Ofgem Review Group on Energy Market Issues for Biomethane Projects (EMIB) Update on Issues REA Biogas Group the voice of the UK Biogas industry since 2004.

Slides:



Advertisements
Similar presentations
Biomethane connections – current developments Biomaster Network Meeting Norwich 11 th November 2011 David Pickering.
Advertisements

Public Private Partnership Investment and Construction Armando R. Araujo Cairo 2003.
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Third Energy Package for Change of Supplier 2009/73/EC.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Roadmaps for Research Infrastructures presentation by Hans Chang (chair ESFRI) (1st meeting ESFRI Steering Groups, autumn 2005)
The Anaerobic Digestion and Biogas Association Gas to Grid Issues.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
A regulatory framework for gas quality treatment facilities: recap and update.
More on Vertical Relationships. The Make or Buy Decision Firms should internalize those activities that can be conducted within the firm more profitably.
Energy Networks Association Flow Weighted Average Calorific Value Options Biomethane Campaign Working Group 7 th August 2014 The Voice of the Networks.
Taking the UK Waste Strategies Forward Mike Walker Environmental Services Association ENVIRONMENTAL SERVICES ASSOCIATION ACHIEVING SUSTAINABILITY.
Palm Coast’s Municipal Fiber-Optic Network: Project Update.
Regional Policy Major projects approval process in Brendan Smyth DG REGIO.
1 Packaging bio- methane connections for the future Dan Anderson CEng 11 th January 2012.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Ofgem Review Group on Energy Market Issues for Biomethane Projects (EMIB) Gas Quality Analysis at Biomethane Entry REA Biogas Group the voice of the UK.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Didcot Biomethane to Grid project Learning Points SGN and CNG Services Ltd (CSL)
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
Quote + SP Energy Networks are keen to improve the service we provide to our Customers. Quote + has been developed to provide our Customers with a higher.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
MHz Update To: FCS Business Radio Date: 22 nd November 2007.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Institute of Chemical Engineering page 1 Achema 2012 Thermal Process Engineering Martin Miltner, Aleksander Makaruk, Ass.Prof. Michael Harasek
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
© Energy UK April 2012 Modification 435 Workgroup Alternative approaches to NDM Compensation 19 February 2013
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Contestability for Distribution Connections 26 th January 2016.
High Level Features of UK-Link Replacement 22nd November 2006.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
Sufficiently Complex Connection Involving Pipeline Construction and/or System Reinforcement Project Sequence.
Industry Dialogue on xoserve Services 14 th September 2007.
Towage Procurement Process – Industry Briefing 05 May 2014.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Work Plan and Key Deliverables 2 November WORK PLAN.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Summary Why Biomethane Support for biomethane What is biomethane
User Pays User Committee 12th November 2013
An alternative approach…..
Code Governance Review UNC Modification Proposals
UK Link Technology Refresh
SO Incentives from April 2010
UNC Modification 0663S Extending the data comprised under the definition of Supply Point Premises Data (TPD V5.18.1) and iUNC Modification 114 Extending.
Modification Proposal 0192 – Draft Business Rules.
Correction of Minor Material Drafting Errors
CSS Update for CoMC 19th September 2018
Joint Office Presentation for Modification 0678
Credit Modification Proposals Update
Summary Issue Modification Aim Effect of the mod Impacts
Gas Customer Forum DN Interruption Update - Introduction
Commercial Arrangements For Gas Quality Service – Introduction
Sustainable Public Procurement
Stakeholder Engagement
CHALLENGES IN MEETING 2020 HCFC PHASE OUT TARGETS
Request for Approval: Introduction of rolling contracts for Third Party Services Dave Harper - 14th August 2019.
Presentation transcript:

Ofgem Review Group on Energy Market Issues for Biomethane Projects (EMIB) Update on Issues REA Biogas Group the voice of the UK Biogas industry since November 2011 John Baldwin Chair, REA Biogas Group

Biomethane Facility Ownership Issues Biomethane Producer FundingOwnershipMaintenanceNetwork Operator Option 1 (UK DN Model) Zero RAV Option 2 (German Model) Service ChargeFunded through RAV Option 3 (Dutch Model) Plant built to Network Operator Specification Set Specification (NEA) Option 4 GT Licence modelConnected system Option 5 Part ownership Odorant facility Part ownership

Ownership of Odorant Plant Producer Owns Should not impede GS(M)R Compliance Work to GDN Specification Avoid plant duplication downstream GDN Owns Some technical issues GDN accepts available signal from upstream Producer plant Avoid plant duplication downstream Need Standards of Service … Biomethane Facility Odorant Plant

Biomethane Facility Standards of Service Issues Standards of Service needed for efficient operation (Options 4 & 5) Non-contestable Works Standards Initial inquiry stage Network Capacity Enquiry Standard Free indication (facilitate rapid go/no go decisions) Provision of Chargeable Capacity Enquiry (facilitate operator certainty) Pre construction phase Construction Standards (Valve/Telemetry etc.) Chargeable Feasibility Study Response Time Charging Quotation Accuracy Construction Phase Commencement of Works Date Substantial Completion Date Notification of Contract Variation Note: If odorant is included this also part of non contestable works

Biomethane Facility Standards of Service Issues Standards of Service needed for efficient operation (Options 4 & 5) Cont. Contestable Works Standards GDN Provision of Requirements Specification GDN Evaluation of Producer Design Turnaround time Chargeable? Standard Charges or Bespoke Producer builds to accepted specification then assume no further acceptance process Note: Ideally BtG plant suppliers would pay for this so that their plant is 'approved' technically for use