1 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 1 Vladimir N. Litvinenko Collider-Accelerator Department,

Slides:



Advertisements
Similar presentations
Overview of Low Energy RHIC e-Cooler (LEReC) project and needed RHIC upgrades Vladimir N. Litvinenko Department of Physics and Astronomy, Stony Brook.
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Merminga, LRP2007, Jan e + p/A Facilities Lia Merminga Center for Advanced Studies of Accelerators Jefferson Laboratory January 12-14, 2007.
Design Considerations LHC hadron beams: E p =7 TeV E A =E e  Z/A Luminosity O (10 33 ) cm -2 s -1 with Beam Power 100 MW (wall plug) Integrated e ± p.
Ion Accelerator Complex for MEIC January 28, 2010.
1 LHeC Considerations for a Lepton Hadron Collider Option for the LHC F. Willeke, BNL The 4th Electron Ion Collider Workshop Hampton University,
4 th EIC Workshop Hampton University, VA Richard Milner 1 Electron-Ion Collider Accelerator Workshop Summary and Outlook EIC biennial meeting Hampton,
4th Electron-Ion Collider Workshop, Hampton University, May BNL R&D ERL and Coherent Electron Cooling test at RHIC Outline Goals of R&D ERL.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Recirculating pass optics V.Ptitsyn, D.Trbojevic, N.Tsoupas.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
V.N. Litvinenko, ElC Collaboration Meeting, Hampton University, May, 2008 Vladimir N. Litvinenko C-AD, Brookhaven National Laboratory, Upton, NY,
V.N. Litvinenko, ElC Collaboration Meeting, Hampton University, May, 2008 Staging of eRHIC Increased Reach in c.m. Energy and Luminosity Vladimir.
MeRHIC Design V.Ptitsyn on behalf of MeRHIC Design team: M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, A. Burrill, R. Calaga, X. Chang, A. Fedotov,
Electron and Ion Spin Dynamics in eRHIC V. Ptitsyn Workshop on Polarized Sources, Targets and Polarimetry Charlottesville, VA, 2013.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Brain Gestorme: Status of the LHeC Ring-Ring / Linac- Ring Basic Parameters I appologise to talk about things you already know...
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
Peter Paul 12/16/06e-A Collider concept1 Brief History of the e-A Collider Concept Peter Paul BNL/SBU.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
18 th International Spin Physics Symposium Polarized Beams at EIC V. Ptitsyn.
Thomas Roser EIC collaboration workshop MIT, April 6, 2007 eRHIC Design eRHIC Schemes R&D Items Cost and Schedule.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Synchrotron radiation at eRHIC Yichao Jing, Oleg Chubar, Vladimir N. Litvinenko.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
V.N. Litvinenko, 30 th FEL Conference, Gyeongju, Korea, August 28, 2008 PROGRESS WITH FEL-BASED COHERENT ELECTRON COOLING Vladimir N. Litvinenko, Ilan.
Page 1 An lepton energy-recovery-linac scalable to TeV Vladimir N. Litvinenko Stony Brook University, Stony Brook, NY, USA Brookhaven National Laboratory,
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
UMass Amherst Christine Aidala Jacksonville, FL Measuring the Gluon Helicity Distribution at a Polarized Electron-Proton Collider APS April Meeting 2007.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
2009 RHIC & AGS Annual Users' Meeting June eRHIC Conceptual Design V. Ptitsyn, J. Beebe-Wang, I. Ben-Zvi, A. Burril, R. Calaga, H. Hahn, A. Fedotov,
ERHIC design status V.Ptitsyn for the eRHIC design team.
BROOKHAVEN SCIENCE ASSOCIATES Electron Cooling at RHIC Enhancement of Average Luminosity for Heavy Ion Collisions at RHIC R&D Plans and Simulation Studies.
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
D. Trbojevic, N. Tsoupas, S. Tepikian, B. Parker, E. Pozdeyev, Y. Hao, D. Kayran, J. Beebe-Wang, C. Montag, V. Ptitsyn, and V. Litvinenko eRHIC and MeRHIC.
F. Willeke, Snowmass Luminosity Limitations of e-p Colliders Extrapolation from HERA Experience Examples for IR Layout LINAC-Ring Limitations HERA.
Page 1 A route to LHeC with luminosity Linac-ring design, including stability Vladimir N. Litvinenko Stony Brook University, Stony Brook, NY, USA.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
V. Ptitsyn on behalf of eRHIC Design team: E. Aschenauer, M. Bai, J. Beebe-Wang, S. Belomestnykh, I. Ben-Zvi, M. Blaskiewicz, R. Calaga, X. Chang, A.Fedotov,
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
eRHIC Design and R&D From RHIC to eRHIC
Possible EIC-relevant tests at CERN’s ERL TF
Beam-beam effects in eRHIC and MeRHIC
R&D Topics for FOA Funding Proposals
Large Booster and Collider Ring
Beam-beam R&D for eRHIC Linac-Ring Option
An lepton energy-recovery-linac scalable to TeV Vladimir N
eRHIC with Self-Polarizing Electron Ring
A brief Introduction of eRHIC
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC (SSC) Byung Yunn CASA.
Why is the CBETA Important for the Electron Ion Colliders?
Why CeC is needed? High luminosity of US future electron-ion collider(EIC) is critical for success of its physics program 2018 NAS Assessment of U.S.-Based.
MEIC New Baseline: Luminosity Performance and Upgrade Path
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Presentation transcript:

