boston, Chelsea and Revere Jurisdiction (Presumed) Historic Mean High Water

Activities Requiring Review Construction, maintenance, reconstruction of unauthorized fill or structures Existing or proposed use Existing or proposed structure or fill Change in Use or Structural Alteration Permit for dredge, beach nourishment and lowering of Great Pond water level

Public Participation in the Application Process Landowner/Applicant submits completed application and plan to DEP Office Notice is published & distributed to required parties Public comments in 30-day comment period Applicant submits response to comments Draft decision distributed to those who request May appeal within 21 day appeal period License recorded at the Registry of Deeds At completion, Certificate of Compliance required Approximate # of Days = days

Determination of Water-Dependency Water Dependent Use See 310 CMR 9.12(2)(a) Require direct access to or location in the water Nonwater-Dependent Use [310 CMR 9.12(2)(e)] Does not require direct access to or location in the water Water Dependent Industrial Use [9.12.(2)(b) and (c)] Requires direct access to or location in the water Industrial and heavy commercial uses List of specific uses in the regulations Other – Accessory, Temporary, Supporting DPA Use

Water Dependent Uses

Non- Water-Dependent Uses

Performance Standards: Preserve Public Rights [310 CMR 9.35 (2)] Protect Water-Dependent Use [310CMR 9.36] Meet Engineering Standards [310CMR ] In DPA, shall not preempt, disrupt, displace [310 CMR 9.36(3),(4),& (5)] Nonwater-Dependent Use Standards [310 CMR ] No private uses over water or on ground floor within 100 feet of shore Building setback from shore and height limitations 1:1 ratio of Open space to building footprint Public pedestrian access network Water-based public facility Activate Commonwealth Tidelands

MassDEP Chapter 91 Waterways Licenses At Confluence of Mystic and Malden Rivers 13 Waterways Licenses Issued in the area 4 Offices, 2 shopping centers 2 yacht clubs, school, radio station More Greenway created through chapter 91 licensing requirements 46 acres of filled tidelands turned into waterfront parkland Waterfront walkways link existing development sites together public parking provided at private developments for park use landscaping include trees, benches, lighting and clear signage Public: Private Partnerships establish long lasting maintenance commitments Existing Mass DCR parkland linked together through private tideland development Private developers provided park easements to the Mass DCR Private developers maintain park features throughout term of the c91 license Recreational Boating is celebrated and encouraged Tufts Boathouse re-introduces rowing to the Malden River Three existing Yacht Clubs Public boat ramps provided and maintained by private licensees Canoe Launches on Malden and Mystic Rivers Removed 2 sunken barges and debris to improve navigation and wetland health

Thanks for coming! Andrea Langhauser MassDEP Waterways Regulation Program One Winter Street, 5 th floor Boston MA Phone: