1 RBM Workplanning and Budgeting-FAO Managing for results in FAO Module II. Operational Planning ‘Workplanning’

Slides:



Advertisements
Similar presentations
Il Project Cycle Management :A Technical Guide The Logical Framework Approach 1 1.
Advertisements

Project Management Concepts
Donald T. Simeon Caribbean Health Research Council
Prepared by BSP/PMR Results-Based Programming, Management and Monitoring Presentation to Geneva Group - Paris Hans d’Orville Director, Bureau of Strategic.
1 Professionalising Programme & Project Management Developing programme & project management capacities for UNDP and national counterparts External Briefing.
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
What is a project? Project Management Institute definition
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
Project Management Session 7
Six Steps to a Better WBS Presented by 41 Bloomfield Street Lexington, MA USA © 2011 Project Management Partners.
Development plan and quality plan for your Project
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Computer System Analysis
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Initiating and Planning Systems Development projects
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
Software Testing Lifecycle Practice
IMPLEMENTATION OF THE BWP & PERFORMANCE MONITORING AND ASSESSMENT.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Achieving peak performance in contracting for services Presentation to the 10 th IPPU CPD Grand Imperial Hotel 31 st March, 2012 John F. A. Etidau.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Project Life Cycle.
SESSION 3: FROM SETTING PRIORITIES TO PROGRAMMING FOR RESULTS.
Pre-Project Components
M ODULE 6 PART 1: Planning and Stakeholder Management GLOBAL FUND GRANT CONSOLIDATION WORKSHOP DATE.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
1 RBM Workplanning and Budgeting-FAO Managing for results in FAO Module III. Budgeting, review and approval.
0 ©2015 U.S. Education Delivery Institute While there is no prescribed format for a good delivery plan, it should answer 10 questions What a good delivery.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
Informal Consultation on Priorities for FAO Assistance in Europe and Central Asia Region – 23/24 March 2010, Budapest, Hungary FAO Programme Approach and.
Results Matrix (LFM) and Results-Based Budget (RBB) Mariangela Bagnardi.
NFM: Modular Template Measurement Framework: Modules, Interventions and Indicators LFA M&E Training February
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Chapter 3 Managing the Information Systems Project
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
Activity Planning.
Chapter 3 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Project Management Process Groups
Chapter 3 Managing the Information Systems Project
Helene Skikos DG Education and Culture
Chapter 6 Activity Planning.
Chapter 6 Activity Planning.
Software Testing Lifecycle Practice
Chapter 3 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Chapter 2 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Presentation transcript:

1 RBM Workplanning and Budgeting-FAO Managing for results in FAO Module II. Operational Planning ‘Workplanning’

2 RBM Workplanning and Budgeting-FAO 1. Distribution of staff costs across organizational results 2. Validation of unit results 3. Development of products and services and related activities for each UR and preparation of workplans 4. Adjustment of estimated planned costs for URs 5. Review of financial feasibility of URs 6. Quality assurance 7. Final approval of workplans Operational Planning Steps in the workplanning process

3 RBM Workplanning and Budgeting-FAO Step 1 Distribution of staff costs across organizational results TBA Watch this space!

4 RBM Workplanning and Budgeting-FAO Step 2 Validation of unit results A UR is a significant, measurable output that a sub-regional office, regional office or HQ division is held accountable for achieving through the delivery of a series of individual products and services. URs are linked to one only OR, in a logical, technically and programmatically sound relationship URs must be SMART, what the Unit - will achieve, and be accountable for - in contribution to the OR - within the biennium - with developed indicators, at least 1 per UR, - together with data sources, baselines and targets - set out in a performance measurement matrix.

5 RBM Workplanning and Budgeting-FAO Tips in Reviewing URs From the Unit’s perspective Are the URs logically linked, technically and programmatically sound? Do they state clearly what the Unit will achieve and how? Can they be consolidated? Will the UR indicators work? Valid, reliable, sensitive, simple, practical and useful? Baselines and Targets? From the OR perspective across Units Are the URs logically linked and coherent? Are they necessary and sufficient to achieve the OR? Any duplication of effort? What’s missing? Who will do it?

6 RBM Workplanning and Budgeting-FAO Step 3 Development of products and services and related activities for each UR and preparation of workplans Define products and services needed to achieve the UR Products and services – outputs of an activity or series of activities Products are final, tangible things Services are on-going, less tangible; typically delivering policy, advice, support, advocacy, guidance Each product or service is linked to only one UR Consider all the activities needed to deliver a product or service Each activity must link with only one product or service

7 RBM Workplanning and Budgeting-FAO Tips in Defining Products and Services In specifying a product or service, define its scope; SMARTly described, manageable with responsibilities assigned, technically and financially feasible within the biennium; in enough detail to allow costing All work done by a unit must be reflected in its products and services, so that it can be costed and approved for the whole biennium. Work done that contributes to the UR of another unit will be in the workplan of the ‘owning’ unit, not the ‘contributing’ unit. Consult across units/offices on collaborative work

8 RBM Workplanning and Budgeting-FAO More tips in Defining Products and Services Apply the ‘necessity and sufficiency’ test. - Are the activities necessary and sufficient to deliver the products & services? - Are the products & services necessary and sufficient to deliver the UR? Carry out a risk analysis, defining your assumptions at each level - the conditions needed to do each activity, to deliver each product & service and to achieve the Unit Result. Do a critical path analysis to identify problems in scheduling, possible parallel tasking etc.

9 RBM Workplanning and Budgeting-FAO Critical Path Analysis Write all necessary activities, one per postit On each postit, write how long it will take Arrange the postits on flipchart in the sequence in which they have to be done, linking where they are interdependent; show where parallel tasking is possible Determine the critical path, the minimum time it will take to deliver the product or service Set key stages as milestones to assess progress Use the CPA later when you come to estimate costs. Inception 3 months Partner planning 2 month Training 6 months Policy development 3 months Product Start Study design 2 months Research study 4 months Procure 7 months Install 4 months Trials 6 months Review 2 months Critical Path

10 RBM Workplanning and Budgeting-FAO Groupwork Your turn Steps 1-3 based on your own unit