1 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, Vladimir N. Litvinenko Collider-Accelerator Department, Brookhaven National Laboratory Upton, NY,USA Design consideration of two scenarios for electron-hadron collider eRHIC at Brookhaven (ring-ring and ring-ERL) clearly demonstrated use of energy-recovery linac as the electron drive allows attainment of significantly higher luminosities. This talk will be focus of ERL based design of eRHIC, its advantages and challenges. Relevance of this approach for LHeC will be also discussed. ERL-based electron-hadron colliders: From eRHIC to LHeC?

2 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Content What eRHIC is about Choosing the focus: ERL or ring for electrons? –Advantages and challenges of ERL driver –R&D items for ERL-based eRHIC –New developments 5-cell SRF cavity Small magnets for eRHIC loops Kink instability Electron beam disruption during the collision Simulations of the beam-beam effects Coherent electron cooling Staging Relevance to LHeC - some results & numbers Conclusions

3 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Conclusions first  ERL seems to be the most promising approach for high energy, high luminosity electron-ion and polarized electron-proton collider  It can take advantage of any ring-ring concept and go further  There is a clear possibility for eRHIC (LHeC?) staging  Presently there is no show-stoppers but a significant amount of R&D  At BNL the R&D ERL tests start in 2009, MIT’s progress with developing high current polarized gun, prototyping of small gap magnets are in progress …..  LHeC based on this principle reach level of luminosity -natural topic for collaborating with BNL

4 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 eRHIC Scope -QCD Factory e-e- e+e+ p Unpolarized and polarized leptons 2-20 (30) GeV Polarized light ions (He 3 ) 215 GeV/u Heavy ions (Au) (130) GeV/u Polarized protons 25  (325) GeV Electron accelerator RHIC 70% beam polarization goal Positrons at low intensities Center mass energy range: GeV New requirements: eA program for eRHIC needs as high as possible energies of electron beams even with a trade-off for the luminosity. 20 GeV is absolutely essential and 30 GeV is strongly desirable. e-e-

5 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 eRHIC is based on the main BNL’s investment: hadron complex of RHIC NSRL 2 superconducting rings 3.8 km circumference RHIC: ions (D, Cu, Au…) GeV/u polarized protons GeV AGS 1-30 GeV 20TeV x 20TeV gold ions eRHIC will take full advantage of e-cooling

