Copyright © 2015 NSF Net-Centric I/UCRC. All Rights Reserved. Rev 2 Net-Centric Cloud Software and Systems I/UCRC Net-Centric Cloud Software and Systems.

Slides:



Advertisements
Similar presentations
Copyright The Info-Tech Research Group Inc. All Rights Reserved. D1-1 by James M. Dutcher Strategic IT Planning & Governance Creation H I G H.
Advertisements

Project Title (as descriptive as possible) Group Members CPE Computer Engineering Design I Electrical and Computer Engineering.
Thursday, January 14 th 2010 Title of Project John Q. Public, Ph.D. Department of Biomedical Engineering Jane S. Day, M.D. General Hospital FYxx_Pzzz Please.
Net-Centric Software and Systems I/UCRC Copyright © 2011 NSF Net-Centric I/UCRC. All Rights Reserved. High-Confidence SLA Assurance for Cloud Computing.
MARE 105 MOP Proposal Lecture. A proposal is a plan for a project. In science and industry, it generally is written in such a way as to convince an employer.
6/19/2015Sample Presentation1 CS Software Testing Fall 2009 Project Title Team Name List names of all members of your team.
Chapter 3 Finding, Reading, & Using Research. Reading & Using Research Reviewing previous research Informs us of previous results Allows us to benefit.
CAREER WORKSHOP APRIL 9, 2014 Required Elements of the Proposal Beth Hodges Director, Office of Proposal Development FLORIDA STATE UNIVERSITY.
Project Title (as descriptive as possible) Group Members CPE Computer Engineering Design I Electrical and Computer Engineering.
Exit Interview Assessment Slide 1 I/UCRC June 2007 Industry/University Cooperative Research Centers Exit Interview Assessment Exit Interviews: Opportunity.
Feasibility Analysis Presented by: Julie Messing Kent State University
Chapter 5 Conducting a Feasibility Analysis. Copyright © Houghton Mifflin Company. All rights reserved.5 | 2 Learning Objectives Prepare to conduct a.
An NSF Industry/University Cooperative Research Center Presentation at the Innovation Summit Wayne M. Zage, Director August 6, 2013 copyright 2013 by the.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 6/25/2015 V2.
PROPOSED PROJECT TITLE Company, Principal Investigator, Phone, Contract Cost Short term goals: what will be accomplished or delivered in this contract.
Summary Report Project Name : Advancing an Open Source Service Oriented Architecture (SOA) Ecosystem Brief Project Description : This Charter project aims.
Project Title (as descriptive as possible) Group Members CPE495 Group ??? Computer Engineering Design I Electrical and Computer Engineering The University.
00-00 – Title of Project Graduate Student: Principal Investigators: Industrial Advisors:Person, Company; Person, Company; Person, Company; Person, Company.
Lockheed Martin Aeronautics Company Candidate Collaborative Projects for Net-Centric Application Michael F. Siok, PE Lockheed Martin Aeronautics Company.
ENTER THE TITLE OF YOUR PROJECT HERE INNOVATION DISCOVERY EVENT Insert Date Names of Innovator(s): XXX Place your laboratory’s logo/logos here Department.
SMART COMPUTING R&D CHALLENGE PROGRAM OVERVIEW June 24, 2015.
NATIONAL INSTITUTES OF HEALTH CHALLENGE GRANT APPLICATIONS Dan Hoyt Survey, Statistics, and Psychometrics(SSP) Core Facility March 11, 2009.
Net-Centric Software and Systems I/UCRC A Framework for QoS and Power Management for Mobile Devices in Service Clouds Project Lead: I-Ling Yen, Farokh.
TRANSFORMING U.S. INVENTION INTO INNOVATION Bridging the Commercialization Gap at U.S. Universities and Federal Research Institutions Presentation to Boston.
CAREER WORKSHOP APRIL 6, 2015 Required Elements of the NSF Proposal Beth Hodges Director, Office of Proposal Development FLORIDA STATE UNIVERSITY.
GENESIS OF I/UCRC EVALUATORS Process began at the NSF with Alex Schwarzkopf in the early 1980’s Process began at the NSF with Alex Schwarzkopf in the early.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 16/25/2015 V2.
Investment Attractiveness Index with the support of the InMind research company EBA Investment Attractiveness Index (7th wave) Conducted by EBA with the.
NWI Confidential & Privileged Information – Title of Project Graduate Student: Principal Investigators: Industrial Advisors:Person, Company; Person,
Name of School Name of Class Grade Level Inclusive Dates.
1 ARENA Workshop Renewables for Industrial Processes.
Atlantic Innovation Fund Round VIII February 5, 2008.
MARE 103 MOP Proposal Lecture.
1 Managing New Product Introduction: Life Cycle Phases Team Members: Jhon Benavides Sabrina Patino Russ Watt June 5, 2009 Solar Plus.
Title of your Study Your Name Date of your defense.
PMC xx/xxxx Project Title & Project Code Presenter:
Copyright © 2015 NSF Net-Centric I/UCRC. All Rights Reserved. Rev 4 Net-Centric and Cloud Software and Systems I/UCRC Net-Centric and Cloud Software and.
VENTURE PLAN EXECUTIVE SUMMARY. should be only one to two pages in length, designed to capture the reader’s interest.
Copyright © AEA — Association of Enterprise Architects 2013 AEA Workgroup Charter Proposal Version of 1 August 2013.
Industry/University Cooperative Research Centers IUCRC Leveraging of Other NSF Support IUCRC Evaluator’s Meeting June 2012 Lindsey McGowen & Denis Gray.
Slide presentation title to go here Secondary information to go here Date to go here.
Copyright © 2015 NSF Net-Centric I/UCRC. All Rights Reserved. Rev 2 Net-Centric Cloud Software and Systems I/UCRC Net-Centric Cloud Software and Systems.
Net-Centric Software and Systems I/UCRC A Framework for QoS and Power Management for Mobile Devices in Service Clouds Project Lead: I-Ling Yen, Farokh.
Self-Configuring Wireless MEMS Network N-CSSC Net-Centric Software & Systems Consortium Planning Meeting February , 2008 Robert Akl UNT
Source: Article reprinted from 2014 Cloud Survey Report, Copyright: KPMG LLP © 2015, a Delaware limited liability partnership and the U.S. member.
CIS611 – Cloud Security Case Study. CIS611- Case Study Has 685 benefited employees. Has 150 adjunct professors under contract, number changes each session.
Title of Full Proposal Name of Corresponding PI, Institution
Project Lead: Joe Engineer, UNT Date: October 2015
Microsoft Cloud Adoption Framework Workshop
Contracting Officer Podcast Slides
Grant Writing Information Session
Title of Full Proposal Name of Corresponding PI, Institution
Name of Small Business location
00-00 – Title of Project Graduate Student: Principal Investigators:
Replace this Text with Center Name
NEW PROJECT REQUEST Project: {Name} 27 March 2017.
CS 490M Software Testing fall 2006 Project Title
Author(s), Department, Name of University, Country
BUFFALO FUND: ACCELERATOR Full Proposal Presentation
Employee engagement Delivery guide
PRESENTATION TITLE Faculty Enhancement and Instructional Development (FEID) Proposal Support Sharon Seidman, Ph.D. (HHD) and Erica Bowers, Ed.D. (Director,
University Template Sample Slides June 2017.
00-00 – Title of Project Graduate Student: Principal Investigators:
NEED: What need does your project address?
Team Name Names of team members
Slide presentation title Secondary information
Slide presentation title Secondary information
Title of Full Proposal Name of Corresponding PI, Institution
Title of Full Proposal Name of Corresponding PI, Institution
PRESENTATION TITLE SUBTITLE Presenter Name Date.
Presentation transcript:

