FACILITIES MASTER PLANNING Committee Data and Findings.

Slides:



Advertisements
Similar presentations
Over 25 years of innovative management consulting Anne Arundel County Public Schools Strategic Facility Utilization Study Update Community Presentation.
Advertisements

Pathway to Excellence & Equity September 25, 2007.
Ridgefield School District Capital Facilities Plan March 9, 2010.
Understanding the North Carolina School Report Card.
Critical Condition Triaging School Enrollment Growth School Board Work Study November 13, 2013.
February 16, Tonight’s Agenda  Review Assets and Challenges From Last Meeting  Review Necessary Assumptions  Look at Possible Considerations.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
The Condition of Higher Education in Iowa. You can access the full report from our Higher Education Data Center
HSD Hazelwood 1 st Board of Education Presentation – May 18, Hazelwood 1 st Recommendation May 18, 2010.
Rezoning Study -Committee Meeting 2- November 15, 2011.
B ALTIMORE C ITY P UBLIC S CHOOLS State of Our School Building 1 DRAFT.
St. Joseph’s (Thamesford) Accommodation Review Committee Public Meeting St. Joseph’s Catholic Elementary School April 30, 2013.
Board Update November 21, What is Tower Pinkster's Charge? 1.To assess the existing conditions of the Portage Public School Buildings and Sites.
UNIT 5 REDISTRICTING COMMUNITY FORUM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm.
Porter Ranch Community School Addition Project
Enrollment, Projections, Class Size and Facility Information Report Prepared by: Chace B. Anderson, Assistant Superintendent Jay Willemssen,
Superintendent’s Recommendations for District Improvement Related to Facility Needs VICTORIA PUBLIC SCHOOLS.
GUIDELINES FOR DEVELOPMENT OF STUDENT ASSIGNMENT BOUNDARIES Board of Education Meeting Eugene Street Board Room July 12, 2011.
Presented to the Board of Trustees Davis Demographics & Planning, Inc. Riverside, California February 10 th, 2009 Upland Unified School District.
A Long Term Solution Oak Ridge Addition. NPD117’ s Core Values Visionary Leadership Learning-Center Education Organizational and Personal Learning Managing.
Long Range Facility Planning assisted by Silver Falls School District.
The 20/20 Vision Report to the Board of Education January 2009.
PISD High Schools: A Vision and Plan for the Future March 22, 2012 Board Presentation.
Attendance Area Committee Timeline, process, and scope of project.
Missoula County Public Schools Overview of Planning January 2014.
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
RFP# 99FY12 Ashlawn ES/Williamsburg ES June 8, 2012.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
ACPS & City of Alexandria 1.  Long Range Educational Facilities Plan to improve facilities planning, accommodate the growing student population, and.
August 18, 2011 Facility Master Plan Master Plan Presentation “Listen” “Listen”“Understand”“Create”
NEXT STEPS – BOND PROGRAM Facilities Master Plan Update Facilities Subcommittee – March 17, 2015.
West Sylvan Enrollment and Capacity
SUPERINTENDENT’S RECOMMENDATIONS Capacity Utilization Arlington Public Schools December 17, 2009.
Joint City Council – School Board Meeting July 12, 2012 Maintaining Temple City’s Excellent, Award-Winning Schools.
Montebello Unified School District CMAA Presentation April 17, 2014 Bond Program Update.
Ridgefield School District Capital Facilities Plan March 9, 2010.
2016 BOND REFERENDUM Parent Advisory Council 11/17/15.
Camas School 2016 Bond Fall 2015 A History of Caring, Quality, and Growth.
Maintenance & Operations Replacement Levy and School Improvements Bond Election Day: February 9, 2016.
A Blue Print for Collecting School Facilities Data.
2014 Citizens’ Bond Advisory Committee Board Presentation June 17, 2014.
Facilities Master Plan and Projects Update Encinitas Union School District February 15, 2005.
West Contra Costa Unified School District Long-Range Facilities Master Plan West Contra Costa Unified School District Long-Range Facilities Master Plan.
West Contra Costa Unified School District Long-Range Facilities Master Plan West Contra Costa Unified School District Long-Range Facilities Master Plan.
PERRIS ELEMENTARY SCHOOL DISTRICT Superintendent’s Advisory Attendance Area Advisory Committee Report December 10, 2015.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education August 4, 2014 Stakeholder Engagement and Communications Services.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
District Local Planning Committee Orientation Part 2 Trimble County Schools Kentucky Department of Education Division of District Support - District Facilities.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
Student Reassignment Analysis for the Lexington Public Schools Project Introduction & Update for the LPS School Committee February 2, 2016.
Wahoo Public School District Facility Planning Update April 18, 2016.
Quincy School District’s Vision For the Future Election Day: February 9, 2016.
Planning for “capital” levy and future “capital” bonds What do you think? CRC staff meeting October 6, 2015 Everett Public Schools 1.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
Valley View Local Schools SELF ASSESSMENT/STRATEGIC PLAN UPDATE MARCH 2016.
Tumwater School District Facilities Advisory Committee October 24, 2012.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
Program and Accommodation Review Burlington Secondary Schools Director’s Preliminary Report October 5, 2016.
Capital Construction Bond Program
Building Configuration Presentation
Capital Planning Advisory Group April 11, 2018
Wauwatosa School District
Dublin Unified School District
Referendum Discussion
Update to Board of Trustees: November 9 FAC Meeting
Pillager Public School District Community Survey Results
Attendance Boundary Development & Revisions
Welcome Financial Recovery Advisory Committee
East Troy Community School District Community Survey Results
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