6 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, View from 2004: How eRHIC can be realized? –Ring-ring: –Linac (ERL)-ring: RHIC Electron storage ring RHIC Electron linear accelerator Advantages & Challenges of ERL based eRHIC Allows use of RHIC tunnel 2-3 fold higher energy of electrons Higher luminosity up to cm -2 sec -1 Multiple IPs Higher range of CM-energies + high luminosities Full spin transparency at all energies No machine elements inside detector(s) No significant limitation on the lengths of detectors ERL is simply upgradeable eRHIC can be staged Novel technology Need R&D on polarized gun May need a dedicated ring positrons 10x2503x250 3x5010x50 5x50 5x250 In Ring-ring luminosity reduces 10-fold for 30 GeV CME. Required norm.emittance (for 50 GeV protons) ~3 mm*mrad

7 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Luminosity Markers show electron current and (for linac-ring) normalized proton emittance. In dedicated mode (only e-p collision): maximum  p ~ ; Transverse cooling can be used to improve luminosity or to ease requirements on electron source current in linac-ring option. For proton beam only e-cooling at the injection energy is possible at reasonable time (~1h) Calculations for 166 bunch mode and 250 GeV(p) x 10 GeV(e) setup Ring-ring, with cooling (13p mm*mrad) Ring-ring, no cooling Linac-ring 0.26 A 15p mm*mrad 0.26 A 7.5p mm*mrad 0.26 A 5p mm*mrad 0.5 A 15p mm*mrad Courtesy of V. Ptitsyn

8 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 CM vs. Luminosity eRHIC –Variable beam energy –Polarizes electrons and protons –p-He 3 -U ion beams –Light ion polarization –Large luminosity ERL-ring eRHIC Ring-ring eRHIC TeV GeV ERL-ring LHeC

9 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Bargman, Mitchel,Telegdi equation ERL spin transparency at all energies Total angle Has solution for all energies! ii Gun  eSTAR ePHENIX 

10 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Baseline: ERL-based eRHIC  10 GeV electron beam energy, upgradeable to 20 GeV by doubling the main linac  5 recirculation passes ( 4 of them in the RHIC tunnel)  Multiple electron-hadron interaction points (IPs) and detectors  Full polarization transparency at all energies for the electron beam  Ability to take full advantage of transverse cooling of the hadron beams  Possible options to include polarized positrons (compact storage ring; Compton backscattered) - Though at lower luminosity Four recirculation passes PHENIX STAR e-ion detector eRHIC Main ERL (1.9 GeV) Low energy recirculation pass Beam dump Electron source Possible locations for additional e-ion detectors ©V. Ptitsyn

11 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Baseline: ERL-based eRHIC Parameters High energy setupLow energy setup pepe Energy, GeV Number of bunches166 Bunch spacing, ns71 Bunch intensity, Beam current, mA Normalized 95% emittance, p mm.mrad Rms emittance, nm  *, x/y, cm Beam-beam parameters, x/y Rms bunch length, cm201 1 Polarization, % Peak Luminosity, 1.e33 cm -2 s -1 Aver.Luminosity, 1.e33 cm -2 s Luminosity integral /week, pb ©V. Ptitsyn

12 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Current vision of eRHIC: Increased the Energy Reach and Luminosity Effective use of cooling Staging MEIC: Medium Energy Electron-Ion Collider –Located at IP2 (with a modest detector) –2 GeV e - x 250 GeV p (45 GeV c.m.), L ~ cm -2 sec -1 eRHIC - Full energy, nominal luminosity, inside RHIC tunnel –30% increase of RHIC energy is possible with replacing DX magnets –Polarized 20 GeV e - x 325 GeV p (160 GeV c.m), L ~ cm -2 sec -1 –30 GeV e x 130 GeV/n Au (120 GeV c.m.), L ~ cm -2 sec -1 –Based on present RHIC beam intensities –With coherent electron cooling the electron beam current is 25 mA –1.92 MW total for synchrotron radiation. –Power density is 1 kW/meter and is well within B-factory limits (8 kW/m) eRHIC - High luminosity at reduced energy, inside RHIC tunnel –Polarized 10 GeV e - x 325 GeV p, L ~ cm -2 sec -1 –Polarized positrons (with lower luminosity) Potential for replacing RHIC lattice with 8T, 0.8 TeV ring –i.e. potential for HERA with tow-three orders higher luminosity

