PRESENT CONDITIONS. FREQUENCY DURATION CURVE 2002-03, 2003-04, 2004-05 & 2005-06 <49.0 49.0 & <50.5 50.5 & Above MaxMinAvgFVI 2005-062.1296.811.0751.0248.4249.851.54.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry Prof. Osama El Masry Load Curves.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
Announcements Be reading Chapter 6. HW 3 is due now.
NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
PRODUCTS TRANSFORMERS ENERGY SAVING TRANSFORMERS (EST) TRANSFORMER RECTIFIER UNITS 3 rd HARMONIC REJECTION TRANSFORMERS (HRT) ULTRA HIGH ISOLATION TRANSFORMERS.
© ABB Group August 7, 2015 | Slide 1 Variable Shunt Reactors Optimize Transmission Systems Dr. Claes Bengtsson, Global Product Manager, Reactors. PowerGen.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
Importance of advanced simulations of electrical system in wind turbines April 2010.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
By A.D.Thirumoorthy Tamil Nadu Electricity Board India.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
POWER GRID CORPORATION OF INDIA LTD
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
Grid Connection Issues Micro Hydro Projects Rachel Hodges.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
PRESENTATION ON REACTIVE POWER CONTROL S.K.SOONEEGM,SRLDCBANGALORE.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Optimal Power Flow- Basic Requirements For Real Life.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Responsive Reserve Service Deliverability Review September 15,
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
BELIZE ELECTRICITY LIMITED Electric System Presentation January 8, 2014 Rolando Santos Senior Manager, System Planning and Engineering & Kevin Longsworth.
- 1 - Presentation reference Demand Side Bidding - an IEA Development Project for Competitive Electricity Markets Presentation to Metering Europe 2002.
1 CLASS technical Andrew Howard. 2 Back to school for a moment… This fundamental relationship is at the heart of CLASS But how will it change over time.
Nilam Cyclone – Southern Region Grid operation. Nilam Cyclone Forecast.
Study of Line-used Magnetically Controlled Reactor(MCR) Zhanfeng Deng China Electrical Power Research Institute.
UI SUMMARY BOTTLENECKS IN SR GRID RECENT GRID DISTURBANCES MERIT ORDER OCC PRESENTATION FGMO KAR DISTURBANCE REDUCING THE LOSSES IN GRID BUYING AND SELLING.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
Hon’ble Commission has issued Interim order dated 19/ directing :
The Genie is Not Back in the Bottle
ABT & Frequency.
DEC System Voltage Planning - June 2018
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
CORPUS CHRISTI CATHOLIC COLLEGE – GEOGRAPHY DEPARTMENT
HOW TO DRAW CLIMATE GRAPHS
Presentation transcript:

PRESENT CONDITIONS

FREQUENCY DURATION CURVE , , & < & < & Above MaxMinAvgFVI

FREQUENCY SPECTRUM OF SOUTHERN REGION FOR PAST SIX YEARS

VOLTAGE PROFILE OF SOUTHERN REGION FOR PAST SIX YEARS

ISSUE: In general it can be seen that SR grid is shifting from low frequency/ low voltage to high frequency/high voltage regime.

HIGH VOLTAGE CONDITIONS IN SOUTHERN REGIONAL GRID

VARIATION OF MAXIMUM VOLTAGES IN SR GRID DURING NOV 2005

Issues Of Concern – High Voltage Frequent switching in/out of Lines –Resulting wear and tear of equipments Continuous High Voltage –Resulting damage to the equipments Network Redundancy is lost with opening of EHV lines –causing Security concerns Opening of EHV lines causes increase in system losses –Commercial losses

Actions Taken TAKING OUT THE LINE AND CONVERTING LINE REACTOR TO BUS REACTOR MVAR ABSORPTION BY GENERATING UNITS TRANSFORMER TAP CHANGES MANY ICT TAPS WERE CHANGED ON 400/220 ICT’s GT TAP CHANGES OPENING UP OF LIGHTLY LOADED REDUNDANT TIE LINES UTILISATION OF HYBRID AC/DC NETWORK DIVERSION OF TALCHER STAGE 2 POWER THROUGH GAJUWAKA

Desired Actions ABSORPTION OF VARS BY ALL THE OPERATING UNITS WITHIN THEIR CAPABILITY CURVES OPENING OF 220 KV AND BELOW LEVEL LIGHTLY LOADED LINES IN SATES GENERATORS ON SYNCH CONDENSOR MODE TO CARRY OUT DETAILED STUDIES TO FIND OUT REQUIREMENT OF ADDITIONAL REACTORS AT SUITABLE LOCATIONS

HIGH FREQUENCY CONDITIONS IN SOUTHERN REGIONAL GRID

FREQUENCY PROFILE DURING THE MONTHS SEPTEMBER, OCTOBER, NOVEMBER 2005 Cont..

Issues Of Concern – High Frequency Wastage of Resources Grid Insecurity High Frequency also Causes High Voltage Damage to the Equipments Cont..

ACTIONS TAKEN TO ARREST HIGH FREQUENCY: Reservoir based hydro backing/closing Liquid Fuel Stations backing/closing down Inter Regional Export under UI Thermal Stations backing/Closing down Exports under Short Term Open Access (STOA ) Cont..

TARIFF RELATED SOLUTION: RATIONALISATION OF UI PRICE CURVE SLOPES

IN SR 16000MW OF THERMALS OUT OF MW (87%) HAS VARIABLE COST THAT FALLS IN THE RANGE OF 60PAISE TO 300 PAISE

THIS UI CURVE WAS IN EFFECT FROM 01JAN 03 TO 31 MAR 04 THIS UI CURVE WAS IN EFFECT FROM 01 APR 04 TO 30 SEP 04

UNITS WITH A VARIBLE COST OF 90 PAISE WOULD NOT REDUCE TILL FREQUENCY RISES ABOVE 50.2 HZ UNITS WITH A VARIBLE COST OF 90 PAISE WOULD NOW HAVE TO REDUCE AT 50.00HZ ITSELF UI_PRICE Vs FREQUENCY:- THE EFFECT OF PRICE VECTOR ON GENERATION FREQUENCY IN HZ UI PRICE IN PAISA/UNIT IN SR 16000MW OF THERMALS OUT OF MW (87%) HAS VARIABLE COST THAT FALLS IN THE RANGE OF 60PAISE TO 300 paise UI CURVE IN FORCE SINCE 01 OCT 04 SHOW TABLE HIDE TABLE HIDE GRAPH SHOW GRAPH KNEE POINT CHANGED FROM 49.8 TO 50 HZ SLOPE OF HIGH FREQUENCY BAND CHANGED FROM 30ps/0.1 HZ TO 18ps/0.1 HZ SHOW CHANGES

Furthur Rationlisation of UI curve can address low frequency problem also.