FACILITIES MASTER PLANNING Committee Data and Findings

Overview of Presentation  Enrollment and capacity considerations  Physical condition considerations  Functional adequacy considerations  Current status  Moving forward

Five accepted models for enrollment projections were reviewed. Data from the highest, lowest, and mid- range estimates were used in Facilities Advisory Committee considerations. Enrollment Projections

Enrollment Projection – Districtwide Year15-16* Lower Estimate6,4426,4096,3196,2336,1596,088 Best Estimate6,5056,5106,4786,4486,4296,419 Higher Estimate6,5696,6126,6366,6626,6996,745 * Actual October 2015 enrollment: 6,603

Initiative 1351 mandates smaller class sizes in all grade levels, and has an impact on school capacities. Capacity studies reflect these smaller class sizes. Initiative 1351

Capacity vs. Enrollment - Elementary Year Capacity*2,447 Projected enrollment 3,0903,1033,0963,098 3,103 Capacity Surplus (Deficit) (643)(656)(649)(651) (656) *I-1351 Figures

Capacity vs. Enrollment – Middle School Year Capacity2,094 Projected Enrollment 1,4421,4321,4401,4371,4431,435 Capacity Surplus (Deficit) *I-1351 Figures

Capacity vs. Enrollment – High School Year Capacity1,928 Projected Enrollment 1,9731,9761,9431,9141,8901,882 Capacity Surplus (Deficit) (45)(48)(15) *I-1351 Figures

Capacity Findings* Elementary Schools  Projected to be 126% utilized by 2021 if I-1351 is fully implemented. Middle Schools  Projected to be 69% utilized by 2021 if I-1351 is fully implemented. High Schools  Projected to be 98% utilized by 2021 if I-1351 is fully implemented. *Portables are not part of the calculation.

Physical condition assessments were based on a score resulting from an examination of permanent (non- portable) space using the state’s building condition criteria. Physical Condition

Physical Condition Findings Schools (all buildings) in “Poor” condition and approaching the need for complete modernization or replacement:  Broadway  Columbia Valley Gardens Elementary  Discovery High School  Mark Morris High School  Mint Valley Elementary  Northlake Elementary  Olympic Elementary

Physical Condition Findings Schools with selected buildings in “Poor” condition and approaching the need for complete modernization or replacement:  Columbia Heights Elementary Annex Building  Kessler Elementary Auditorium

Functional analysis ratings resulted from a review of how well a building serves the educational processes. Functional Adequacy

Functional Adequacy Findings Schools with significant elements of “Poor” or “Unsatisfactory” functional adequacy that should be corrected when the buildings are modernized or replaced for physical condition reasons:  Broadway  Columbia Heights Elementary  Discovery High School  Mint Valley Elementary  Northlake Elementary  Olympic Elementary  R.A. Long High School

