Mandli Communications, Inc. Mandli’s Experience.

Slides:



Advertisements
Similar presentations
R O M D A S ROad Measurement Data Acquisition System
Advertisements

TRB 89 th Annual Meeting Traffic Monitoring of Motorcycles during Special Events Using Video Detection Dr. Neeraj K. Kanhere Dr. Stanley T. Birchfield.
Southeast Michigan Council of Governments Developing Regional Solutions.
City of Houston Street Surface Assessment Vehicle
-Roadway Inventory Data Processing and Maintenance -Roadway Statistics -Public Certified Mileage -Highway Performance Monitoring System -Centralized Roadway.
Pavement Preservation and Maintenance Private Roads Maintenance Workshop August 18, 2012.
Company Established in 1969 Infrastructure Information Collection Staff of more than 130 Design and build ARAN ® Largest and longest standing company.
Highway 46 in BeresfordHighway 19 North of Humboldt Highway 73 South of Lemmon Interstate 90 East of Wyoming Line.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 2 Surface Characteristics.
1 PAVEMENT DATA ITEMS. 2 Climate_Shapes (4 LTPP zones) Soil_Shapes Metadata Estimates Section level data HPMS Pavement Data Summary level data.
Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit.
The Company ViaTech is a Norwegian Company with a comprehensive range of tailor-made products and services aimed at road, rail and airport authorities.
May 2014 Operations Planning Construction Design VISION Process 1.Receive design files from Projectwise -Create Maps to determine ownership and maintenance.
Y A S O O B A L I b o r n o n 1 9 t h F e b r u a r y i n K a n p u r d i s t r i c t o f U t t a r P r a d e s h. H e s t a r t e d s i n g i.
© 2011 Autodesk How to Manage Pipelines and Reduce Risk Using Autodesk® Topobase™ Stephane VIVIAND Technical manager.
Macro-Texture Measurements and the Performance of Chip Seals Jose Weissmann Mariano Miguel Martino.
Richard J. Dobson Colin Brooks, Chris Ben Hart, Dave Dean - MTRI Unpaved Roads Data Collections.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
The Company ViaTech is a Norwegian Company with a comprehensive range of tailor-made products and services aimed at road, rail and airport authorities.
PAVEMENT CONDITION SURVEYS. Instructional Objectives n Need for condition surveys n Collection methodologies n Basic types of condition surveys n Different.
Data Collection for Determining Pavement Condition
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
PAVEMENT CONDITION INDICES. n Historic development of pavement condition indices n The basic functions of condition indices in PMS n Different types of.
Department of Electrical & Computer Engineering Team Hollot By: Cory Brett Jonathan Katon Thomas Pavlu Haiyan Xu NavFocus Midway Design Review.
Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District.
Microsimulation for Rural and Exurban Regions: Lake County, California David Gerstle (presenting) & Zheng Wei Caliper Corporation.
Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan HaynerGraphic Designer Peter Kennedy McMinnResearcher.
Gene V. Roe, Ph.D., P.E., PLS Managing Editor LiDAR News.
Complete High Speed Data Collection System
© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source: FHWA.
American’s with Disabilities Act GIS Inventory and Analysis Justin Furch, GIT Manager February 2014.
Remote Sensing for Asset Management Shauna Hallmark Kamesh Mantravadi David Veneziano Reginald Souleyrette September 23, 2001 Madison, WI.
5.4 – Fitting a Line to Data  Today we will be learning about: ◦ Finding a linear equation that approximated a set of data points ◦ Determining whether.
Evaluating Remotely Sensed Images For Use In Inventorying Roadway Infrastructure Features N C R S T INFRASTRUCTURE.
ODOT. Taking Care of What We Have. Asset Management, Life Cycle Analysis : A Three-Pronged Approach September 9th, 2015 Andrew Williams, Ohio DOT.
Applications of Remote Sensing in Transportation.
Ministry of Transportation Ministère des Transports Road Profiler User Group (RPUG) Stateline, Nevada September 28, 2011 Li Ningyuan Ministry of Transportation.
