Construction Vehicle Access and Egress Module 4.  Access to- and egress from work zones presents significant challenges. Hazards are compounded when.

Slides:



Advertisements
Similar presentations
Roles and Responsibilities. A good ITCP program may involve a number of key people: Safety Professional Inspectors/Quality Control Superintendent/ Project.
Advertisements

How would you like it if people drove their cars thru your office?
CHAPTER 11 EXPRESSWAYS.
DRIVING ON EXPRESSWAYS
Temporary Traffic Control Elements
“Highway Construction Work Zones and Traffic Control Hazards” A Training Program developed under a Susan Harwood grant from OSHA Prepared by Wayne State.
Safe and Secure Safety Training Series identifying JOB HAZARDS.
Developing the Program.  Different aspects of the ITCP will be identified and developed during the various construction phases of a project.  Depending.
“A driver initiated program” Lance Morgan Dave Conklin.
Technology Solutions. There are a variety of technologies—old and new—that have been developed to warn drivers and operators when workers on foot are.
OSHA NOTICE & DISCLAIMER “This material was produced under grant SH20866SH0 from the Occupational Safety and Health Administration, U.S. Department of.
Road Safety & Awareness Training Your “Right to Know” 29 CFR 1926 / DOT MUTCD This material was produced under grant number SH22297-SH1 from OSHA. It does.
SAWMILL SAFETY Module 5 Shipping and Handling “ Assume they can’t see you ”
Shipbreaking Module 4: Heavy Equipment & Material Movement
Safety for Workers on Foot. Safe Practices  Consider worker behavior when developing the ITCP. Determine locations where workers are likely to go.
Preventing Runovers and Backovers
INTERSTATE DRIVING Information Processing: Complex Risk Environments
1. Overview of Process Safety Bioethanol Process Safety Management for Biofuels This material was produced under grant SH F-36 from the Occupational.
Pedestrian and Worker Safety Module 5 1 This training is provided under Susan B. Harwood No. SH F-8. It does not necessarily reflect the views.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Module 2: General Working Conditions 2.3 Ladders / Stairways Susan Harwood Grant Number SH F-23.
This material was produced under grant numbers SH F-17 from the Occupational Safety and Health administration, U.S. Dept. of Labor. It does not.
Safety Training Presentations
1 Machinery and Vehicular Safety. This material was produced under grant number SH F-54 from the Occupational Safety and Health Administration,
Guidelines for Traffic Control at Surface Mines
Preventing Runovers and Backovers
Module 3: PPE 3.3 Training Susan Harwood Grant Number SH F-23.
Module 3 Flagger Stations
CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS
Signals,Road Markings, Intersections, Sharing the Road
Remaining Course Material 1.Overview of Process Safety 2.Compliance with standards 3.Process Hazard Analysis 4.Standard Operating Procedures 5.Safe work.
Work Zone Safety Awareness. What is a Work Zone?  Work Zone is a term applied specifically to highway and road construction sites involving federal government.
Ch. 16 Driving on Highways.
Highway Incident Safety For Emergency Responders
Driving on Expressways
Expressway Driving. Characteristics of Expressway Driving Roadway Speed Interchanges No cross traffic Median Tollbooths Entrance/exit ramps Limited access.
Chapter 11 Driving on Expressways
Chapter 1 Basic Car Control.
Developing the Program Module 5.  Different aspects of the ITCP will be identified and developed during the various construction phases of a project.
This material was produced under grant number SH F-51 from the Occupational Safety and Health Administration, U.S. Department of Labor. It.
Flagger Control Module 6 1 This training is provided under Susan B. Harwood No. SH F-8. It does not necessarily reflect the views or policies.
Principles of “Internal Traffic Control” for Roadway Construction Module 2.
Walking and Working Surfaces
Safety for Workers on Foot Module 3. Safe Practices.
Urban Traffic Traffic is more dense City traffic hazards are closer Use IPDE Process.
Ch 11 Driving on Expressways Characteristics of Expressway Driving.
Big Four Construction Hazards: Struck-by Hazards This material was produced under grant number 46F5-HT03 and modify under grants numbers SH F-72.
Unit 4 Chapters 7, 9, 10 and 11.
Combustible Dust Preventing and Mitigating the Effects of Fire and Explosions Developed by Western Iowa Tech Community College This material was produced.
Productivity. PLANNING  The key concept behind Internal Traffic Control is PLANNING for worker safety.  ITCPs integrate other aspects of planning to.
Module 5: Fire Protection
Virginia Department of Education
Expressway Driving Entering, lane changing, and exiting.
Virginia Department of Education
SHIPBREAKING Module 1: Introduction to Shipbreaking 1.4 Gangways and Signs Susan Harwood Grant Number SH F-23.
Information Processing: Complex Risk Environments Topic 1 -- Characteristics of Expressways Topic 2 (through Lesson 1)-- Entering, Changing Lanes, and.
Expressway Driving Legacy High School Drivers Education.
Section 4 (Day 1) Information Processing: Complex Risk Environments.
MERGING What Young Drivers Must Do to Execute These Maneuvers.
DRIVING THE FREEWAYS ALABAMA DRIVER MANUAL CHAPTER 8.
Module 5: Operations & Hot Work 5.3 Hot Work, Permits, and Inspections Susan Harwood Grant Number SH F-23.
OBJECTIVES  We will understand the characteristics of expressways  We will apply risk-reducing strategies to enter and exit traffic, steer, establish.
Chapter 5 Sharing the Road.  When following a large vehicle, stay out of its "blind spots". Position your vehicle so the driver can see it in the side.
Objectives: Students will utilize critical thinking and problem solving skills to learn basic driving skills Topics covered:  Basic maneuvers to enter,
Applying the IPDE Process
Shipyard Machinery and Power Tool Safety
Chapter 9 Environments and Traffic Settings
Information Processing:
Big Four Construction Hazards: Fall Hazards
lesson 16.2 ENTERING CONTROLLED- ACCESS HIGHWAYS
Presentation transcript:

Construction Vehicle Access and Egress Module 4

 Access to- and egress from work zones presents significant challenges. Hazards are compounded when the roadway carries high traffic volumes or operates at high traffic speeds. Safety challenges include: – Motorists following construction vehicles into the work space; – Acceleration and deceleration of construction vehicles as they exit and enter open traffic lanes; – Proximity of workers on foot to access and egress locations.

 Getting materials and equipment into the work zone safely and efficiently.

 Acceleration / Deceleration Lanes – Short or Non-existent  Signage Indicating Merge / Exit Points – Signs give vague information – Messages left up 24 / 7  Flagging Operations – Works best with low traffic and moderate trucks – Low trucks = intermittent flagging – Proper rules are forgotten  Night Work – Poor sight distance, impaired drivers, others?

Delivery access and egress point. Moving construction Equipment. Parked employee vehicles. Workers on Foot.

 Access and egress challenges can be addressed by an ITCP in the following ways: – Isolating workers on foot from trucks and equipment; – Limiting/controlling vehicle access points; – Coordinating truck and equipment movements; – Providing guidance to workers on foot, truck drivers, and equipment operators. – Designating locations for parked vehicles and equipment – Raising awareness about vehicle intrusions with workers and operators/drivers

 Trucks entering the work zone put motorists and those on other side of wall at risk.

 Training truckers to pay attention to work space dynamics.  Instruct workers to stay clear of access and egress points.  Instruct employees on proper locations for parking and staging vehicles, away from entry and exit points.

 Trucks queued inside the work zone create obstacles for workers and operators.

 If queues threaten to block access and egress locations, queues should be redirected, or different access and egress spots should be opened and identified for drivers to use.

 Trucks do not have sufficient space to slow down when entering, or match traffic speeds when exiting.

 Use shoulder areas or closed lanes to create ramps that will provide safe acceleration and deceleration zones.

 Crew, operators, inspectors, subcontractors and others may not be up-to-date on access/egress locations as work progresses.

 Hold pre‐shift meeting with all involved  Everyone must be informed on daily activities and changes.

 Motorists may breach barriers and strike workers near access and egress points.

 When openings are not in use they should be evaluated to see if it is necessary to close them.  Watch for vehicles that do not belong in or near the work area.  Check for problems such as blunt ends on barriers

End Module Four “This material was produced under the grant SH F-11 from the Occupational Safety and Health Administration, U.S. Department of Labor, and contract M from the National Institute for Occupational Safety and Health. It does not necessarily reflect the views or policies of the U.S. Department of Labor or U.S. Department of Health and Human Services, respectively, nor does mention of trade names, commercial products, or organizations imply endorsement by the U.S. Government.”