AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?

Slides:



Advertisements
Similar presentations
Small cryotrap – control rack Nov Piano temporale Mid Jan: RR Begin Feb:order of the cryostat May:cryostat on site, rack ready.
Advertisements

ILIAS WG1 meeting - Birmingham1 Cryogenic Trap Vs Brewster window & noise coupling through windows J. Marque.
UHV gate valve Readiness Review 20Sept2012. Notes/remarks/proposals 1) with standard configuration, seems hard to keep cold the actuator? ( VAT) 2) position.
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Pipes Single Wall Pipes Double Wall Pipes
Mass Spectrometry Fault finding and trouble shooting Or: Giving the bullet to those pesky faults.
Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group TAC 2013, F. Makahleh, Vacuum & Cooling 1.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
Q&A Smalltraps RReview 19Feb2014. From C. Michel: Congratulations for the Vac Team: the project is mature and ready for the manufacturing step. Nevertheless.
2035 Series. Common Components The design of the 2035 Series valve includes many proven components for assured reliability. These items include: –Same.
Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.
Manip 6” Diameter TSP shield Top Level Middle Level Bottom Level Lower Level CF flanges Not threaded except wide bore Table top 3’ high (Al table top)
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
Test Mass Discharging System (TMDS) Design Review 20 Nov 2014 Rich Abbott, Dennis Coyne, Eddie Sanchez, Calum Torrie 1 LIGO-G v1.
LCGT Vacuum System VAC (YS) 1 1. Overview Items ** two beam tubes of 3-km long and 800 mm in diameter ** optical baffles distributed at every 12.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
BOILER PLANT OPERATION Presented By Mr. Sivanand Ray
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
Ethernet (EPICS VLAN) IOC Gauge ControllerMass Flow ControllerTurbo Pump Controller Analog and Digital Signals Beamline Gate Valves Mass Flow Unit Turbo.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Stephen Schuh Vacuum Controls Hardware 27 February 2006 LCLS Vacuum Controls Hardware Meeting 27 February 2006.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
Techniques of Vacuum and Basics of High Voltage (2/3) Pauli Heikkinen Jyväskylä University.
Vacuum system.
Polarized GaAs photo cathode development and the preparation of Gatling Gun cathodes at BNL The Single Cathode Activation Chamber.
AdV cryotrap: cryostat surface is partially exposed to the near mirror (input ~ end). Its seismic shaking is amplified by LN2 boiling. The rest of vacuum.
Applied Systems News FWEC*A Rudolf BARET HEISSIG.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
AdV-VAC meeting 21Apr’09 Agenda 1) results from the reviews (A.Pasqualetti) 2) present wbs, present project planning, baseline design (A.Pasqualetti) 3)
Vacuum Control System AdV architecture similar to the existing one one autonomous station per “pumping unit” (about 30 units : tower, tube station, cryopumps.
Center for the Advancement of Natural Discoveries using Light Emission Vacuum system for the AREAL linear accelerator Vacuum Systems A.Gevorgyan.
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
CUE – Make Any Pump an E-Pump
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Installation of the T600 at Fermilab CSN2, September 22,
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
1 1Dr. V.P.Ovsiannikov Cryogenics and vacuum in Dreebit EBITs The vacuum problem in EBIST is the problem of ensuring high vacuum into a long drift tube.
ET Vacuum System 3 x (low frequency cryo-interferometer + high frequency warm-interferometer) Baseline solution Build one detector, the other two will.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
1 Before degassing RGA head After degassing RGA head RGA scans of test dewar December 23, 2005 (PR and SP) Ion Gauge readings : Vacuum (with RGA off) before.
18 MW TURBINE CONTROL PANEL
Vacuum Considerations on ESS-DTL Carlo Roncolato 06/09/2012 Istituto Nazionale Fisica Nucleare Laboratori Nazionali di Legnaro.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Installation of the T600 at Fermilab
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
MICE Meeting at RAL, Oct-23, 2005
Preliminary Y-chamber specifications – First draft
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Test box for ProtoDUNE SP – Integration Test
Effective Methods to Test the Fuel Pressure Regulator in your Car.
1MB/sec streaming data out 32 data lines in 4 RS-232 ports Cryopanel
AdV - Internal Review of VAC subsystem
Periodical meeting about the 'control system ‘
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
Presentation transcript:

AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ? Turbo_PR Turbo_SR Remote_scroll 300mN 300mW Ions

AdV Vacuum system changes, Feb2010 ‘NDRC option b’ Layout Preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryopump SR? Cryopump PR? Remote_scroll 300mN 300mW Ions DN? As a different with respect to present, the Link Valves shall close automatically to protect the vacuum inside tubes/towers

Station Turbo_PR or Turbo_SR, preliminary Turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters Automatic valve with position indicator 2 gauges, to be purchased, normally same to the ones we have, but not necessarily Automatic valve with position indicator To the remote scrolls Tower links PI PE

Ions, preliminary Could be grouped near IB, DT, MC and also distributed (An option is to remove one TSP pump (P32) and put one Ion pump on that port). In alternative two additional Ion groups could be installed on two links, for instance near BS. 2 Ion pumps, 1 controller, for instance Varian starcell DUAL per pompe ioniche: RS232 RS422 RS485 ETERNET Manual valve with position indicator 2 gauges, (PI+PE) to be purchased, normally same to the ones we have, but not necessarily manual valve with position indicator Tower links PI PE

Centralized scrolls, preliminary Scrolls, to be purchased, could have rs232 Automatic valves with position indicator 3 PI gauges, to be purchased, normally same to the ones we have, but not necessarily TowerIBTowerPR TowerBS TowerWITowerSRTowerNI TowerDT In parallel to V91, tbc ? PI

Cryotraps_DT/IB or Cryopumps_SR/PR, preliminary tbc

Cryotraps 1of2, preliminary 2 systems like this one per each trap Manual valve 200CF with position indicator 2 gauges to be purchased, normally same to the ones we have, but not necessarily manual valve with position indicator Large valve / tower link Turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters Automatic valve with position indicator 2 gauges Automatic valve with position indicator Local scroll and also remote scroll? Automatic valve with position indicator existing large valve, to be linked to the control PE RGA PI PE 2 TSP pumps Manual valve with position indicator New or from 0m/3000m? Not from NI/NE...

Cryotraps 2of2, preliminary. Cryogenic controls, pid for level control and external tank Electronics driver to be read (tbc) by remote, normally with a few low level output or rs232 or other Automatic proportional valve, with position indicator, tbc Automatic valve to be linked to the temp control existing large valve, to be linked to the temp control Level 1 External Tank LN2 Electronics driver to be read by remote, normally with a few low level output or rs232 or other Level 2 PID PID level regulator to be read by remote, normally with a few low level output or rs232 or other. Could retransmit the level and valve status Temperature Some temp readouts to be acquired. The controller will have relays to close also valves in case of high temp alarms

Double oring on bottom flanges. From the point of view of control system, it is one additional gauge per tower (pirani) PI CF16, to be metal sealed in case of helicofles Double orings on end tower viewports too

300m N and W, preliminary 2 TSP pumps, 2 controllers. Manual valve with position indicator, existing 2 gauges, (PI+PE) to be purchased, normally same to the ones we have, but not necessarily manual valve with position indicator 3km tube, 300m from input PE PI

Turbo-booster at the existing tube stations 0m, 600m,... (preliminary) Smaller turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters Existing turbo pumping group V21, V22, P21, P22, G21, G22 To the scroll 3km tube station 0, 600,... PI