FEE Electronics progress PCB layout 18th March 2009.

Slides:



Advertisements
Similar presentations
02/06/2014James Leaver Slink Transition Card. 02/06/2014James Leaver Slink Transition Card Simple 6U board: –Provides interface between FED and Slink.
Advertisements

Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics & Astronomy The University of Edinburgh presented by Tom Davinson.
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
8xADC AMC board Tomasz Klonowski Warsaw University of Technology PERG – ISE
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
Uli Schäfer JEM0 Status (summary) 3 JEM0s up and running: JEM0.0 used for standalone tests only (Mainz) JEM0.1 fully qualified module0 JEM0.2 (like JEM0.1.
2 Lines Electronics I 2 C Analyzer Ching-Yen Beh Robert S. Stookey Advisor: Dr. J. W. Bruce.
31st July 2008AIDA FEE Report1 AIDA Front end electronics Report July 2008 Progress Virtex5 FPGA choice Milestones for prototype delivery.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
Objectives How Microcontroller works
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Cis303a_chapt06_exam.ppt CIS303A: System Architecture Exam - Chapter 6 Name: __________________ Date: _______________ 1. What connects the CPU with other.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
Part A Presentation High Speed Digital Signal Lab Students: Lotem Sharon Yuval Sela Instructor : Ina Rivkin.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
AGATA Pre-processing team report AGATA Week, July 2008.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
12th May 2008AIDA FEE Report1 AIDA Front end electronics Report May 2008 Progress Data compression Plan for prototype delivery.
R&D for First Level Farm Hardware Processors Joachim Gläß Computer Engineering, University of Mannheim Contents –Overview of Processing Architecture –Requirements.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
©F.M. Rietti Embedded Systems I Controllers Data Sheets.
Testing of ABC  Not to scale! 100nF Edge Sensor wired to A9, A10 ? ABC nF NB graphic is not an exact match with “ABC_Pads_V5.2.pdf”
DAQ/Trigger System proposal for the Angra Neutrino Detector Herman Lima Jr (18 May 2006) Centro Brasileiro de Pesquisas Físicas.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
ADC – FIR Filter – DAC KEVIN COOLEY. Overview  Components  Schematic  Hardware Design Considerations  Digital Filters/FPGA Design Tools  Questions.
Agata Week – LNL 14 November 2007 LLP ATCA Carrier Status M. Bellato on behalf of the LLP Carrier Working Group.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 SysCore for N-XYTER Status Report Talk by Dirk Gottschalk Kirchhoff Institut für Physik Universität Heidelberg.
Introduction of Direct Memory Access (DMA). Why is DMA? It is wasteful to feed data into a controller register 1 bytes at a time. (PIO) The DMA unit is.
AIDA FEE64 production report January 2011 Manufacturing Power Supply FEE64 revision A “3 hour test” 19th January
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
Simple ALU How to perform this C language integer operation in the computer C=A+B; ? The arithmetic/logic unit (ALU) of a processor performs integer arithmetic.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
PRM for AM06 Daniel Magalotti Collaboration between: KIT, INFN Pisa and INFN Perugia.
Relay Controller Device. 2 Relay Controller Device (RCD) If additional relays are needed beyond the two that are available on the DCD, then a RCD can.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź, DMCS ATCA LLRF project review, DESY, 3-4.
Development of T3Maps adapter boards
Test Boards Design for LTDB
Production Firmware - status Components TOTFED - status
AM system Status & Racks/crates issues
GTK-TO readout interface status
Task T - CMS at LHC Global Calorimeter Trigger
FEE Electronics progress
TPC Large Prototype Toward 7 Micromegas modules
Assembly order PCB design
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
FEE Electronics progress
FEE Electronics progress
Status of CC-PC Evaluation Board
RPC FEE The discriminator boards TDC boards Cost schedule.
Measurement Notes Part 2: Temperature 9/11/12.
Presentation transcript:

FEE Electronics progress PCB layout 18th March 2009

Layout current 18th March 2009 Memory routing rules :- Data byte lanes and clocks routed to within 0.5mm Address and control bus routed using a tree structure with all branches equal in length Terminate data byte lanes both series and parallel. Terminate address and control bus to balance across all devices. Memory Target 400MHz data transfers 200MHz clocks

Layout to do 18th March 2009 Complete memory Gbit Ethernet. ADC output signals to the FPGA. Discriminator signal connections to the FPGA Mezzanine connector signal definition Clock distribution to the ADCs Power supply blocks and delivery planes. FPGA configuration memory. Temperature sensors, RS232, LEDs etc.

Problems Patrick on leave from April 3 rd to 20 th AGATA week in Cologne March 30 th to April 1 st. Pcb data needed at manufacturers by 9 th March Revised bill of materials (BOM) needed by assembler as soon as possible. Too many interruptions ! 18th March 2009