Short report on MPPC gain monitoring system S. Uozumi Jun-27 2008 ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.

Slides:



Advertisements
Similar presentations
HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Advertisements

LED calibration systems for CALICE hadron calorimeter June 11, 2011TIPP 2011, Chicago1.
Comparison of 3 types of scintillator strips and 2 types of reflector films Miho NISHIYAMA Shinshu-U Light yield of 3 scintillator strips have been measured.
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak Institute of Physics (FZU), Prague June 11, 2011TIPP 2011, Kvasnicka1 The.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
Setup of Gain Monitoring System with Mr. Uozumi Kobe Univ. Hiroko Ikeda 18,May 2007.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
LED calibration systems for CALICE hadron calorimeter
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Beam test of scintillator strips Miho NISHIYAMA Shinshu University ・ scintillator strip calorimeter ・ Kuraray scintillator strips and KNU extruded ・ the.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
Effect of flat cable to MPPC signal S. Uozumi (Kobe) Jun ScECAL meeting.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
R&D of MPPC for T2K experiment PD07 : Photosensor Workshop /6/28 (Thu) S.Gomi T.Nakaya M.Yokoyama H.Kawamuko ( Kyoto University ) T.Nakadaira.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
Study of the MPPC for the GLD Calorimeter readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group May 29 – Jun 4 DESY Introduction.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
1 Development of Multi-Pixel Photon Counters (1) S.Gomi, T.Nakaya, M.Yokoyama, M.Taguchi, (Kyoto University) T.Nakadaira, K.Yoshimura, (KEK) Oct
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
KEK BT Summary &Plan Shinshu University Miho Nishiyama.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
Development of Multi-Pixel Photon Counters(MPPC) Makoto Taguchi Kyoto University.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group (KNU, Kobe, Niigata, Shinshu, ICEPP.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak, Institute of Physics, Prague June 11, 2011TIPP 2011, Kvasnicka1 The CALICE.
Multipixel Geiger mode photo-sensors (MRS APD’s) Yury Kudenko ISS meeting, KEK, 25 January 2006 INR, Moscow.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Beta-ray test for strip scintillator readout MPPC GLD Cal group KEK 06/2/28 (Tue) Niigata university Sayaka IBA.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Jet Energy Measurement at ILC Separation of jet particles in the calorimeter is required for the PFA  Fine granular calorimeter is necessary. Particle.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
Short Summary of the Japan- Korea KNU Oct GLDCAL meeting S. Uozumi (Shinshu) 3 rd Japan-Korea joint meeting is held on Oct at Kyunpook.
The Scintillator-ECAL 2 nd Prototype S. Uozumi (Kobe) Jun
Study and Development of the Multi-Pixel Photon Counter for the GLD Calorimeter Satoru Uozumi (Shinshu, Japan) on behalf of the GLD Calorimeter Group Oct-9.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
Development of Multi-Pixel Photon Counters (1)
Light mixer proposal Arjan Heering, Anton Karneyeu
LED notched fibre system short HBU0 party with QMB6
SuperB meeting, Annecy 3-17, 2010
ScECAL+AHCAL+TCMT Combined Beam FNAL
Update on MPPC frontend electronics development at IU
Presentation transcript:

Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel is crucial for : keep measuring the MPPC gain … Correct drift of the MPPC gain occurred by some reasons. Also indispensable for saturation correction. A few photoelectrons are necessary in each channel. Electronics inter-calibration … need to measure gains of electronics in low and high gain mode. Also necessary for the saturation correction. Large amount of light (~100p.e., at least >10p.e.) is necessary to be distributed.

So far, not so good… (Ikeda-san`s talk on Jun-13) ● :acrylic plate ● :side emitting fiber 1 ● :side emitting fiber 2 ● :optical fiber with notches Dark noise level (0.02 p.e.)

Revision of the system Look over whole system and correct any problematic points. – Optical connections – status of fiber – Fixture of fiber – And so on … Change LED to very bright one. Use CMB to issue LED driving pulses.

Some remarks on light distribution Connection between different fiber/material causes a lot of light loss. We should just use clear fibers, rather than acrylic bars or side-emitting fibers with clear fiber bundles. After realizing this, only the choice is clear fiber with notches. We will adopt it for the FNAL BT. Acrylic bar Clear fiber Almost of lights are lost here Clear or side-emitting fiber Clear fiber with v-shape notches

Revised bench-test system CMB Cable (~5cm) LED Fiber bundle (20 fibers ganged)  1mm clear fiber Scintillator-layers (Kuraray fiber mega-strip used at 2007 DESY BT) V-shape notches

CMB Originally developed for AHCAL calibration system by Prague guys. Can drive up to 12 LEDs. Provide 8-50 ns pulse into LED. Currently bench test is ongoing with borrowed CMB, but 2 CMBs will be delivered soon from Prague. Control through CANbus is recently succeeded by Daniel. CANbus line Power TCALIB (timing signal) VCALIB (amplitude signal) 12 LEDs

LED Emission angle Blightness (arbitrary unit) Wavelength (mm) PDE of the MPPC Adopt Nichia NSPW500GS-K1 W-rank white LED One of the most efficient LED currently available. Brightness : I F =20mA (~x3 blighter than LED previous used) Forward voltage / current : V / 30mA (100mA possible with pulsing mode) Emission spectrum more-or-less matches to MPPC PDE spectrum.

Clear fiber bundle Bundle of 20 clear fibers, made for 2000 HCAL beam FNAL. Diameter of the fiber is 1mm. (One concern : does it fit to 1 mm gap in ScECAL?) Fiber length ~ 75cm. White disk is attached for fixture purpose.

Notches on the clear fiber Making many uniform notches is important. To achieve that, melting method by heating tool would be better than cutting or gliding.  =0.8mm wire is used as a space to control the depth of notches. With the notched fiber, stronger light is emitted to opposite side of the notches. LED Notches

Fiber arrangement on the mega-strips Mega-strips (Kuraray fiber readout, used at DESY BT) 3mm-wide slits are made on reflector and black sheet. (2mm hole will be enough for actual system at FNAL) Notched fiber is put on the slit (notches come upside) and fixed by black tape. Notched fiber To bundle Holes for MPPCs

Result of quick test CMB DAC count can be set to counts. (it is proportional to amplitude of the LED driving pulse.) LED starts flashing around DAC~100 counts. With DAC~120, we saw >10 photons at most far-side strip. With higher DAC setting (>150 DAC count), all the strips get too much light which causes ADC overflow. Plots and numbers will follow soon, but notched fiber seems to be distributing large amount of lights more than enough!

Summary & Plans Revised system with CMB, new LED and notched fibers works well for the MPPC gain monitoring. At the first quick test, we saw large amount of light with this system. Plots, numbers and some more tests will follow soon. At the same time, we will design the actual layout of the system at the FNAL beamline.