13 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Stage I -RHIC with ERL inside RHIC tunnel MEIC with 2 GeV IP2 Asymmetric detector 0.95 GeV SRF linac 100 MeV ERL 2 GeV e-beam pass through the detector 3 vertically separated passes at 0.1 GeV, 1.05 and 2 GeV

14 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, GeV e x 325 GeV p eRHIC with ERL inside RHIC tunnel 2 x 200 m SRF linac MeV/m 4-5 GeV per pass 5 (6) vertically separated passes eSTAR ePHENIX

15 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Main advantages of ERL + cooling Main point is very simple: if one cools the emittance of a hadron beam in electron-hadron collider, the intensity of the electron beam can be reduced proportionally without any loss in luminosity o increase in the beam-beam parameter for hadrons Hadron beam size is reduced in the IR triplets - hence it opens possibility of further  * squeeze and increase in luminosity Electron beam current goes down, losses for synchrotron radiation going down, X-ray background in the detectors goes down….

16 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Coherent electron cooling Amplifier of the e-beam modulation via FEL with gain G FEL ~ Modulator:region 1 a quarter to a half of plasma oscillation Kicker: region 2, less then a quarter of plasma oscillation Longitudinal dispersion for hadrons Electrons Hadrons E>E o EoEo E<E o vhvh 2 R D// FEL 2 R D  FEL EzEz

17 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Transition to a stationary state: Coherent Electron Cooling vs. IBS IBS in RHIC for eRHIC, 250 GeV, N p = Taken from Beta-cool,  A.Fedotov This allows a)keep the luminosity as it is b)reduce polarized beam current down to 25 mA (5 mA for e-I) c)increase electron beam energy to 20 GeV (30 GeV for e-I) d)increase luminosity by reducing  * from 25 cm down to 5 cm Dynamics: Takes 12 mins to reach stationary point

18 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Decrements for hadron beams with coherent electron cooling MachineSpecies Energy GeV/n Trad. Stochastic Cooling, hrs Synchrotron radiation, hrs Trad. Electron cooling hrs Coherent Electron Cooling, hrs 1D/3D RHIC PoP Au /0.06 eRHICAu130~1 20,961  ~ /0.05 eRHICp325~100 40,246  > /0.3 LHCp7,000~ 1,00013/26    0.3/<1

19 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Main R&D Items Electron beam R&D –Energy recovery technology for high power beams (BNL) R&D ERL - high current, low emittance beams, stability, low losses Multi-cavity cryo-module development –High intensity polarized electron source (MIT & BNL) Development of large cathode DC guns existing current densities ~ 50 mA/cm 2, good cathode lifetime. Development of SRF polarized gun –Development of compact recirculating loop magnets BNL) Design, build and test a prototype of dipole and quadrupole Design, build and test a prototype vacuum chamber Main R&D items for hadron beams (BNL) –Polarized 3 He production (EBIS) and acceleration –166 bunches (50% more bunches in RHIC) –Proof-of-Principle of the Coherent Electron Cooling

20 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, MeV 20 MeV 2-3 MeV SC RF Gun SC 5 Cell cavity Beam dump IR-2 layout for Coherent Electron Cooling proof-of-principle experiment DX 19.6 m Modulator 4 m Wiggler 7m Kicker 3 m

21 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 eRHIC loop magnets and vacuum chamber: LDRD project 5 mm 20 GeV e-beam 16 GeV e-beam 12 GeV e-beam 8 GeV e-beam Common vacuum chamber Small gap provides for low current, low power consumption magnets Magnetic design - W.Meng, mechanical engineering - G.Mahler Starting studies of the acceptable field errors and of the alignment tolerances First dipole prototype is in hands C-Quad 25 cm C- Dipole eRHIC G=26 T/m B=0.33 T All vacuum chamber Thickness mm Sag microns

22 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Why Linac-Ring for LHeC looks not as strong?