5 meters in 1 second: 5 m/sec 10 meters in 2 seconds: 5 m/sec 20 meters in 10 seconds: 2 m/sec Biking Speeds:
Pooled Fund Project: Improving the Quality of Pavement Surface Distress and Transverse Profile Data Collection and Analysis Andy Mergenmeier, P.E. Senior.
1 Hot-Mix Asphalt and Flexible Pavement Design: the MEPDG Kevin D. Hall, Ph.D., P.E. Professor and Head, Dept. of Civil Engineering University of Arkansas.
Roadway Intersection Inventory and Remote Sensing David Veneziano Dr. Shauna Hallmark and Dr. Reginald Souleyrette GIS-T 2001 April 11, 2001.
Automatic Pavement Cracking Distress Measurement System Bugao Xu and Yaxiong Huang University of Texas at Austin (512) December.
BUSINESS SENSITIVE 1 Pavement Health Track Analysis Tool for Determining the Health of Pavement Networks Sponsored by FHWA Contractor: Battelle/ARA Team.
TIN of the North East part of campus ECJ. Airborne LIDAR coverage of Dean Keaton St and surroundings CrossSection 56 Location.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Relationship between time, displacement, velocity, acceleration. Kinematic.
Insert picture(s) here Amy Simpson, Ph.D., P.E. Gonzalo Rada, Ph.D., P.E. Beth Visintine, Ph.D. Jonathan Groeger Rutting as a Performance Indicator.
1 COMPARISON OF MPD VALUES FROM HIGH- SPEED LASER MEASUREMENTS WITH MPD FROM TWO STATIONARY DEVICES Rohan Perera, PhD, PE Soil and Materials Engineers,
By the end of this section, you will be able to: 1. Determine the LCM of polynomials 2. Add and subtract rational expressions Class notes from ___________.
Summary 1 HPMS Training Course Course Summary. Course Objective To provide training to the States on the data collection and reporting requirements for.
FY 2011 PMIS Scores CST DivisionDE/DD/OD/RD MeetingAugust 16-18, 2011.
Office of Highway Safety Sight Distance and Roadway Condition Dan Walsh, P.E.
Data Collection Solutions A presentation by. Agenda Experience and Qualifications Video Pavement Management Geometrics and Measurement.
Pre-Proposal Conference REQUEST FOR PROPOSALS PAVEMENT CONDITION DATA COLLECTION SERVICES FOR NYSDOT CONTRACT #C
An Accuracy Assessment of a Digital Elevation Model Derived From an Airborne Profiling Laser Joseph M. Piwowar Philip J. Howarth Waterloo Laboratory for.
Rube Goldberg Project/Bottle Rocket Project Friday, May 13, 2016.
Copyright - Spatial Systems Associates, Inc
“Analysis of Pavement Condition along Ramon Magsaysay Boulevard by Pavement Distress Approach” Bachelor of Science in Civil Engineering Major in Transportation.
Iowa DOT 2016 pavement distress qc/qa
Town of Clayton 2016 Pavement Condition Survey
Performance Monitoring and Development of Common Data Platforms
A B A B C D C D A B A B C D C D A B A B C D C D A B A B C D C D
Lesson 4-6 Slope-Intercept Form
PASER Ratings for TwinCATS Planning Area
Lesson 4-6 Slope-Intercept Form
Slope-Point Form of the Equation for a Linear Function
An object travels 40 miles in 2 hrs. Calculate its speed?
Solving Linear Equations
Evaluate the integral {image}
Presentation transcript:

Mandli Communications, Inc.

Mandli’s Experience

(video place holder)

LCM S High resolution transverse profiling system Acquires 4 meter width images with 3D profiles of lanes Deliverable at FHWA HPMS standard Collected rutting, distress (linear, cracking, and area cracking), and slope of road Integrated LCMS data with LiDAR data

Project Scope Route driven from South Dakota to Wisconsin All data collected around 62 mph Slight configuration of data by Mandli to turn it into deliverable format Did calibrations everyday All data sets and deliverables had assigned GPS About 876 total miles traveled

Deliverables Rutting Road Joints Transverse cracks Slope of road Consistent, repeatable data

Deliverables Joint detection: (video place holder)

Deliverables Transverse crack detection:

Deliverables Transverse crack detection:

Deliverables Consistent data sets: (repeatability) (video place holder)

Future Development Macrotexture Seal Cracks IRI Won’t ever be able to do Patching

Thank You!