Copyright © 2015 NSF Net-Centric I/UCRC. All Rights Reserved. Rev 2 Net-Centric Cloud Software and Systems I/UCRC Net-Centric Cloud Software and Systems I/UCRC Title of Continuing Project Project Lead: Joe Engineer, UNT Date: October 2015

Problem Statement ›Why is this research needed? –Text-1 –Text-2 –Text-n ›What is the specific problem to be solved? –Text-1 –Text-2 –Text-n 2

Project Description ›How will this project approach the problem? –Text-1 –Text-2 –Text-n ›Preliminary results from this or previous projects: –Text-1 –Text-2 –Text-n 3

Project Pictorial 4 EXAMPLE

Connection to NCSS Competencies/Capabilities 5  =Primary,  =Secondary,  =Tertiary   

Statement of Work Work to be performed, timeline, and budget for 5 most significant tasks. 6 TaskK$Start DateEnd DateDescription 15.0Oct 2014Jan 2015Conduct literature survey to determine state of practice and gaps in existing research approaches

Deliverables Summary of 3 most significant deliverables expected at end of Year 1. 7 DeliverableDescription 1Text-1 2Text-2 3Text-3

Project Differentiators ›What results does this project seek that are different (better) than others? –Text-1 –Text-2 –Text-n ›What specific innovations or insights are sought by this research that distinguish it from related work? –Text-1 –Text-2 –Text-n 8

Potential Member Company Benefits ›What specific benefits are sought for the industry members? –Text-1 –Text-2 –Text-n ›What leverage does the research provide to industry member R&D plans? –Text-1 –Text-2 –Text-n 9

Sponsorship and Collaboration ›Efforts to involve multiple companies in project sponsorship: –Text-1 –Text-2 –Text-n ›Efforts to involve multiple university collaborators in the project: –Text-1 –Text-2 –Text-n 10

Project Quality Attributes PI’s assessment of extent to which project demonstrates each QA. QARatingComments Alignment w/Competencies Sponsor-acknowledged Leverage for R&D Multi-company Sponsorship Multi-PI Collaboration Compliance with NSF Operations Requirements Objective Deliverables Innovation & Technology Evolution Potential for Derivative Services Commercialization Opportunities Past Performance 11 Scale:5=To a LARGE extent, 4=To a MODERATE extent, 3=To SOME extent, 2=To LITTLE extent, 1=Not at All, 0=Unrated

Significant Accomplishments in Previous Project ›TBD –Text-1 –Text-2 –Text- … 12

Significant Accomplishments in Previous Project ›TBD –Text-1 –Text-2 –Text- … 13 Use this additional slide for accomplishments if needed (otherwise delete).