Combined Condition Findings Schools in “Poor” physical condition and in “Poor” or “Unsatisfactory” functional adequacy:  Broadway  Discovery High School  Mint Valley Elementary  Northlake Elementary  Olympic Elementary

Add’l Philosophical Considerations  Neighborhood walking schools at elementary  Demographic balance (including socio-economic)  Optimal student body size  Class size equity between schools

After extensive study and deliberation, the Facilities Advisory Committee presents the following conclusions and timeline. Current Status

FAC Planning Conclusions FindingPriority Elementary is the area of most need. A number of elementary schools are past their life expectancy and need to be replaced or modernized. Elementary schools would include lunchrooms and accommodate up to 500 students in classes that satisfy I-1351 sizes. 1 High School is the area of next greatest need – high schools were last modernized in 1984 and Middle School is the area of third greatest need – middle schools were most recently improved with bond funds. 3 Districtwide facilities is an area with varying degrees of needTBD

Elementary Needs Overview Replace Mint Valley $30.0 million Replace Northlake $30.0 million Replace Olympic $18.0 million Modernize CVG $27.0 million Increase capacity at Kessler $ 8.3 million Add cafeteria to Robert Gray and St. Helens $ 4.6 million Replace auditorium and gym at Kessler $ 8.7 million Replace Columbia Heights $18.0 million Total estimated cost $144.6 million

High School Needs Overview Modernize Mark Morris (not incl. state match) $25.0 million Upgrade* Mark Morris HVAC $ 3.0 million Upgrade secondary track facility and fields $ 2.0 million Add auxiliary gyms at Mark Morris and R.A. Long $ 5.2 million Add R.A. Long music and parking $ 2.1 million Add R.A. Long vocational facilities $ 2.1 million Replace Discovery $ 8.0 million Total $47.4 million * Intermediate measure

Districtwide Needs Overview Security Updates Districtwide$ 2.0 million Replace Central Kitchen/Warehouse $ 7.5 million Modernize Broadway $11.4 million Total $20.9 million

FAC Projects Identified Local Costs Security updates Districtwide$2 million Replace Mint Valley $30 million Replace Northlake $30 million Upgrade Mark Morris HVAC $3 million Upgrade secondary track facility and fields $2 million Replace Olympic $18 million Modernize CVG $27 million Increase capacity at Kessler $8.3 million Add cafeteria to Robert Gray and St. Helens $4.6 million Modernize Mark Morris $25 million Add auxiliary gyms at Mark Morris and R.A. Long $5.2 million Replace auditorium and gym at Kessler $8.7 million Add R.A. Long music and parking $2.1 million Replace Discovery $8 million Replace Central Kitchen/Warehouse $7.5 million Modernize Broadway $11.4 million Add R.A. Long vocational facilities $2.1 million Replace Columbia Heights $18 million

FAC Projects Identified Local Costs Add R.A. Long music and parking $2.1 million Replace Mint Valley $30 million Security updates Districtwide$2 million Replace Northlake $30 million Modernize Broadway $11.4 million Add auxiliary gyms at Mark Morris and R.A. Long $5.2 million Replace Discovery $8 million Upgrade Mark Morris HVAC $3 million Add cafeteria to Robert Gray and St. Helens $4.6 million Upgrade secondary track facility and fields $2 million Modernize CVG $27 million Replace Olympic $18 million Modernize Mark Morris $25 million Replace Columbia Heights $18 million Increase capacity at Kessler $8.3 million Replace auditorium and gym at Kessler $8.7 million Add R.A. Long vocational facilities $2.1 million Replace Central Kitchen/Warehouse $7.5 million

Master Plan Schedule

Master Plan Next steps after approval

Communications overview Staff Parents Under-represented Business Community The district needs to reach a diversity of audiences to deepen the understanding of the planning process, our building’s current conditions, and obtain feedback on the FAC’s considerations  Group meetings  One-on-one  Surveys  Mass media  Social media

Board expectations  Necessary information?  Number of options?  Pathways to address the plans?

Staff questions In your opinion what should be  The district’s top priority grouping?  The district’s second priorities?  The district’s third priorities?