23 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Nobody can afford a regular full-energy linac for a full-luminosity electron-hadron collider! In eRHIC ERL 20GeV, 500mA beam will have reactive power of 10 GW ! Regular linac - RF transmitter alone will cost $5/W -> $50,000M Hence - ENERGY RECOVERY IS THE MUST

24 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Scaling for ERL based LHeC Thus, in LHeC practical limit is the power of RF system to compensate synchrotron radiation of electrons

25 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 ERL based LHeC with cooling: 20 x luminosity ElectronsProtons Energy 70 GeV7 TeV N per bunch Rep rate, MHz 40 Beam current, mA Norm emittance,  m  *, m 0.25 *D*D Luminosity, x cm -2 sec Loss for SR, MW 20-

26 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 ERL based LHeC with cooling: additional considerations ElectronsProtons Energy 70 GeV7 TeV Angular spread,  rad Distance to parasitic collision point,m 3.5 Crossing angle,  rad ±100 Separation (in sigma)

27 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 ERL based LHeC with cooling 100 GeV electrons ElectronsProtons Energy 100 GeV7 TeV N per bunch Rep rate, MHz 40 Beam current, mA Norm emittance,  m  *, m 0.25 *D*D Luminosity, x cm -2 sec Loss for SR, MW 20-

28 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 ERL based LHeC with cooling: higher energy ElectronsProtons Energy 140 GeV7 TeV N per bunch Rep rate, MHz 40 Beam current, mA Norm emittance,  m  *, m 0.25 ** Luminosity, x cm -2 sec / 0.12 Loss for SR, MW 20Kink  =0.03 Hard radiation may be a problem Without cooling - luminosity is 13 times lower

29 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 ERL based LHeC: lower current e-beam Luminosity cm -2 sec -1 at all energies of e-beam (probably will be limited by burn-off of the proton beam) –Or “ ring-ring” luminosity of cm -2 sec -1 with 3 mA electron beam current and 2.2 MW loss for SR e-beam current is low (because of the cooling!) If further reduction of  * is possible, L~ is feasible Higher energies of electrons are possible e-Beams with very low emittance are possible -> larger  * for electron - easier optics, longer detectors, less modulation effects by synchrotron oscillations…. 100 GeV e-beam with luminosity up to cm -2 sec -1 Normalized emittance of electrons ~ 3  m is possible - no problems to match the proton beam 100 GeV,  e = ~ 300  p, i.e. proton normalized emittance can be as low a 0.01  m N e ~  norm;  norm : 3.8  m -> 0.1  m -> N e = E e =100 GeV, I e = 20 mA, SR loss =57 MW (the same as Ring-Ring with 100 x luminosity) This case requires additional studies of beam disruption and kink instability

30 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Other considerations Is there room for linac in the straights? Would ERL (for the most part) fit inside the LHC tunnel.

31 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Conclusions  ERL seems to be the most promising approach for high energy, high luminosity electron-ion and polarized electron-proton collider  It can take advantage of any ring-ring concept and go further  There is a clear possibility for eRHIC (LHeC?) staging  Presently there is no show-stoppers but a significant amount of R&D  At BNL the R&D ERL tests start in 2009, MIT’s progress with developing high current polarized gun, prototyping of small gap magnets are in progress …..  LHeC based on this principle reach level of luminosity -natural topic for collaborating with BNL

32 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, 2008 Contributors V. Ptitsyn Y. Hao E. Pozdeyev D. Trbojevic N. Tsoupas I. Ben Zvi D. Kayran A. Fedotov J. Beebe-Wang T. Roser G.Wang Inputs A. Deshpande T. Ulrich S.Vigdor D. Lowenstein C. Montag - following talk