BUG SURVEYS : An Initiation of Transboundary Co- operation Małgorzata Landsberg-Uczciwek Voivodeship Inspectorate of Environmental Protection in Szczecin.

Slides:



Advertisements
Similar presentations
Ministry of Health Anna Starzewska-Sikorska, Ph.D. Coordinator of environmental part of Programme Institute for Ecology of Industrial Areas, Katowice POLISH.
Advertisements

Convention of the Protection and Use of Transboundary Watercourses and International Lakes Setting the scene for Session 1 National information systems.
Comments Mari KOYANO Graduate School of Law Hokkaido University 1.
How close are we in the Water Framework Directive’s Implementation ? Paul C.M. Frintrop Institute for Inland Water Management and Waste-Water Treatment.
REGIONAL WORKSHOP "AGRICULTURAL NUTRIENT POLLUTION CONTROL IN BLACK SEA DANUBE PARTNERSHIP COUNTRIES" Ministry of the Agriculture and Water Management.
Global Terrestrial Networks : The Hydrological Network.
“Participatory approaches towards water management: transboundary cooperation in the River Lielupe (Latvia/Lithuania) ” 9 June 2005, St. Petersburg,
Risk Reduction of Mining Accidents in the Tisa Basin Adriana Eftimie – Director PIU National Agency for Mineral Resources NATO/CCMS Pilot Study “Prevention.
UNDP-ENVSEC Project Fostering a Dialogue between Riparian States for Development and Establishment of Initial Legal and Institutional Frameworks for Increased.
International Cooperation in Water Management and Pollution Control in the Danube River Basin Joachim Bendow, ICPDR Executive Secretary 1.
RISK ASSESSMENT AS TOOL FOR POLICY MAKERS Roncak P., Adamkova J., Metelkova M. Slovak Hydrometeorological Institute, Jeseniova 17, Bratislava The.
COMPLEX ECOLOGICAL METHOD FOR THE EVALUATION AND BIOMONITORING OF THE QUALITY OF THE SOMES HYDROGRAPHIC BASIN, MONISOM.
LATVIAN ENVIRONMENT, GEOLOGY AND METEOROLOGY AGENCY Ilze Kirstuka Deputy Director Workshop of the Twinning project on Water Quality, 4-6 September, 2006.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Project Implementation Plan and Principal Activities
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
HELCOM as an International Tool of Environmental Protection of the Baltic Sea Mieczysław S. Ostojski, Ph.D. Mieczysław S. Ostojski, Ph.D. Chairman, Helsinki.
HELCOM – the focal point for environmental information in the Baltic Sea Area Nikolay Vlasov Information Secretary Helsinki Commission (HELCOM)
Module 4: RBM Planning regarding Blueprint document, training skills, transboundary issues, public consultations, negotiation skills Transboundary cooperation.
The EU Water Initiative National Policy Dialogues in Armenia & Moldova Pierre Hecq UNDP Water-CoP Meeting Almaty, October 2007.
National Environmental Research Institute Department of Freshwater Ecology WFD-Monitoring in Denmark NOVANA Brian Kronvang NERI.
June 12-16, 2005 Ottawa, Canada NATO CCMS Pilot Study PREVENTION AND REMEDIATION IN SELECTED INDUSTRIAL SECTORS: Mega-Sites Transboundary Cooperation for.
1 ASPECTS REGARDING PLANNING AND REPORTING RELATED TO RECOMMENDATION 331/2001/EC ON MINIMUM CRITERIA FOR ENVIRONMENTAL INSPECTION AND ITS IMPLEMENTATION.
UNDP-GEF Dnipro Basin Environment Programme1. 2 Dnipro basin map.
BUG PROJECT Information as a basis to establish transboundary cooperation: The experience of the Bug Pilot Project Małgorzata Landsberg-Uczciwek Voivodeship.
“Development of the Co-operation within the Convention on Long Range Transboundary Air Pollution” Karin Kindbom IVL Swedish Environmental Research.
Lake Peipsi/Chudsko-Pskovskoe – River Narva basin: working together on the new Eastern border of the EU Ago Jaani Ministry of the Environment Councillor.
Lessons learned from pilot projects on monitoring and assessment of transboundary rivers Martin Adriaanse.
IMPLEMENTATION OF THE WATER FRAMEWORK DIRECTIVE IN HUNGARY Eszter HAVAS-SZILÁGYI Ministry of Transport and Water Management Eszter HAVAS-SZILÁGYI Ministry.
