PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration1 FM ILT Spectrometer Wavelength Calibration Status Report H. Feuchtgruber.

Slides:



Advertisements
Similar presentations
PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
Advertisements

PACS SVR 38/9 Nov 2007 Wavelength Calibration1 FM ILT Spectrometer Wavelength Calibration Status Report H. Feuchtgruber, R. Vavrek.
Planetary Imaging with PILOT Jeremy Bailey Anglo-Australian Observatory March 26th 2004.
Line Efficiency     Percentage Month Today’s Date
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
PAIRITEL Photometry of Dwarfs from the IRAC GTO sample Joseph L. Hora Brian Patten, Massimo Marengo Harvard-Smithsonian Center for Astrophysics 2 nd Annual.
PACS CoP & PV Review 21/22 Jan 2009 PVSpecWave1 Spectrometer Wavelength Calibration XHSPOT Proposal: PVSpecWave H. Feuchtgruber.
0. To first order, the instrument is working very well ! 1.Evolution of the IR detector with time 2.Stability of the L channel 3.Saturation 4.Linearity.
APOGEE: The Apache Point Observatory Galactic Evolution Experiment l M. P. Ruffoni 1, J. C. Pickering 1, E. Den Hartog 2, G. Nave 3, J. Lawler 2, C. Allende-Prieto.
FM-ILT Results of the PACS FM1 Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
PACS FM-ILT SPECTROMETER SPATIAL CALIBRATION A. Contursi (H. Feuchtgruber) PACS Science Verification Review – 8/9 November 2007 MPE-Garching.
FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS Spectrometer Spatial Calibration plan in PV phase A.Contursi D. Lutz and U. Klaas.
Academia Sinica National Taiwan University AMiBA System Performance Kai-yang Lin 1,2 and AMiBA Team 1,2,3 1 Institute of Astronomy and Astrophysics, Academia.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
Precision Measurement of CO 2 Hotband Transition at 4.3  m Using a Hot Cell PEI-LING LUO, JYUN-YU TIAN, HSHAN-CHEN CHEN, Institute of Photonics Technologies,
PACS SVR 22/23 June 2006 Scientific/Performance Requirements1 PACS Science and Performance Requirements A. Poglitsch.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 SPIRE Broad-Band Photometry Extraction Bernhard Schulz (NHSC/IPAC)
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS ICC Readiness Review MPE, July 3/ PACS Photometer PV Phase Plan 1 Status Report M. Nielbock: PACS PHOT PV Phase Plan Markus Nielbock (MPIA)
DIODE-LASER AND FOURIER-TRANSFORM SPECTROSCOPY OF 14 NH 3 AND 15 NH 3 IN THE NEAR-INFRARED (1.5 µm) Nofal IBRAHIM, Pascale CHELIN, Johannes ORPHAL Laboratoire.
The 6dF Galaxy Survey - The First Year Will Saunders Anglo-Australian Observatory.
Overview, Spectrometer Products and Processing Philosophy Phil Appleton on Behalf of PACS Team PACS IFU Spectrometer.
11-Jun-04 1 Joseph Hora & the IRAC instrument team Harvard-Smithsonian Center for Astrophysics The Infrared Array Camera (IRAC) on the Spitzer Space Telescope.
Scisat Test Readiness Review MAESTRO Evaluation and Verification Tests University of Toronto 29 January 2003.
PACS NHSC Data Processing Workshop Aug 26-30, 2013 Page 1 SPIRE Spectrometer Data: Calibration Updates, User Data Reprocessing, and Other Issues Nanyao.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Interannual Variability and Decadal Change of Solar Reflectance Spectra Zhonghai Jin Costy Loukachine Bruce Wielicki (NASA Langley research Center / SSAI,
- page 1 PACS Phil Appleton on behalf of the NHSC/HSC and the PACS ICC ; especially Bart Vandenbussche and Pierre Royer (KUL Belgium) Instrument Performance.
Rev 131 Enceladus’ Plume Solar Occultation LW Esposito and UVIS Team 14 June 2010.
Markus Nielbock (MPIA) – PACS Calibration Status Report Herschel Calibration Steering Group Meeting #24 PACS Calibration Status Report Markus Nielbock.
Jan 2016 Solar Lunar Data.
Herschel Calibration Workshop
Planetary Models for Herschel
PACS / SPIRE cross-calibration on prime fidicial standard stars
ESAC 2017 JWST Workshop JWST User Documentation Hands on experience
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
UVIS Calibration Update
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
UVIS Calibration Update
Jan Sun Mon Tue Wed Thu Fri Sat
Electricity Cost and Use – FY 2016 and FY 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration1 FM ILT Spectrometer Wavelength Calibration Status Report H. Feuchtgruber

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration2 Overview of Measurements (1) Nov/Dec 2006: FMILT1 - 2 short scans of water vapour cell and few laser lines measured (initial calibration done, report available) Mar 2007: FM ILT2 - Measured FIR-Laser lines [µm] (5 days): - CH 3 OH: [ , , , , , ] x 5 chopper angles; - 13 CH 3 OH: [ , ] x 5 chopper angles; - CH 3 18 OH: [ , , ] x 5 chopper angles; - Gas cell measurements (with Kapton foil) : - H 2 O: (27 hours) One Measurement consists of full scan vapour + full scan vacuum” Filter A (C=[0.1pF(blue), 1pF(red)] x 3 chopper angles Filter B (C=[0.1pF(blue), 0.2pF(red)] x 3 chopper angles - CO: (3 hours) Grating range scan pair: vacuum + CO gas at 1 chopper angle

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration3 Overview of Measurements (2) June 2007: FMILT3 Gas cell measurements (without Kapton foil): - H2O: (9 hours) One Measurement consists of full scan vapour + full scan vacuum Filter A (C=[0.1pF(blue), 1pF(red)] x 1 chopper angle Filter B (C=[0.1pF(blue), 0.2pF(red)] x 1 chopper angle

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration4 FIR Laser Setup TUFIR window Extended, but structured source with substantial contrast Substantial laser power variation (recorded within setup) Scan parameters Range: ~ steps (up&down) Stepsize: 100 Readouts per ramp: 64 Ramps per position: 3

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration5 Gas Absorption Setup Focus window Extended and controlled background source Source T=600°C (H 2 O) and T=400°C (CO) Absorption path ~56cm p= 9mBar (H 2 O) and p=70mBar (CO) Scan parameters - Range: Stepsize: Readouts per ramp: 64 - Readouts per position: 3

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration6 Calibration Method (1)  =  ;  =  =0.6253; g LHe = µm; n=[1,2,3] ; pix=[1..16]  =  0 + (p 1 -1)*(gratpos/dgrat) + p 2 *(gratpos/dgrat) 2 + p 3 *(gratpos/dgrat) 3 with dgrat = [steps/  ] δpix n = mean[δpix n,FILT1 (module)]

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration7 Calibration Method (2) Begin with calibration from FILT1 (few lines measured only) Calculate up/down corrected and divided spectra (gas/vacuum) for each pixel: F foreground (λ) + T gas (λ)*F background (λ) Ratio = F foreground (λ) + F background (λ) with F foreground (λ)  (20…50) x F background (λ) Calculate model spectra (at expected PACS spectral resolution) for the wavelength range under investigation and define spectral intervals for correlation analysis Determine λ-calibration offsets for each interval Store 3 rd order polynomial parameters fitted to offsets vs. (gratpos/dgrat) for each pixel  new =  old + polynomial fit Iterate previous steps (at least twice)

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration8 Results A semi-automatic method to calibrate each pixel in each array has been developed λ-calibration 3 rd order polynomials for all individual spectrometer pixels have been derived Separate sets of polynomials have been calculated for the 3 main PACS spectrometer bands and the “extra” band (2 nd order via filter A: 54-73µm) CO line positions are compliant with calibration based on water Laser positions largely compliant with calibration, however few single pixels show still some significant deviations  to be corrected in a case by case analysis Laser lines may show peak-center variations due to actual position of laser spots within the slit. This is the initial uplink calibration for flight

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration9 Data Quality (1) Typical data used during correlation analysis single pixel

