doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4e Closing Report for Mar 2011 Session] Date Submitted: [17 Mar2011] Source: [Patrick Kinney] Company [Kinney Consulting LLC] Address [Chicago area, IL, USA] Voice:[ ], Re: [TG4e Closing Report for Mar 2011 Session.] Abstract:[Closing Report for the TG4e Session in Mar] Purpose:[Amendments to IEEE MAC] Notice:This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P
doc.: Submission, Slide 2 TG4e PAR Scope of Proposed Standard The intention of this amendment is to enhance and add functionality to the MAC to a) better support the industrial markets and b) permit compatibility with modifications being proposed within the Chinese WPAN. Specifically, the MAC enhancements are limited to: TDMA: to provide a) determinism, b) enhanced utilization of bandwidth Channel Hopping: to provide additional robustness in high interfering environments and enhance coexistence with other wireless networks GTS: to increase its flexibility such as a) supporting peer to peer, b) the length of the slot, and c) number of slots CSMA: to improve throughput and reduce energy consumption Security: to add support for additional options such as asymmetrical keys Low latency: to reduce end to end delivery time such as needed for control applications
doc.: Submission, Slide 3 Purpose of Proposed Standard This functionality facilitates Industrial applications (such as addressed by HART 7 and the ISA100 proposed standards), and those enhancements defined by the proposed Chinese WPAN standard that aren't included in TG4c. This amendment addresses coexistence with wireless protocols such as , , , and
doc.: Submission, Slide 4 Meeting Goals Review results from Letter Ballot 69 Review comments from Letter Ballot 69 Categorize comments as per ballot resolution team Resolve LB69 comments Edit draft and Coexistence Assurance document as per comment resolution Motion to WG to go to recirculation
doc.: Submission, Slide 5 TG4e Officers Chair:Patrick Kinney Vice Chair:Seong-Soon Joo Secretary:still no volunteers Technical Editing Ludwig Winkel - Chief Editor Liang Li, Wun-Cheol Jeong, Jonathan Simon, Ben Rolfe
doc.: Submission, Slide 6 TG4e Meetings This Week Mtg MondayTuesdayWednesdayThursday AM1Comment resolution AM2Text Edit: draft & CA document PM1Opening Logistics, LB60 result review Comment resolution Text Edit: draft & CA document PM2Comment categorization Comment resolution Text Edit, Approve resolutions, closing logistics
doc.: Submission MAC Pictorial, Slide 7 nonbeacon-enabled PAN beacon-enabled PAN DSME Time Schedule Channel Hopping (TSCH) Contention Access Contention-Free Low Latency (LL) ISA, HCF ZigBee, Overhead Reduction/Security Low Energy Channel Diversity Blink frames (RFID) RedExisting Users BlueTG4e adds BlackInformational
doc.: Submission LB69 Results LB60LB69Aggregate VOTERS VOTED YES ABSTAIN11212 NO25715 % VOTERS76%33%82% % YES84%90%91% % ABSTAIN7%3%7% 304 Comments were received with 134 marked as part of the commenters' "Do Not Approve" vote, Slide 8
doc.: Submission, Slide 9 Technical Editing Path Forward 1.Draft text in accordance with approved comment resolutions referring to i revision
doc.: Submission TG4e Schedule TG4e Editor completion8 Oct 2010 Letter Ballot Start (30-day)8 Oct 2010 Letter Ballot Close7 Nov 2010 Resolve comments20 Jan 2011 Recirculation (15-day)25 Feb 2011 Resolve comments17 Mar 2011 Recirculation II22 Apr 2011 Resolve comments8 May 2011 Recirculation III (if needed)2 Jul 2011 Sponsor Ballot 9 Sept 2011 Comment resolution & recirc24 Oct 2011 IEEE RevCom approvalMar 2012, Slide 10
doc.: Submission Next Steps Rewrite Coexistence Assurance document Draft text in accordance comment resolution using TG4i as baseline document Recirculate draft, Slide 11
doc.: Submission Draft Preparation Effort Editors: Ludwig Winkel, Jonathan Simon, Wun Cheol Jeong, Liang Li Reviewers: BRC, Slide 12
doc.: Submission Task Group Motion, Slide 13 Move that the e Task Group seek WG approval to start a WG Recirculation Letter Ballot requesting approval to forward document d3P e_Draft_Standard.pdf, edited in accordance with comment spreadsheet P e, to Sponsor Ballot pending the completion and inclusion of the edits in the draft. Moved: Seong-Soon Joo Seconded: Ludwig Winkel Approved by unanimous consent
doc.: Submission Formation of TG4e BRC Seong-Soon Joo Pat Kinney Ludwig Winkel Wei Hong Jeff King Wun-Cheol Jeong, Slide 14 Chang Sub Shin Ben Rolfe Yang Myung Lee Jonathan Simon Kazuyuki Yasukawa TG motion to request that the WG approved the stated membership of the TG4e BRC was approved by unanimous consent
doc.: Submission WG Motion, Slide 15 Move that WG approve the formation of an e Ballot Resolution Committee (BRC) with the following membership: Seong-Soon Joo, Pat Kinney, Ludwig Winkel, Wei Hong, Jeff King, Wun-Cheol Jeong, Chang Sub Shin, Ben Rolfe, Yang Yang, Myung Lee, Jonathan Simon, and Kazuyuki Yasukawa. The e BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the e draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector at least 7 days in advance. Moved: Pat Kinney Seconded:
doc.: Submission WG Motion, Slide 16 Move that The WG start a WG Recirculation Letter Ballot requesting approval to forward document d3P e_Draft_Standard.pdf, edited in accordance with comment spreadsheet P e, to Sponsor Ballot pending the completion and inclusion of the edits in the draft. Moved: Pat Kinney Seconded:
doc.: Submission WG Motion, Slide 17 Move that: The TG4e BRC is authorized to approve the resolutions and to approve the start of recirculation ballots of the 15.4e draft on behalf of the Working Group. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector at least 7 days in advance. Moved: Pat Kinney Seconded:
doc.: Submission Logistics Conference Calls TG4e Call Tuesday 29 March at 6:30 PST, 9:30 EST, 15:30 CET, 23:30 Tokyo Call details are: , participant access code: , Slide 18