R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
© Robert Baumann 3/27/2015 TI Information – Selective Disclosure Slide 1/ Future Circular Colliders Conference © Robert Baumann 3/27/2015 Slide.
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
Fraunhofer Test-Campaigns March 25 th 2013 (R2E) Mitigation Project: RadWG March 25 th 2013 FRAUNHOFER Test-Campaigns & Facilities M. Brugger.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
RADWG 6 TH TH NOVEMBER 2013 G. Spiezia (EN/STI/ECE)
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
TRACKING OF FAULTS AND FOLLOW-UP Accelerator Fault Tracking project Jakub Janczyk (TE-MPE-PE / BE-CO-DS) with input from: Andrea Apollonio, Chris Roderick,
R2E and Availability Workshop Interlock Systems I.Romera, M.Zerlauth, B.Todd, S.Gabourin, P.Dahlen, R.Mompo, Y.Bastian, C. von Siebenthal + many colleagues.
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
CERN Converter Control Electronics Setting the Scene
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Goal: in view of LS2/LS3/HL-LHC – evaluate possible life-time constraints in IR3/7 radiation levels equipment damage and respective lifetime considerations.
LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
R2E Availability October 17 th 2014 ADC and Common development options G. Spiezia.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures M. Calviani, M. Brugger, G. Spiezia (EN/STI) E. Blanco, J.M. Beckers, D.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
R2E Workshop Preparations RadWG Meeting March 25 th.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Planning and strategy for HL-LHC R2E
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Irradiation test of Commercial (BASLER) digital cameras
Cryo equipment strategy in the R2E context
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
LIU – EVM status and next steps
AD consolidation activities in LS2
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
R2E – Experience and Outlook for LS1
FRAUNHOFER Update on Test-Campaigns
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
X X X QURA PLC X RM01_R X RM01_L Long-Term?: QURC(A,B) QUI (-1)
Status and evolution of radiation dose on 60A power converters
Update on expected HL-LHC radiation levels
Collimator Control (SEUs & R2E Outlook)
Preliminary Analysis and foreseen actions EN-ICE&EN-STI
RADIATION induced failures in LHC 28th June 2011
MICROFIP-Do we need further tests? 28th June 2011
R2E LMC Update (Weeks 32/33) Post-Mortem database: SEE analysis and link to existing RadWG list in preparation Shielding block delivery crisis solved:
Radiation Working Group RADWG
Presentation transcript:

R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia

R2E Availability October 15 th 2014 Outline  Recall of Run-1  What changes after LS1  Equipment and radiation impact to be expected for after LS1  How to face the challenge  Conclusion

R2E Availability October 15 th 2014 Failures 2012 Dump ConfirmedDump TBCNo DumpNo Dump TBC Destructive failures Dump ConfirmedDump TBCNo DumpNo Dump TBC 17140

R2E Availability October 15 th 2014 What was done and what remains  Previous LS1  Immediate relocation  Shielding (2011)  LS1  Main impacted systems – observed failure signatures:  Equipment Upgrades and new developments  Relocation (UJs, US85, UX45)  Shielding (RRs)  Conditions after LS1  DS/ARC will be more and more loaded  Long-term damage to be considered in cells 8-13  Impact of 25ns operation to be evaluated  Future upgrades/changes/new installations to be evaluated  Continuous check of the ‘safe areas’, e.g. RE

R2E Availability October 15 th 2014 SEE Failure analysis Without giving numbers it is clear that the there is little margin on the budget for radiation failures ~250 h Downtime ~400 h Downtime LS1 – LS2 Aiming for <0.5 dumps / fb -1 ~12 dumps / fb -1 ~3 dumps / fb -1 HL-LHC: < 0.1 dumps / fb -1 Relocation & Shielding Equipment Upgrades Mitigation Prevention Rad-tol design No unqualified equipment in exposed areas

R2E Availability October 15 th 2014 Equipment overview (LHC and Injectors) A&T QPS Power Converter Cryogenic Interlock systems Radiation Monitor &Testing Beam Instruments RF Kicker magnet Control Equip SurveyVacuum CV IT tools Safety and Alarms Light system 100 Gy – 10 kGy HEH/cm subsystems for each equipment 100 Gy – 10 kGy HEH/cm subsystems for each equipment LHC & PSB,PS, SPS LHC

R2E Availability October 15 th 2014 Equipment overview (LHC and Injectors) A&T QPS Power Converter Cryogenic Interlock systems Radiation Monitor &Testing Beam Instruments RF Kicker magnet Control Equip SurveyVacuum CV IT tools Safety and Alarms Light system LHC & PSB,PS, SPS LHC SEE

R2E Availability October 15 th 2014 Equipment overview (LHC and Injectors) A&T QPS Power Converter Cryogenic Interlock systems Radiation Monitor &Testing Beam Instruments RF Kicker magnet Control Equip SurveyVacuum CV IT tools Safety and Alarms Light system LHC & PSB,PS, SPS LHC Cumulative effects 70 Gy

R2E Availability October 15 th 2014 Equipment overview (LHC and Injectors) A&T QPS Power Converter Cryogenic Interlock systems Radiation Monitor &Testing Beam Instruments RF Kicker magnet Control Equip SurveyVacuum CV IT tools Safety and Alarms Light system LHC & PSB,PS, SPS LHC Cumulative effects

R2E Availability October 15 th 2014 Examples to clarify SEE and prevention  LHC: few thousand electronic units exposed  Aim: less than one radiation induced failure per operational week  Reliability in FIT: aiming for few hundred FITs/SYSTEM! Example of System © R. Baumann LHC case: REALLY CARE

R2E Availability October 15 th 2014 Examples to clarify TID effect and prevention Acquisition system example Repeated N times in the ring Failure at 70 Gy Multiplexer behaviour month  Sample to sample variation is limited for TID  N acquisition systems in error between month 4 and 5 TID (Gy)

R2E Availability October 15 th 2014 Recipe for Prevention/Availability Availability Rad Tol development Monitor Calibration Radiation levels Failures Test Facilities Instruments

R2E Availability October 15 th 2014 Test (done and needed)  A&Ts electronic designs based predominantly on COTS  :almost 100 components tested/qualified  Special agreements & Blanket Contracts with facilities  “Prime-Time” at PSI  “Main customer” of Fraunhofer  In house facilities  Co60 source (with RP)  CHARM  Radiation test team of EN/STI working together with all equipment groups  Coordinated through the RadWG  Available Data: See summary table of RadWG test campaigns, Twiki for all Fraunhofer related testssummary table Twiki

R2E Availability October 15 th 2014 Monitor (done and needed)  Follow up and tracking of the equipment failures  Radiation levels reports on a weekly basis  New RadMon version

R2E Availability October 15 th 2014 Rad Tolerant Developments  FGC Lite development  Power Converter development  QPS equipment upgrade  Cryogenic update for the heater  And others (see talks Session2)

R2E Availability October 15 th 2014 Rad Tolerant Developments  Why not evaluating common needs for qualifying rad-hard devices? Today

R2E Availability October 15 th 2014 Rad Tolerant Developments  Why not evaluating common needs for qualifying rad-hard devices? Tomorrow ?

R2E Availability October 15 th 2014 Structure

R2E Availability October 15 th 2014 Conclusion  Past  Errors identified and mostly corrected  Direct impact on the beam dump mitigated  Today  Budget for failure rate is low  After LS1 effort Equipment availability is good  Effort to move from mitigation to prevention  Run2 and next  SEE and cumulative effects (TID+DD)  Keep doing what was done so far ….  Test, monitor, continue rad tolerant developments  Individuate the common requirements to share effort (cost/time/manpower)