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration10 Data Quality (2) single pixel rebinned module

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration11 Accuracies PCD V8.0 (sec ): Required accuracy: “Peak position to within 10-20% of a spectral resolution element” In general the requirement is met throughout all bands however at band borders, due to leakage effects and lower S/N the calibration accuracy (in terms of σ over all pixels) is closer to 20% of a spectral resolution element, while in band centers, σ values even better than 10% are obtained. σ=stdev(all_pixels residual λ-shift vs. model) Absolute verification against Laser and CO lines Relative verification by combining all pixels Be aware: relative position of point sources within slit can have significant effect

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration12 Remarks Depth of grating scans (normalized to line scan AOT):3 rd order (2.5h), 2 nd ’ order (2.5h), 2 nd order (2.8h),1 st order (3.6h); (time1st= 58steps × 0.75sec × 2updown × 3numres × 2vapvac × 25modules / 3600sec ) HDO lines are detected (abundance ~3e-4; partial pressure 2.7e-6 bar) CO spectra show residual lines from water contamination Faintest lines ~3e-18W/m 2 C=1pF C=0.1pF C=0.2pF n=3, 2’ n=1 n=2 Leak models

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration13 Depth of grating scans (normalized to line scan AOT):3 rd order (2.5h), 2 nd ’ order (2.5h), 2 nd order (2.8h),1 st order (3.6h); (time1 st = 58steps × 0.75s × 2updown × 3numres × 2vapvac × 25modules / 3600s) HDO lines are detected (abundance ~3e-4; partial pressure 2.7e-6 bar) CO spectra show residual lines from water contamination Faintest lines ~3e-18W/m 2 Remarks

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration14

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration15 Verification with Laser Lines Expected Line centers and slit widths overplotted

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration16 Next Steps / Open Work Investigate/recalibrate few outlying pixels found during verification against Laser lines. The reason is essentially the poor S/N in the measurements during FM ILT 2. Calibrate –L/+L chopper throws, spot checks indicate that there is no significant change in calibration… Provide Report and Calfiles (version as of this report provided for PACS spectrometer pipeline) Check calibration and eventually recalibrate for FMILT 3 measurements

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration17 Wavelength Calibration in Flight (1) Observing modes: –Use standard SpecRangeScan AOT –Use Wave_Cal mode with pointing request Suitable target list : - PICC-ME-TN-013, ”Use of late type stars for PACS wavelength calibration”, (D. Lutz) -“Photometric and Spectroscopic Calibration of Herschel Instruments with Planets and Satellites”, (Th. Encrenaz, R. Moreno, A. Coustenis) –Uranus(H 2 O), Neptune(H 2 O, CO), Saturn(H 2 O, NH 3, PH 3 ) –Jupiter (H 2 O, NH 3, PH 3 ; fills entire 5x5 field of view !)

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration18 Wavelength Calibration in Flight (2) Target Visibilities in 1 st two windows (HSPOT): Jupiter: [5-Sep-08, 9-Nov-08]; [11-Apr-09, 17-Jun-09] Saturn: [12-Nov-08, 10-Jan-09]; [5-May-09, 8-Jul-09] Uranus: [11-Nov-08, 8-Jan-09]; [16-May-09, 18-Jul-09] Neptune: [15-Oct-08, 12-Dec-08]; [16-Apr-09, 16-Jun-09] Mars:[18-Aug-09, 9-Dec-09]; R Leo:[19-Oct-08, 16-Dec-08]; [15-Apr-09, 15-Jun-09] R Crt:[13-Nov-08, 16-Jan-09]; [12-May-09, 18-Jul-09] W Hya:[31-Jul-08, 29-Aug-08]; [25-Dec-08, 25-Feb-09] R Aql:[6-Sep-08, 16-Nov-08]; [4-Mar-09, 15-May-09] R Cas:[31-Jul-08, 3-Sep-08]; [2-Dec-08, 2-Mar-09]

PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration19 Wavelength Calibration in Flight (2) Target Visibilities in their 1 st two windows (HSPOT): Start PV Start Routine Ops Mars 18-Aug-09 – 9-Dec-09