PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY). CARMAN RD. TO TR 111 (1350 E) – (8.1 MILES) Construction Plan Preparation – Funded (Strand Assoc.) Plan.

Slides:



Advertisements
Similar presentations
I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Great Western Corridor Feasibility Study
Managing Utilities The Katy Freeway Reconstruction Program
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Corridor #5 Update United States Senate Briefing September 26, 2007.
Environmental Assessment Public Meeting
1 HACIA NETWORKING EVENT Jose Rios, P.E.
Welcome to Pinal County. Greg Stanley Pinal County Public Works AACE Regional Conference Oct 1-3, 2008 The Three C’s of Hunt Highway.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
Longmeadow Parkway Fox River Bridge Corridor
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Public Involvement Meeting June 11,  Introduce the project  Provide history and current status of the project  Explain the benefits of the project.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
The Roads Ahead Leroy D. Alloway, Director Community Development.
CR 470 Site Development Update. Agenda Agenda  Site certification  Look back  Certification requirements  Current status, what’s ahead  CR 470 Widening.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
Montana University System 2009 Biennium Present Law Budget Projections Board of Regents November 16, 2005.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Local Agency Programs An Overview Gonzalo Puente, PE Shaun Bates, PE Development Engineer Project Manager.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Tracy Lovell, PE HSIP PROJECT PROCESS. HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
GRANT AMENDMENTS Processes and Procedures Robert Compton- Field Services Representative  9/10/2015.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
STA US-30 Presentation for TRAC – October 13, 2015
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
What does a Civil Engineer do?
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
RUSHMORE CONNECTOR TRAIL WELCOME Rushmore Connector Trail Environmental Impact Statement Scoping Meeting June 14, Hill City June 16, Rapid.
All information presented is preliminary and subject to revision I-515 Alternatives Development Study Public Information Meeting March 31, 2016 Welcome.
Southwest Parkway and Chisholm Trail Briefings
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
DATA Transportation 101 Project Status March 20, 2002
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Adoption of the FY Capital Improvement Program Budget
I-295/Malcolm X Avenue Interchange Improvement Project
Repair roof rafters / joists, soffit and fascia boards in this area.
Walker Street Reconstruction Project 25% Design Public Hearing
Monterey County Project Report for Measure X Expenditures
Chicago to Council Bluffs-Omaha
WI Natural Resources Board June 2017 Webcast
Presentation transcript:

PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY)

CARMAN RD. TO TR 111 (1350 E) – (8.1 MILES) Construction Plan Preparation – Funded (Strand Assoc.) Plan Preparation has been put on hold due to levee decertification The Phase I study and Environmental Impact Statement (EIS) will be re-opened for this section during 2012 Currently working with FHWA to the define scope of work Cost estimates will be revised as the study progresses

TR 111 TO TR 190 E OF BIGGSVILLE WITH INTERCHANGE (4.7 MILES) Construction Plan Preparation – Funded (Poepping, Stone, Bach & Assoc.) Utility Adjustments – Funded Land Acquisition – Funded Construction Engineering – Funded Construction – Funded Plan Preparation and Land Acquisition are underway Anticipate Late Fall 2012 Letting Funded through the Illinois Jobs Now! Program

TR 190 EAST OF BIGGSVILLE TO S. OF KIRKWOOD (4.5 MILES) Construction Plan Preparation – Funded (Geotech Engineering & Testing) Plan Preparation nearing completion

S. OF KIRKWOOD TO US 67 AT MONMOUTH (6.7 MILES) Construction Plan Preparation – Funded (CMT) Plan Preparation nearing completion