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Powerpoint Templates Page 1 Powerpoint Templates Black Sea Basin Directorate – presentation of the scope, responsibilities and project interests Mrs. TANYA.
16 th meeting of the EUWI EECCA Working Group Impacts of climate change on water resources in Moldova and possible adaptation measures. Trans-boundary.
Svetlana Stirbu, Secretary of the National Working Group for the implementation of the UNECE Convention on Transboundary Effects of industrial Accidents.
Dzidra Hadonina Ministry of the Environment of the Republic of Latvia Kiev, Ukraine, November 22-24, 2004 Legal Framework for Cooperation in the River.
“Lake Peipsi/River Narva basin – working together on the new Eastern border of the EU” Harry Liiv Deputy Secretary General on Environmental Management.
Towards a harmonised water quality and pollution risk management LLIV-303 project “HOTRISK” Riga, LEGMC,
SEA in the Czech Republic Prague, 24 September 2008.
INTERNATIONAL ENVIRONMENTAL LAW Inland waters protection.
EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan
1 United Nations Economic Commission for Europe 1 ENPI/SEIS Consultation Meeting European Commission, Brussels, 11 November 2010 Current Situation and.
Approaches to decrease nutrient pollution in agriculture of Ukraine: reality and perspectives WORKSHOP “AGRICULTURAL POLLUTION CONTROL – GOOD PRACTICES”
3. Pilot projects on transboundary rivers under the UN/ECE Water Convention.
MODULE 1 Water Framework Directive, Relation of WFD with Daughter Directives, River Basin Management Planning, Water Bodies, Typology, Classification River.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
EU Project: Trans-Boundary River Management Phase II and Phase III for the Kura River basin – Armenia, Georgia, Azerbaijan ( Transboundary.
Experience from Russian-Estonian cooperation in Lake Peipsi basin Kristjan Piirimäe Status assessment of lakes ecosystems in the Central and Eastern Europe.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
Joint bodies according to the UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes Francesca Bernardini United.
The Kura River Basin JTTF Group of participants from South Caucasus proposes establishing tri-lateral Joint Technical Task Force (JTTF) for a transboundary.
TISZA RIVER BASIN SUSTAINABLE DEVELOPMENT PROGRAM (TRB-SDP) Challenge for Transboundary Cooperation Kálmán MORVAY & Péter VARGA PhD Tisza-Szamos Public.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
DIRECTIVE 2000/60/EC 2 nd MEETING CHEMICAL MONITORING ACTIVITY (CMA) BRUSSELS, 17 th NOVEMBER 2005 Chemical Monitoring Activity Draft Outline of a Guidance.
International Network Of Basin Organizations topic 3.1: “Basin Management and Transboundary Cooperation”. Operational tools  Long term basin management.
Advocacy Activity of the Eastern Partnership Territorial Cooperation Support Programme November 5, 2014 Tbilisi, Georgia Lyubov Palyvoda, Advocacy Expert.
Capacity-building from the perspective of the ECE Industrial Accidents Convention Virginia Fusé, UNECE secretariatIspra26/03/2015.
Institute of Meteorology and Water Management, Wroclaw Branch - PP 10 Wrocław,
TRANSBOUNDARY WATERCOURSES IN THE UNECE REGION Guidelines to complete the information data sheet for transboundary rivers Finnish Environment Institute.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
River Narva basin: Narva reservoir and Lake Peipsi
The Rhine and its water quality
The design of the monitoring network for lakes and rivers in Finland
D8 and D9 REVIEW PROCESS April-June 2014: February 2015:
Experiences of designing WFD-monitoring networks in the Netherlands
Meeting of Water Directors WFD Common Implementation Strategy
LIFE and the implementation of the Water Framework Directive
Scheldt Pilot River Basin
by B. M. Gawlik, L. Galbiati, J. Zaldivar, G. Bidoglio
Transboundary cooperation in the Dniester River basin
Presentation transcript:

BUG SURVEYS : An Initiation of Transboundary Co- operation Małgorzata Landsberg-Uczciwek Voivodeship Inspectorate of Environmental Protection in Szczecin Teresa Zań Regional Water Management Board in Warsaw

The Bug River basin is situated in the north-west part of Ukraine, south-western Belarus and the central- eastern part of Poland and is within the Baltic Sea catchment area. The total area of the Bug basin is 39.4 thousand km 2, which is 19.3% of the Vistula basin.

The area of the basin belongs to the different administrative regions in each country. Ukraine – 27.4%, Belarus – 23.4%, Poland – 49.2 % of total area.

Transboundary co-operation in the basin In the agreement between Poland and the USSR on co-operation in water management (1964), the countries established monitoring networks on the bordering part of the river Bug. Before 1992

After 1992 Ukraine The agreement between the Governments of the Republic of Poland and Ukraine on co-operation in the field of water management on rivers crossing their mutual border (Kiev, October 10, 1996). Belarus The agreement between the Ministry of Environmental Protection, Natural Resources and Forestry of Poland, and the State Committee of the Belarus Republic for Ecology, on co-operation in the field of environmental protection (May 20, 1992).

Polish-Ukrainian Committee for Co-operation in the Field of Boundary Waters :  a working group for planning,  a working group for protection against pollution,  a working group for flood protection, river regulation and land melioration,  a working group for hydro-meteorology and hydro- geology,  a working group for accidental pollution control.

Pilot Project  The Pilot Project under the UNECE Water Convention started in January  The Memorandum of Understanding (MoU) was signed in 1997.

Preparatory phase – the inception: political and managerial character  the preparation of project proposal and funding of the project,  the establishment of project organisation,  the inception report, including a description of the river-basin, current monitoring and assessment practices, responsible institutions, project organisation; resulting in a project plan for each river-basin,  the conclusion of the overall project plan for the pilot-project programme.

Preparatory phase – monitoring and assessment needs analysis – experts involvement:  an inventory of available information,  legislation,  surveys to obtain an insight into the omission of information,  a specification of information needs,  the development of strategies for the monitoring and assessment,  recommendations for improvement.

Survey targets  occurrence or non-occurrence of substances,  potential toxicity of water or sediments,  distribution of aquatic species or communities,  homogenity of water quality over a river cross section,  variability of water quality in time and space.

Common sampling targets  to understand the physical condition of the river system,  assessment the current sampling points,  joint sampling, analyses, and evaluation,  involvement of different laboratories in a combined, joint initiative.

New information after survey  Significant differences were recorded in many of the results (including traditional parameters) even though each national laboratory used accredited methods.  The need for good interlaboratory comparability has become both a national and international issue. Common sampling

New information after survey  Stress for pollution of these substances is rather low (PAHs were found in sediments).  Most of the findings for organic micropollutants are first-time-results.  It is strongly recommended that investigations and laboratory analyses for confirmation of the results should continue. Organic micropollutants  The methodology and comparability of these analyses need to be improved and adjusted to one system of environmental criteria. Heavy metals

New information after survey  Chronic toxicity based on various biological tests of water and sediments was evident in a number of samples in the Ukrainian, Belarusian and Polish part.  The toxicity discovered was not always consistent with chemistry. Such cases need to be investigated further.  A set of tests can be chosen as very convenient tool to determine the level of chemical contamination of water. Toxicity tests  The whole study showed that the river Bug is potentially capable of recovery to ‘good’ ecological status. Hydrobiology

Sampling points for transboundary monitoring

Parameters which should be included in transboundary monitoring  basic parameters,  oxygen regime,  nitrogen and phosphorus compounds,  heavy metals in water and sediments: to be decided after laboratory analysis issues are solved,  organic micropollutants in sediments: PAHs,  hydrobiological parameters,  polar pesticides in water (target analysis), screening in water LC/MS and screening in water and sediments GC/MS - not more than once a year.

Experiences on working together  Respect the differences in legislative systems and levels of making particular decisions.  Realities which limit co-operation between countries. How to organise co-operation practically  When planning future activities, delays in making decisions should be considered, and emergency procedures in the event of accidents formulated. Unexpected situations

Experiences on working together  The planned continuity of activities appropriate to the financial condition provides the chance to strengthen the transboundary co-operation. Financial aspect  The first data exchange between Poland, Ukraine and Belarus conceived on such a large scale which also includes data relevant for water management analysis. Exchange of data

Experiences on working together  Growing mutual trust and the interest of experts from different countries, were both noticeable (e.g. sources of pollution, ‘hot spots’). Involving experts and knowing each other

Summary The realisation of the Pilot Project for the Bug River basin, opens a new chapter in the transboundary co-operation between Poland, Ukraine and Belarus. Common samplings have marked the beginning of practical co-operation in the basin on an international and regional level. The co-operation requires the understanding and integration of activities inside riparian countries and between the institutions involved in monitoring and management.