WRIA 40A Squilchuck/Stemilt Watershed Planning Phase II Kickoff Meeting May 3 rd 2006.

Slides:



Advertisements
Similar presentations
Ontario Low Water Response (OLWR)
Advertisements

Vision For the Future of Water in Kansas. 1.Technology and Crop Varieties 2.Water Management 3.Water Conservation 4.New Sources of Supply Breakout Topic.
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
Watershed Approaches and Community Based Planning
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
ESPA Comprehensive Aquifer Management Plan Presentation to the Governor’s Water Summit April 17, 2007 Idaho Water Resource Board Jonathan Bartsch and Diane.
Overview of Indian Wells Valley Hydrogeology and Management Presenters.
Moving Forward after the Colorado River Basin Water Supply & Demand Study Urban Water Institute’s 21 st Annual Conference San Diego, CA August 14, 2014.
1 Statewide Water Supply Initiative Gunnison Water Workshop July 29, 2005.
Indian Valley Meadow Restoration acre meadow located atop the Sierra Crest in Alpine County, CA. Headwaters of the Mokelumne River. Source for agricultural,
9/2/20151 Ohio Family and Children First An overview of OFCF structure, membership, and responsibilities.
Marin County Watershed Stewardship Plan
Identification of King County Streams with Declining Summer Flows Curtis DeGasperi, King.
Integrated Water Management Modeling Framework in Nebraska Association of Western State Engineers Spring Workshop Salt Lake City, Utah June 9, 2015 Mahesh.
Climate Policy Development Tom Peterson The Center For Climate Strategies August 25, 2005.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Agricultural Stakeholder Committee August 3, 2011 DWR’s Discussion Paper on Proposed Methodology for Quantifying the Efficiency of Agricultural Water Use.
WATER POLICY UPDATE Washington Water Law 2008 LSI Conference Spokane, Washington April 10, 2008 Evan Sheffels Water Policy Special Assistant Washington.
Basin Implementation Planning SOUTHWEST BASIN ROUNDTABLE July 16, 2014.
Regional Water Council Planning Update Dargan “Scott” Cole Hall Booth Smith & Slover, P.C. 191 Peachtree Street, Suite 2900 Atlanta, Georgia
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
Water for America Initiative Eric J. Evenson Advisory Committee on Water Information February 20, 2008 U.S. Department of the Interior U.S. Geological.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Integrated Regional Watershed Management Plan Presentation – November 21, 2013 HLVRCD.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Wenatchee Heights Area Pipe open ditches Line storage reservoir Create additional storage capacity Improve river system pumping (add pump station) Finalize.
WRIA 43 Phase 3 Plan Development Building a Watershed Plan with the Functions and Values of the WRIA 43 Planning Unit March 21 st, 2006 Meeting.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
Connecticut Department of Energy and Environmental Protection.
Environmental Infrastructure Needs Assessment: GIS Based Decision Support System Southwest Center for Environmental Research and Policy Presented by Rene.
“Ground Water Level and Quality Monitoring” National Ground Water Association Presentation for: Advisory Committee on Water Information January 19, 2006.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
Watershed Management Act ESHB 2514 by 1998 Legislature RCW Voluntary Process Purpose: to increase local involvement in decision-making and planning.
WATER MARKETS IN WASHINGTON Presented by: Eugene N.J. St.Godard, P.G., C.HG. Principal Hydrogeologist/Owner Water & Natural Resource Group P.O. Box 28755,
Chagrin River Watershed Partners, Inc. Chagrin River Balanced Growth Plan Amy Brennan (440) , Newbury Township.
Drinking Water Source Protection Ministry of the Environment Source Protection Programs Branch March 2010.
Okanagan Drought Planning and Response A presentation by Kellie Garcia Osoyoos Lake Water Science Forum October 9, 2015.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
December 17, 2014 Whatcom County Coordinated Water System Plan Update WRIA 1 Planning Unit 1.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
2016 Columbia River Basin Long-Term Water Supply and Demand Forecast Dan Haller, PE
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
PROJECT PLAN: The Nature Conservancy Corps of Engineers ICPRB Presentation Potomac Watershed Roundtable January 9, 2009.
St. Johns River Water Management District Central Florida Water Initiative Water Supply Plan Mike Register, P.E., Director Division of Water Supply Planning.
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
Land of the Living Waters The South Llano River, its Springs, and its Watershed Photos: Jennifer Walker.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Draft example: Indicators for water supply reliability and storage projects Presented by Steve Roberts (Department of Water Resources, Storage Investigations)
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
Shasta Valley Groundwater Basin
Harney Place-Based Water Planning: A Pilot Update
WATER POLICY And Management in AlabamA
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Systems and Components – A Process for Developing the Total Water Budget Handbook for Water Budget Development - With or Without Models CWEMF 2019 Annual.
Optimization for Sustainable Water Resources
Indiana Finance Authority (IFA)
Presentation transcript:

WRIA 40A Squilchuck/Stemilt Watershed Planning Phase II Kickoff Meeting May 3 rd 2006

Welcome and Introductions Chelan County Natural Resources Department –Mike Kaputa, Director –Lee Duncan, Natural Resource Specialist RH2 Engineering –Randy Asplund, Project Manager –Jim Bucknell, Water Rights and Policy –Steve Nelson, Geology/Hydrogeology –Bill Sullivan, Geology/Hydrology

Roles and Responsibilities Chelan County –Lead Agency, Overall Management –Public Facilitation and Agency Coordination Planning Unit –Define Objectives –Collaboration Among Stakeholders –Process Approval RH2 Engineering –Conduct Assessments –Assist in Plan Development

Desired Outcome for this Meeting (Presentation Segment) Objectives for Phases II and III Responsibilities for Planning Unit members and RH2 Team Expectations for a Watershed Plan

Desired Outcome for this Meeting (Workshop Segment) Collect new and confirm existing information Organize Technical Subcommittee Prioritize objectives Set direction for next meeting

Presentation –Results of Phase I –Introductions and Desired Outcome –Outline of upcoming Phases Workshop –Discussion/Expectations –Next meeting Agenda

Results of Phase I Organization Membership Operating Procedures Preliminary Information –Data Collected –Ideas Compiled

Scope of Work Phases II and III Collaboration with Chelan County and Planning Unit Supports Planning Unit objectives Complies with Grant requirements

Phase II- Scope of Work Water Quantity Assessment Compile existing hydrologic data –Wells, storage facilities, ditches, pipelines –Water Rights, Water Use Assess Groundwater Resources –Examine well distribution –Evaluate well data: water level, strata, depth –Develop a conceptual model

Perform Water Balance Analysis –Precipitation and Climate –Evaporation and Transpiration (non-ag) –Groundwater Recharge –Runoff –Irrigation –Storage Phase II- Scope of Work Water Quantity Assessment

Quantify Water Rights and Claims –Evaluate Information on Record with Ecology –Attempt to Match Rights with: Source Location Point of Withdrawal Point of Diversion Place of Use –Research Any Other Rights to Water –Compile a Database Phase II- Scope of Work Water Quantity Assessment

Estimate Actual Water Use –Withdrawal Data from Water Purveyors –Irrigation Use –Domestic Use- Group A Public Systems –Number of Exempt Wells, Group B –Water from Outside WRIA 40A –Commercial Use Incorporate into Water Balance Estimate Future Water Use Phase II- Scope of Work Water Quantity Assessment

Assess Multi-Purpose Storage –Options to Upgrade Existing Storage –Options to Create New Reservoirs –Alternative Storage Options: Aquifer Storage and Recovery Interconnections, Sharing, Transfer Stored Water Water Conservation and Reuse Phase II- Scope of Work Water Storage Assessment

Phase III- Scope of Work Watershed Plan Development Built Upon: –Objectives Developed in Phase I –Findings from Phase II –Continued Collaboration between Stakeholders

Phase III- Scope of Work Watershed Plan Development Identify Planning Issues Identify Potential Solutions Evaluate Solutions Design an Approach for Watershed Plan Implementation Prepare a Watershed Plan Report –Assist with Approval

Timeline and Deliverables

Summary Existing Data General Characteristics -area, relief, land use, precip -stream: number, flow rate, timing, sources -number water purveyors, wells -population Only relevant stats, don’t want to give them info they already know but do want to show we have been doing our homework

Existing Data- Surface Water -streams, lakes, ponds -storage, ditches, pipelines -climatic, flow, previous studies

Existing Data- Groundwater -Well distribution, productivity, depth (?)

