AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
By Sudhir K. Saxena Exe.Engg.Elect.Engg. Mgt/RB. Electricity consumption over Indian Railways for traction & non-traction.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
1 TARIFF DESIGN for GENERATING STATIONS -- Bhanu Bhushan -- Feb 2011.
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Madhya Pradesh Electricity Regulatory Commission Terms and Conditions of Tariff MPERC Comments on CERC Discussion Paper.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -R M Rangarajan & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
SCHEDLING MECHANISM AND RELATED ISSUES T. SRINIVAS MANAGER,SRLDC BANGALORE.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Energy Accounting and Need for Special Energy Meters under ABT Regime.
AVAILABILITY BASED TARIFF. HIGHLIGHTS OF CERC ORDER DATED ON ABT 1. ORDER APPLICABLE TO J&K ALSO. 4. ABT WAS TO BE IMPLEMENTED IN ALL THE REGIONS.
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
Regulation and Commercial Issues in Bulk Power Generation Tariff By S.C.SHRIVASTAVA, Joint Chief (Engg) CERC, New Delhi 10/7/20151CERC.
Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
PRESENTATION On National Hydroelectric Power Corporation Ltd. ( A Govt. of India Enterprise) Sector – 33, Faridabad (Haryana), INDIA “Comments on Discussion.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
LOAD FORECASTING T SRINIVAS MANAGER SRLDC. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK DETAILS.
GRID OPERATION AND CONTROL. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Settlement System under ABT Regime. WHAT IS SETTLEMENT ? “ Settlement means finalisation of payment bill after consumption” To be FAIR and EQUITABLE To.
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
Availability Based Tariff (ABT) in Northern Region.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Smart Grid Tariff Changes
Open Access Power Purchase
Scheduling of Collective Transactions Through Power Exchange
Hon’ble Commission has issued Interim order dated 19/ directing :
REGIONAL ENERGY ACCOUNT BASED ON AVAILABILITY BASED TYARIFF
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
“ MERIT ORDER SCHEDULING AND
Presentation transcript:

AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM

THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM BENEFICIARY CAPACITY ALLOCATION > 5 YEARS POWER PURCHASE AGREEMENTS CAPACITY COMMITTMENT 1-5 YEARS SHORT TERM AGREEMENTS DAY-AHEAD SCHEDULING DAY AHEAD - 3 MONTHS

Components of inter-utility tariff (Pre – ABT Mechanism i.e. the mechanism used to exist about 5 years back) Tariff used to consist of the following built-in components:  Fixed charges - Interest on loans - Depreciation - O & M charges - Return on equity - Interest on Working Capital  Energy charges (fuel cost)  Incentives  Surcharge & other levies  No charge for reactive energy

TENTATIVE COST FOR NTPC THERMAL STATIONS FOR THE MONTH OF JUNE 2004 Station Fixed Cost Rs. Cr/yr (1) Average Fixed Cost Rs. Cr/day (2) Average Fixed Cost P / KWh (3) Variable Base Cost P / KWh (4) Variable FPA P / KWh (5) Total Variable Base Cost P / KWh (6) Composite Cost P / KWh (3) + (6) Ramagundam Talcher Stage II Singrauli Rihand Unchahar – I Anta GPS* Auraiya GPS* DadriGPS G) Dadri (T) Unchahar – II Dadrigas(L) *Rates for mixed fuel (gas+ liquid fuel, naphtha)

Availability Based Tariff (ABT) the presently followed mechanism Tariff is split into the following separate components:  Capacity charges  Energy charges  Unscheduled Interchange (UI)

AVAILABILITY BASED TARIFF (A) CAPACITY CHARGE (B) ENERGY CHARGE (C) ADJUSTMENT FOR DEVIATIONS (U I CHARGE) (U I CHARGE) (A) = a function of the Ex-Bus MW availability of Power Plant for the day declared before the day starts x SEB’s % allocation from the plant (B) = MWh for the day as per Ex-Bus drawal schedule for the SEB finalised before the day starts x Energy charge rate (C) = Σ (Actual energy interchange in a 15 minute time block – scheduled energy interchange for the time block) x UI rate for the time block TOTAL PAYMENT FOR THE DAY = (A) + (B) ± (C)

FEATURES :  ( A) and (B) do not depend on actual plant generation / drawal. No metering required for this as they are based on off-line figures. All deviations taken care of by (C)  No complication regarding deemed generation.  Perpetual incentive for maximizing generation and reducing drawal during deficit, but no incentive to over generate during surplus.

IN SR MW OF THERMALS OUT OF MW (93%) HAS VARIABLE COST THAT FALLS IN THE RANGE OF 60PAISE TO 400 PAISE DETAILS>400 Ps/u CAP N D ESC TO EXIT

DAY AHEAD SCHEDULING Schedules are made for each 15 minute time block wise on day ahead basis i.e. 96 time blocks in a day. Participating agencies are ISGS and States. Bilaterals/STOAs are also included in the preparation of schedules. RLDC prepares and coordinates the schedules. On the day of operation the schedules can be revised with prior intimation i.e. 4 to 6 time blocks.

SCHEDULING Availability Declaration Entitlements SLDCSLDC Requisition & Bilateral Agreements Injection Schedule Drawal Schedule Revision in DC Revision in Requisition Final Injection Schedule Final Drawal Schedule 10:00 11:00 15:00 17:00 22:00 23:00 RLDCRLDC ISGSISGS Time Revisions during Current day Revisions during Current day 0 to 24 hours RLDC

TIME TABLE FOR EXCHANGE OF INFORMATION IN RESPECT OF SCHEDULING By hrs.ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities By 1100 Hrs.SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements. By 1500 hrs.SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC. By 1700 hrs.SRLDC shall convey the ex-power plant despatch schedule to each ISGS and net drawal schedule to each State / Beneficiary. The details of unrequisitioned surpluses shall also be intimated. By2200 hrs.ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule By 2300 hrs.SRLDC shall issue the final despatch and drawal schedule. ESC TO EXIT

BY 10: 00 HRS ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities Back SAMPLE DC SHEET

BY 11: 00 HRS Back SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements. SAMPLE ENT. OF STATES

BY 15: 00 HRS SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC. Back

BY 17: 00 HRS SRLDC shall convey the ex-power plant despatch schedule to each ISGS SRLDC shall convey the net drawal schedule to each State / Beneficiary The details of unrequisitioned surpluses shall also be intimated. Back SAMPLE SCHD OF STATES SAMPLE SCHD OF ISGS

BY 22 00HRS Back ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule

BY 23 00HRS SRLDC shall issue the final ex-power plant despatch schedule to each ISGS SRLDC shall issue the final net drawal schedule to each State / Beneficiary Back

SHOW TABLE HIDE TABLE 30 Ps 45 Ps 80 Ps