1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.

Slides:



Advertisements
Similar presentations

Advertisements

The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
A Drift Chamber System for muon tomography Jo Pater and Roger Barlow Applied Nucleonics Forum Teesidel March 1 st
5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
The Large Hadron Collider at CERN: Entering a new era in unravelling the mystery of matter, space and time Tsinghua, Beijing April 2009 Felicitas Pauss.
1 TPC online  offline calibration November 2002.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Status of the CSC Track-Finder Darin Acosta University of Florida.
ICARUS General Trigger Design Contributions from: M.Della Pietra, A.Di Cicco, P.Di Meo, G.Fiorillo, P.Parascandolo, R.Santorelli, P.Trattino B.Baboussinov,
H. Matis, M. Placidi, A. Ratti, W. Turner [+ several students including S. Hedges] (LBNL) E. Bravin (CERN), R. Miyamoto (BNL – now at ESSS) H. Matis -
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
1 SCA Cell Utilizing Scheme The output of each preamp-shaper channel is sampled continuously at 20 MHz and stored the SCA cells. There are 96 cells for.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson,
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Results with the RPC system of OPERA and perspectives
UCLA Meeting: Notes TMB upgrade for ME1/1 issues
Overview: Introduction to LHC Overview of CMS
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
The Ohio State University
The First-Level Trigger of ATLAS
CSC Trigger Primitives Test Beam Studies
University of California Los Angeles
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
The LHCb Front-end Electronics System Status and Future Development
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Global Trigger Finds Correct BX
Plans for the 2004 CSC Beam Test
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
B904 Status Report by Fred B.
Presentation transcript:

1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University

2J. Gu CERN CSC Meeting July 2008 Electronics - First Beam Overview This is a Machine Run (for them and us) First Priority is to “Time In” the Electronics Beam Will Advance in Stages: Halo Muons, Low Luminosity Collisions,… Thus timing will advance in stages… Tools: Greg’s Radioactive Triggers(done now) special runs single chambers requires rate Shift timing all chambers take data requires data analysis no special software written Cosmic Ray – Crude Timing random arrival (anytime) random direction (speed of light) Colliding Beams-Precise Timing precise arrival (3 nsec) fixed time of flight Data and Time will be taken for Solely Hardware Purposes

3J. Gu CERN CSC Meeting July 2008 Electronics - First Beam Overview Improved timing should lead to: DAQ Board Readout Efficiency 100% Reduction of Board Readout Errors Beam gives better understanding of timing and synchronization: Test Beam 2003 –time structured beam Time (bunch crossings) Cathode Pulse Peak Time (avg 6 planes) Time (nsec) LHC Beam Structure (initial separation 75 nsec)  ~5nsec dominated by electron drift Cathode Pulse Peak Time (avg 6 planes)

4J. Gu CERN CSC Meeting July 2008 Electronics – Expected Status Live Electronics First Beam by next week all pc crate electronics done bad CFEBs,ALCTs connector, cables … Expect no access to chamber electronics before first beam On Chamber Problems: 12 CFEBs (kill 1/5 chamber each) 9 ALCTs (kill full chamber each) Enter run with 97% Chamber Live