Central Valley Flood Protection Board Meeting – Agenda Item No. 7C.

Slides:



Advertisements
Similar presentations
Introduction. What is ISO14001? A documented system of all impacts a company are having on the environment. A detailed strategy to reduce these impacts.
Advertisements

Metropolitan Council Environmental Services A Clean Water Agency Info Item: Waste Discharge Rules Presented to the Environment Committee September 14,
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
NEPA Environmental Procedure Pam Truitt, Grants Management Consultant  September 4, 2014.
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
Environmental Impact Statement Process Development Services Department Carol Helland, Land Use Director/SEPA Official (DSD) David Pyle, Senior Land Use.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Central Valley Flood Protection Board Meeting – Item 6.
Central Valley Flood Protection Board Meeting – Agenda Item No. 8B Central Valley Flood Protection Board.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Central Valley Flood Protection Board Meeting – September 27,
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Central Valley Flood Protection Board Meeting – Agenda Item No. 13B.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Webinar: Central Valley Flood System Conservation Framework and Strategy Draft Proposal Solicitation Package (PSP) FloodSAFE Environmental Stewardship.
1 State Water Resources Control Board Environmental Review for State Bond Funded Grant Projects Presented by Lisa Lee, Environmental Review Unit.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS and
Sector Planning Process Alachua County Commission July 8 th,
Central Valley Flood Protection Board Meeting – Agenda Item No. 11 DESIGNATED FLOODWAY MODIFICATION.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Like a Home Mortgage Refinancing:. Issued to construct HS 2004 Bonds (mature 2013 – 2029) 4.8% average interest rate Call Date Bonds.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
US Army Corps of Engineers BUILDING STRONG ® JOINT FEDERAL PROJECT UPDATE for SAFCA Board US Army Corps of Engineers Pam Amie 19 May 2011.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Assembly Bill Local Agency Annual Summary Report Flood Project Integrity & Inspection Branch Division of Flood Management Hydrology and Flood.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
11 Cap-and-Trade Auction Proceeds Funding Guidelines for Agencies that Administer California Climate Investments September
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Melinda Terry, Executive Director CA Central Valley Flood Control Association 1.
Department of Port Control Center for Regional Economic Initiatives February Doan Brook Stream Restoration Project Center for Regional Economic.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
1 Findings and Board Resolution Steven Blum. 2 CEQA Findings in the Board Resolution  Resolution or separate appended document contains findings critical.
Leona Heights Sulfur Mine & Creek Cleanup
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
CEQA and the Delta Plan Presentation to Delta Stewardship Council February 24, 2011.
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Project Information Meeting / Open House Wednesday, September 17, :00 – 8:00 PM Agenda 6:00 to 6:30 View Project Displays 6:30 – Presentation and.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
International Levee Handbook Overview of the handbook Chapter 10 Construction.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
June 24, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council.
Joint Public Hearing - Closed Redevelopment Agency & City Council Amended and Restated Redevelopment Plan for the North Stockton Redevelopment Project.
2007 Public Health Goals Report Public Hearing July 17, 2007 Agenda Item 9.01.
BUDGET PROCESS & REVENUE & EXPENSE INFORMATION For FISCAL YEAR 2011.
May 14, Planning Commission Planning Commission May 14, 2015.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Project Status & Right-of-Way Acquisition
Continuing Authorities Program
Lecture 15 Environmental auditing
Butte County Board of Supervisors September 27, 2016
2013 Preconstruction Managers Meeting
I Street Bridge Replacement Project
Sacramento Environmental Commission January 2019.
K Street, Sacramento – 1861/1862 Flood
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Central Valley Flood Protection Board Meeting – Agenda Item No. 7C

Consider approval of Resolution No to:  Certify the Supplemental Environmental Impact Statement & Environmental Impact Report  Adopt the Findings  Adopt the Mitigation Monitoring Plan  Approve project design refinements  Delegate authority to Executive Officer to execute Notice of Determination 2

Central Valley Flood Protection Board Meeting – Agenda Item No. 7C 3 Folsom Dam & Reservoir:  Within the city of Folsom  20 miles northeast of the city of Sacramento

Central Valley Flood Protection Board Meeting – Agenda Item No. 7C 4

 The Joint Federal Project was authorized congressionally by the Water Resources Development Act of 1999 (JFP) and by State Water Code Section  The Final Folsom Dam Safety and Flood Damage Reduction Environmental Impact Statement/ Environmental Impact Report (FEIS/EIR) was approved and certified by the Board in July 2007 (Reclamation/CVFPB 2007) 5

Central Valley Flood Protection Board Meeting – Agenda Item No. 7C  This Supplemental Environmental Impact Statement/ Environmental Impact Report SEIS/EIR (State Clearing House No ) was circulated for 45-day public and agency review from July 25 to September 10, 2012  During public review:  SEIS/EIR was posted on the Board and USACE websites  Agency and Public comments were solicited  Two public workshops were held on August 23, 2012  Responses and comments received and incorporated into this Final SEIS/EIR 6

Central Valley Flood Protection Board Meeting – Agenda Item No. 7C Refinements to project design and operations have necessitated further environmental analysis and documentation. These refinements consist of:  Temporary Cutoff Wall or Cofferdam  Haul Road Embankment  Approach Channel Excavation  Approach Channel Concrete Slab and Walls  Hydraulic Spur Dike Construction  Material Stockpiling and Disposal  Temporary Trans-load Facility  Temporary Staging Areas  Temporary Concrete Batch Plant  Temporary Rock Crusher 7

Central Valley Flood Protection Board Meeting – Agenda Item No. 7C 8

Approving Resolution No  Certifying the Supplemental Environmental Impact Statement & Environmental Impact Report  Adopting the Findings  Adopting the Mitigation Monitoring Plan  Approving project design refinements  Delegating authority to Executive Officer to execute Notice of Determination 9

Central Valley Flood Protection Board Meeting – Agenda Item No. 7C 10

Central Valley Flood Protection Board Meeting – Agenda Item No. 7C 11