Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.

Slides:



Advertisements
Similar presentations
Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity.
Advertisements

LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
B. Todd et al. 25 th August 2009 Observations Since v1.
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
1 Will We Ever Get The Green Light For Beam Operation? J. Uythoven & R. Filippini For the Reliability Working Group Sub Working Group of the MPWG.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
1v2 LHC Availability Tracking: Past and Future B. Todd, A. Apollonio, L. Ponce on behalf of the LHC AWG.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
Cryogenics Fault Tree A. Niemi & E. Rogova. Contents 1.Introduction of the current tree structure 2.Failure rates observed in 2015 failure data 3.Unsure.
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
PLCs at CERN for machine protection and access interlocks Session: Machine Protection and interlock systems at different labs I. Romera Ramírez (CERN /
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Registered participants participants from outside Cern.
Data providers Volume & Type of Analysis Kickers
HL-LHC IT STRING and Series test of SC link
2007 IEEE Nuclear Science Symposium (NSS)
R. Denz, A. Gomez Alonso, AT-MEL-PM
Dependability Requirements of the LBDS and their Design Implications
How do we tackle the extended requirements?
Detailed global view on protection and detection of the circuits
TEST PLANS for HL LHC IT STRING
Machine Protection Xu Hongliang.
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Machine Protection System Commissioning plans
Will We Ever Get The Green Light For Beam Operation?
Brief report of the hardware commissioning activities
Configuration of BLETC Module System Parameters Validation
Review of hardware commissioning
Close-out.
Presentation transcript:

Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara Fernandez) Post Mortem Workshop 16-17/01/2007 Post Mortem Workshop Session 2 Superconducting circuits: data and analysis Analysis requirements for the SC magnet systems

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 2/16 Outline  Magnet Performance Panel (MPP) and its role during the LHC hardware commissioning  Tools required for various phases of the magnet system start-up Requirements and challenges of the Global Magnet Post Mortem Analysis System (GMPMA)  Main challenges  GMPMA scope  Architecture of the GMPMA  GMPMA functionality  Operational requirements Minimum requirements and GMPMA evolution  Remarks and conclusion

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 3/16 MPP – Main Ring Magnet Performance Panel  Mandate Monitor, analyze and manage all aspects of magnet performance including cryogenics and vacuum Detect, diagnose, correct or mitigate problems which could occur in the magnets and the superconducting circuits including the electrical distribution feed boxes Record and track individual magnet performance in relation to their manufacturing, tests, commissioning and operation data Steer the development of the related data bases, analysis and diagnostic tools. Participate to the definition of the needs for analysis tools to be used during routine operation.

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 4/16 MPP Responsibility During Hardware Commissioning  The MPP is expected to actively contribute to the Hardware Commissioning effort by: participating to the definition of the procedures, analyzing the data gathered, supplying all the information necessary and timely validating the continuation of the commissioning procedures interpreting the data and depending on it allowing/refusing the execution of the following step of the test procedure In case of failure, the MMP is expected to perform in-depth diagnostics to unblock the situation or escalate the problem via Hardware Commissioning Coordination

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 5/16 MPP Responsibility During Hardware Commissioning  The MPP will integrate AT experts and their expertise to actively contribute to the Hardware Commissioning effort  The MPP will be integrated into the existing Hardware Commissioning structure AB-ATB EQUIPMENT AB-BT EQUIPMENT ….. Magnet protection VAC (Magnets) Magnets AB-PO EQUIPMENT CRYO (Magnets) MPP HCC Crisis Team AB-RF EQUIPMENT AB-BDI EQUIPMENT DFBs …… Main Ring Magnet System

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 6/16 Main Challenges  The LHC Main Ring Magnet System is unprecedented in terms of its complexity, diversity and overall size  Electrical, quench, magnet protection, vacuum and cryogenic aspects need to be integrated  A variety of “active” equipment and instrumentation: QPS - ca channels (analogue, digital), 2200 field bus couplers, 1732 electric circuits CRYO - ca channels (various types: temperature, pressure, He level, etc.) VAC - beam vacuum: 310 sector valves, 900 pressure gauges, 600 ion pumps; insulation vacuum: 720 valves, 850 pressure gauges, 180 turbomolecular pumps …other