Existing Data- Water Systems -storage, ditches, pipelines -interties, pump facilities -service areas

Existing Data- Water Rights -points of withdrawal, place of use, pints of diversion -include water rights names and numbers -claims (?) -spatial figure and water rights table

Workshop: Discussion and Expectations Tips for communication Develop Phase II Technical Subcommittee Constraints: Time and Budget –Streamlined, focused efforts

Setting Direction for Next Meeting RH2 Assessment Update (Aug or Sep?) –Progress update (Water Quantity and Storage) –Collect information to fill gaps –Opportunity for PU to modify direction Interim Phase II Technical Subcommittee meetings? –Determine date

How Can You help? Fill out questionnaire, give one to a friend –Rank importance of objectives –Data Form Review posters: add, confirm, or correct information Stay involved- come back!

Contacts Chelan County –Mike Kaputa: –Lee Duncan: RH2 Engineering –Randy Asplund: (509) ext 5366 –Bill Sullivan: (509) ext 5390 –Jim Bucknell: ext 5424 –Steve Nelson: ext 5406 Primary contacts are in bold print

Grant Funding and Requirements RCW Watershed Planning Water Quantity Assessment: –Surface and Groundwater (actual water) –Claimed Water, Water Rights (paper water), and Actual Use –Future Water Demand –Aquifer Recharge/Discharge Areas

Grant Funding and Requirements Water Quantity Assessment (cont.) –Water Available for Further Appropriation –Strategies for Increasing Water Supplies Multipurpose Water Storage Assessment –Projects support other elements of Watershed Plan Time Limit –How long for Phase II?????

Wenatchee Heights Area Pipe open ditches Line storage reservoir Create additional storage capacity Improve river system pumping (add pump station) Finalize WH Irrigation District boundary. Complete comprehensive use plan

Wenatchee Heights Area (Continued) Improve all water measuring and monitoring devices Improve Springhill reservoir outlet. Modernize telemetry system Upgrade PRV valve/controls Upgrade equalizing reservoir – controls and screening system

Beehive-Squilchuck Area (Concerns) WA Department of Ecology Expectations. Preservation of water rights Illegal water withdrawals Drought/low flows Water quality issue for domestic water use

Beehive-Squilchuck Area (Opportunities) Getting water from Beehive Reservoir to Squilchuck Creek Diversion of Squilchuck and Lake Creeks to Beehive Reservoir Replacement of irrigation delivery system pipe Enlargement of Beehive reservoir Upgrade of agriculture sprinkler systems. Mission Ridge reservoir and snowmaking/ storage Upgrade water boxes

Stemilt Area (Opportunities) Add additional storage – Fix Lilly Lake and develop new reservoir Determine water balance for watershed Investigate new joint reservoir with Squilchuck and Wenatchee Heights Secure uninterruptible water rights from Columbia River for Lower Stemilt District Provide domestic water to Big Springs

Malaga Area Need exist for protecting a higher source of recharge for downstream groundwater Recognize this year a 50% short-term water supply Effects on water supply of expected long-term growth Adequate water supply for Gallagher, Lockwood, Malaga Domestic, Three Lakes Districts and private individuals Recommend one watershed association represent the entire WRIA 40a Concern for loss of existing water rights

Malaga Area (Continued) Concern for potential loss of surface water and water rights out of the Columbia River. Concern over the use it, lose it versus water Trusts Control of wells without permits The amount of reserve water for growth Conflicts between orchard versus residential use of water Ability to move water rights downstream Effects of Irrigation District actions on water supply in the Malaga area. Surface protection for Lake Cortez and residents around it Recognize the benefits of area-wide planning through cooperation

Malaga Colockum Community Council Malaga Water District has the capacity for 1,000 residents, but at present is only serving 300 Concerned about uninterruptible water rights, particularly form the Columbia