11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
28 February 2003Paul Dauncey - HCAL Readout1 HCAL Readout and DAQ using the ECAL Readout Boards Paul Dauncey Imperial College London, UK.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
2 July 2003Paul Dauncey - DAQ1 Progress on CALICE DAQ Paul Dauncey Imperial College London, UK.
30 th June 2004Daniel Bowerman1 Dan Bowerman Imperial College LCUK Meeting - Lancaster 30 th June 2004 Calice Status For the CALICE-UK groups: Birmingham,
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group: A. Baird, D. Bowerman,
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
10 th November 2004Daniel Bowerman1 Dan Bowerman Imperial College Calice Meeting - UCL 10 th November 2004 Electronics Status For the Imperial, Manchester,
2 April 2003Paul Dauncey - CALICE DAQ1 First Ideas For CALICE Beam Test DAQ Paul Dauncey Imperial College London, UK for IC, Manchester, RAL, UCL.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
18 Jan 2006DAQ - Paul Dauncey1 DAQ/Online: readiness for DESY and CERN beam tests Paul Dauncey Imperial College London.
11 October 2002Matthew Warren - Trigger Board CDR1 Trigger Board CDR Matthew Warren University College London 11 October 2002.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
25 Feb 2005Paul Dauncey1 TB Review: DAQ Paul Dauncey Imperial College London For Imperial, RAL, UCL.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
26 September 2003Paul Dauncey - DAQ1 System-wide triggering and DAQ issues Paul Dauncey Imperial College London, UK.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 2 Paul Dauncey Imperial College London.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Custom mechanical sensor support (left and below) allows up to six sensors to be stacked at precise positions relative to each other in beam The e+e- international.
4 November 2002Paul Dauncey - Electronics1 UK Electronics Status Paul Dauncey Imperial College London.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Notes on visit to Rome 28/04/2014 Christian Joram Szymon Kulis Samir Arfaoui.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
CALICE(-UK) Status Paul Dauncey 28 Apr 2004 Paul Dauncey.
CMS EMU TRIGGER ELECTRONICS
Power pulsing of AFTER in magnetic field
CDR Project Summary and Issues
Electronics for the E-CAL physics prototype
LHCb calorimeter main features
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
UK ECAL Hardware Status
BESIII EMC electronics
Trigger issues for the CALICE beam test
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London

11 October 2002Paul Dauncey - CDR Introduction2 Electromagnetic (ECAL) and hadronic (HCAL) calorimeters Final aim is for a linear collider after 2010 Test prototypes in beam starting in mid 2004 Several tests, running (not continuously) for around 1 year in total UK proposal to build ECAL back-end readout electronics Front-end electronics supplied by Orsay/Paris group No proposals for HCAL back-end yet Front-end not very firm but some effort there Adapt ECAL readout electronics for HCAL back-end? No proposals for trigger, beam monitoring, etc, either Need to be flexible to accommodate uncertainties here Main aim of CALICE is a beam test

11 October 2002Paul Dauncey - CDR Introduction3 1  1cm 2 silicon diode pads, each diode is a channel 18  18 diodes = 324 channels/layer 30 layers = 9720 channels Front-end electronics is VFE chips on VFE-PCB’s 6 chips/PCB, 18 channels/chip and 108 channels/PCB VFE chip is charge integrating amplifier with CR-RC shaper Requires 14 bits dynamic range, 10 bits resolution The 18 channels/VFE chip are multiplexed onto one output line as analogue voltages Readout needs to digitise signal at peak = 180ns VFE has calibration circuit to inject charge at input stage ECAL system

11 October 2002Paul Dauncey - CDR Introduction4 Interface is at VFE-PCB connector Time dependent signals through connector shown below Sample-and-hold timing critical, needed to ~10ns All others less severe, needed to ~100ns VFE-PCB interface

11 October 2002Paul Dauncey - CDR Introduction5 Trigger using scintillators in beam Trigger logic not completely trivial Need to hold off further triggers until each event read out Need to be able to veto trigger if too close (~1  s) to last activity Need to be able to abort trigger if activity soon (~100ns) after trigger Need to know if beam present or not Need several types of trigger (beam, cosmic, calibration, pedestal, etc.) selectable from DAQ Also (potentially) need trigger fan-out to HCAL readout with adjustable delay No proposal for a CALICE group to build this (yet) Have to retain large degree of flexibility given uncertainties here Some/all of logic could be built into readout/DAQ system Trigger interface

11 October 2002Paul Dauncey - CDR Introduction6 Need to read all channels for every event Could do threshold suppression in principle Need to see pedestals and noise at least in some subsample Allow for inclusion of HCAL, trigger and beam monitor Event numbers required Need around 200 set-ups (particle types, energies, HCAL options, entrance angles, etc.) Need ~3  10 5 events for each set-up Total sample ~6  10 7 events Rates required to take these events in a reasonable time Need around 100 Hz sustained rate Given beam structure, this requires around 1kHz peak rate Data sizes: event will be around 25 kBytes Total data size around 1.5 TBytes Data acquisition interface

11 October 2002Paul Dauncey - CDR Introduction7 Cables from VFE-PCB’s direct to 15 VME readout boards External trigger to 1 VME trigger board, then distributed via customised backplane Also need a test board for debugging readout cards Proposed system

11 October 2002Paul Dauncey - CDR Introduction8 There are (at least) three HCAL options Analogue readout: scintillating tiles, ~1500 channels Digital readout: RPC’s or GEM’s, ~350k channels Analogue option may use VFE chip (on different PCB) Simple (in principle) to use same readout electronics Not clear if all 18 channels/VFE chip used in this option Minimum of 3 extra readout boards needed, maybe more Digital options will share front-end readout 38 layers, each with zero suppression at front-end Expected total event size around 2kBytes No proposal for back-end electronics; also use ECAL readout? Basically need an LVDS I/O data path Minimum of 7 extra readout boards needed, maybe more Need to allow for multiple crates and at least two trigger boards HCAL implications

11 October 2002Paul Dauncey - CDR Introduction9 VME crate specifics Customise crate for trigger and addressing Use some of 64 spare pins on J2 Four LVDS signals bussed on backplane System clock (~12.5MHz) Trigger Two spares Geographical slot addressing Six TTL pins with unique value for each slot Six bits are needed to cover two crates = 42 slots Power supplies: need 3.3V rather than 5V For LVDS I/O signals FPGA’s run at 1.8V or 2.5V, stepped down from 3.3V May be issue with non-UK readout (beam monitoring, etc)?

11 October 2002Paul Dauncey - CDR Introduction10 Summary External interfaces are still in flux VFE-PCB reasonably firm Trigger and HCAL very uncertain Basic system concept laid out here Will have to react to changes in interfaces Hopefully no major architectural changes needed Following talks lay out proposed system in more detail Readout and trigger board internals Final talk will discuss cost, effort, schedule