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 7/16 GMPMA scope  The GMPMA comprises the main ring magnet system instrumentation and other signals which will come from the logging and Post-Mortem system with checks on and analysis of: Magnets and magnet circuit protection  quench detection waveforms  voltage waveforms Cryogenics  temperature waveforms  Flows, valves opening DFB’s Vacuum PIC system status Power Converters BLM … origin of the triggers and dump request

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 8/16 GMPMA general requirements  Three steps in the analysis process Individual System Analysis (ISA) Logical System Analysis (LSA) Global System Analysis (GSA) IS Data (logging, SDDS) ISA (QPS, PIC, PC, Cryo,,…) LSA (Circuit,Cell, DFB, SCL,…) Spec. Storage Spec. Global System Analysis Display Config. Trigger generator Module ISA Modules LSA Modules GSA Modules

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 9/16 Architecture of the GMPMA system (v4) Circuit Equip Individual system analysis Logical system analysis Global system conclusion Magnet system BLM PC QPS Cryo VAC CircuitEquip SDDS logging Trigger additional results MS Raw data Result data 1 Analysis trigger Result data 2 Global system analysis DFB SCLink Std. cell Equip Cryo circuits PIC Result data 3

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 10/16 GMPMA main functionality (1/2)  The GMPMA system will be a high-level application which will need to: be triggered after every QPS, PC, Cryo, VAC event or on request e.g. during dedicated tests/diagnostics should run in a server with the hardware acquire the LHC configuration data associated with LHC mode, filling, ramping etc. access equipment data (voltage waveforms, temperatures, flows, pressures, BLM signals, etc.) from the Post-Mortem servers, from the logging DB or from the previous measurement DB; provide facilities for display, browsing and data analysis – complex task: requires data preparation by time, by equipment, historical from DB, etc.

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 11/16 GMPMA main functionality (2/2) build a ‘model’ of quench process, in particular for the main magnet circuits, identify the origin the cause etc. test the measured equipment data against the model where applicable, and against references in other cases display a summary of the comparison results and allow a diagnostic of the identified problem give the power permit via a software interlock channel withhold the power permit and generate an alarm if the quench process was not as expected and failed the comparison to reference tests monitor equipment and equipment state change: all states changes to be recorded provide suitable summary data to the LHC logging and Post-Mortem DB where required.

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 12/16 Operational Requirements  Link to LHC sequencer  Triggered automatically by QPS, PC, Cryo or VAC events  As automatic as possible process in the LHC controls environment All known today faults must be captured Detection of onset of equipment hazard and hazard mitigation (alarms or warnings and control within safe operating limits)  Response time within ca. 15 minutes Retrieving archived data and generating hardware status must not have any operational impact, both during the hardware commissioning and operation with beams

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 13/16 Minimum requirements and GMPMA evolution  The GMPMA System Architecture is structured, including modularity and allowing partial use of the system during its development  Modularity and minimum requirements Standard facilities for display, browsing and manual analysis of the Individual System signals are mandatory ISA modules are also essential in terms of the capture of the incidents and faults signatures and thus are important for the equipment safety LSA and GSA modules providing an automated data reduction, building a ‘model’ of quench process, testing the measured equipment data against the model or against references are essential for the HWC and operational efficiency  Some of the building blocks of the GMPMA System can wait – but not a lot

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 14/16 GMPMA development milestones Minimum requirements

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 15/16 Remarks  Energy stored in the magnets is very high (much higher than the beam energy) and can be very destructive  In superconducting circuits certain critical electrical faulty states can be concealed at operational condition due to equipotentiality of the superconductors.  The quality and damage-free commissioning of the main ring magnet system will depend not only on the time allocated to the commissioning, but also on the availability of the high level software analysis tools. There are two BASICALLY DIFFERENT types of the POST MORTEM ANALYSIS OR The right choice seems to be obvious!

Post Mortem Workshop 16-17/01/2007A. Siemko/AT-MTMSlide 16/16 Conclusion  The GMPMA System, which is under development by AB/CO is a highly complex, high level application, integrating variety of the equipment, instrumentation and subsystems  The GMPMA is an essential tool for” Efficient HWC Safe HWC and machine operation  Job is far from being finished Remaining ISA and LSA modules need to be developed before starting parallel HWC in two sectors!  Very limited number of experts, capable to specify the GMPMA modules and algorithms exist at present Resources for the GMPMA development were not originally anticipated Existing experts are either installing their equipment or, due to expiration of their CERN contracts, are looking after new jobs  Further integration of the LHC GPMA System development effort seems to be needed to avoid separate development of tools with similar functions.