LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.

Slides:



Advertisements
Similar presentations
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
Advertisements

1 Working meeting Warsaw, :00 – 13:00 – WORKING MEETING Progress of the project: activities, budget changes – LP-Part Project schedule & plan.
1 PODEBA Use of poultry dejection for the bating phase in the tanning cycle Alice Dall’Ara– ENEA Sergio Sangiorgi - ENEA 12/06/ month meeting Elda.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
LIFE10 ENV/IT/ «ECOFATTING» «Environmentally friendly natural products instead of cloroparaffines in the fatting phase of the tanning cycle» EMILIA.
LIFE+ Environment project: LIFE 09 ENV/GR/ Presentation of the LIFE+ project: Strategic Planning Towards Carbon Neutrality in Tourism Accommodation.
1 Technical & Progress Meeting INESCOP PROJECT PROGRESS AND PLANNED ACTIVITIES Pisa (Italy) ICCOM-CNR 22 nd June 2012 Mercedes Roig Joaquín Ferrer INESCOP.
PROJECT LIFE12 ENV/IT/ “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.
LIFE13 ENV/IT/461 EVERGREEN Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control Start:
PROJECT LIFE12 ENV/IT/00036 “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.
LIFE12 ENV/IT/356 «RESAFE» « Innovative fertilizer from urban waste, bio-char and farm residues as substitute of chemical fertilizers» 6 MONTH MEETING.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Elda – Alicante (Spain)
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
VITA- Virtual Learning for the Management of successful SMEs LEONARDO DA VINCI PROJECT – TRANSFER OF INNOVATION January 2009 – December PTI-LEO
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 29 th of April, st Steering Committee.
1 1 Final Meeting INESCOP PROJECT PROGRESS AND DISSEMINATION ACTIVITIES Pisa (Alicante) ICCOM-CNR 11th December 2013 Mercedes Roig Joaquín Ferrer INESCOP.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
RESISTVIR Work Package 1 (Project Management & Further Development) Mid-Term Meeting 7 th July 2006 Damian Cooper-Smith Chalex Research.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
Progetto: LIFE11 ENV/IT/113 «BIOREM» «Innovative System for the Biochemical Restoration and Monitoring of Degraded Soils» Start: 01/01/2013 End: 31/03/2015.
11 18th Months Meeting INESCOP PROJECT PROGRESS & PLANNED ACTIVITIES Elda - Alicante (Spain) INESCOP 7th July 2015 Mercedes Roig Joaquín Ferrer INESCOP.
Regulatory requirements in the current programming period Funchal, 18 November 2010.
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
LLP-LDV/TOI/07/IT/016. F-MU.S.EU.M. PROJECT: STATE OF THE ART AND INTERMEDIATE REPORT TO SUBMIT AT 15 DECEMBER Marco Merlini F-M U.S.EU.M. (Form Multimedia.
Progetto: LIFE11 ENV/IT/109 «SOREME» «Low cost sorbent for reducing mercury emissions» Start: 01/01/2013 End: 31/12/ /01/ month progress meeting.
LIFE12 ENV/IT/ BIONAD “Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle” Start: 01/01/2014.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
Finance After sending the signed contract : 80 % total amount After sending the final reports (content and financial) ànd acceptance by NA : 20 % subsidy.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE Foreign Relations Department Projects Group TurkStat Meeting of the Policy Group on Statistical.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
LIFE13 ENV/IT/461 EVERGREEN Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control Start:
LIFE13 ENV/IT/ ECODEFATTING Environmentally friendly natural products instead of chemical products in the degreasing phase of the tanning cycle Start:
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
LIFE12 ENV/IT/356 «RESAFE» « Innovative fertilizer from urban waste, bio-char and farm residues as substitute of chemical fertilizers» FINAL MEETING December,
Project Board meeting 15 th July 2011, Vilnius Kate Fernie MDR Partner This project has been funded with support from the European Commission'
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
11 NEWPORT Santa Croce sull’Arno - Pisa (Italy) 22nd October 2015 Mercedes Roig INESCOP LIFE 13 ENV/IT/470 Environmentally friendly natural products instead.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Sectoral Operational Programme “INCREASE OF ECONOMIC COMPETITIVENESS” October 2005 MINISTRY OF ECONOMY AND TRADE.
USG People 19th of November 2010 Second monitoring October 2010 Feedback of results “Evaluation activities in Leonardo da Vinci projects focus on the systematic.
11 30th Months Meeting INESCOP PROJECT PROGRESS & PLANNED ACTIVITIES UNIFI - Firenze (Italy) 27th January 2016 Mercedes Roig Joaquín Ferrer INESCOP LIFE.
2016 Annual Event ‘’H2020 NCPs Training’’ Minsk, March 2016 Project Management and Implementation IncoNet EaP is a project funded under the 7th European.
Practical work (simulation) Financial forms Peter Jany.
LIFE14 ENV/IT/113 HORTISED "Demonstration of the suitability of dredged remediated sediments for safe and sustainable horticulture production" Progress.
LIFE14 CCM/IT/ FoResMit Recovery of degraded coniferous forests for environmental sustainability restoration and climate change mitigation Monitoring.
PROJECT LIFE12 ENV/IT/ “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
Co-Financed by European Regional Development Fund and made possible by the INTERREG IVC MITKE Overall progress 5th Steering Group Meeting Rzeszów, 30th.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 9 th of February, th Steering Committee.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Project Management Financial management
EQAVET Annual Network Meeting
SKADS Controller’s Meeting Timeline Annual Financial Report
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
AMICI WP1 – Management, coordination and dissemination
SOCIAL DIALOGUE WITHIN EUPAN
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Financial and Administrative presentation on PARTICULATES project
WP 1 Management and Coordination
Presentation transcript:

LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014 End: 30/06/ /01/ month meeting Torviscosa Serichim Premises

AGENDA 09:30 [Serichim] Welcome and opening of the meeting 09:35[All] Actions carried out by each partner and scheduled activities from June 2014 until the end of December :00 [All] Open discussion on actions carried out 11:15[All] Coffee break 11:30[All] BIONAD Technical future issues:  [ICCOMCNR] Technical activities scheduled in the next six months of the project  [All] Open discussion on actions to be carried out in the next six months of the project LIFE12 ENV/IT/352 «BIONAD»

AGENDA 12:30[ICCOMCNR] Management and dissemination issues 13:00[All] General questions 13:00End of progress meeting 13:00 Tour of Serichim premises and laboratories 13:30 Lunch LIFE12 ENV/IT/352 «BIONAD»

Technical Actions carried out by each partner in the last six months   B3 Demonstration of natural dyes as stable chemical substances   B4 Demonstration of naturalised dyes in leather dyeing at laboratory level   B5 Demonstration of natural dyes on kilo-scale synthesis   C1 Monitoring on the environmental impact of acid dyes within leather manufacture   C2 Monitoring of dyeing effluents depuration using bacteria at laboratory level

Presentations of: UNIFI ICCOMCNR BIOKIMICA INESCOP SERICHIM LIFE12 ENV/IT/352 «BIONAD»

[All] Open discussion on actions carried out LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions D1 Naturalised dyes manual D2 Leather sample books of hides dyed with naturalised dyes D3 Training course for Italian tanneries D4 Training course for Spanish tanneries D5 Demonstration workshop in Italy D6 Demonstration workshop in Spain D7 Project website D8 Notice boards D9 Diffusion material preparation LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions D10 Articles and press releases D11 Demonstration workshop, seminars, conferences and other events D12 Dissemination to Institutions and policy makers D13 International fairs and other events D14 Digital supports for international diffusion D15 Networking D16 Layman's report D17 After-LIFE Communication Plan LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions carried out by each partner in the last six months D7 Project website D9 Diffusion material preparation D10 Articles and press releases D11 Demonstration workshop, seminars, conferences and other events D12 Dissemination to Institutions and policy makers D13 International fairs and other events D14 Digital supports for international diffusion D15 Networking LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions carried out by each partner in the last six months D7 Project website BIONAD website in English and in Italian: INESCOP is preparing the Spanish version Each beneficiary has implemented the link between the BIONAD website to the beneficiary website LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions carried out by each partner in the last six months D9 Diffusion material preparation 5,000 BIONAD brochures 600 BIONAD pendrives INESCOP designed and produced 1,000 labels to identify leather samples as project gadget 1 BIONAD tissue poster 2 BIONAD specific posters by INESCOP 1 BIONAD roll-up 1 Italian project presentation 1 Spanish project presentation LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions carried out by each partner in the last six months D10 Articles and press releases 3 articles directly related to BIONAD in INESCOP’s EnvironmentNewsletter Sep’13, Feb’14, June 14 4 indirect articles related to the participation of BIONAD to the CNR event (in local and web newspaper) 1 TV interview during the LIFE CNR event in CNR premises on 25 March articles (Italian and English) in Platinum journal 1 technical article in “Dyes & Pigments” LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions carried out by each partner in the last six months D11 Demonstration workshop, seminars, conferences and other events Meeting Leonardo Project: Step to sustainability July 2013, Barsov – Rumanía LIFE CNR event in CNR premises on 25 March 2014 University of Siena event about life, Siena 29 May 2014 Event in Parma May 2014 Event in Lucca, June 2014 Event in Novartis company in Siena on 8 May 201 UNIFI LIFE event at Firenze on 24 th October 2014 Workshop titled “Clean Technologies in the Tanning Industry”, Valencia (Spain), 7th November 2013 Workshop titled “Innovative Technologies in the Tanning Industry”, Valencia (Spain), 18th June 2014 LIFE+ Networking Event, 10 July 2014, Valencia (Spain) LIFE+ Networking Event,19 November 2014, Ibi -Alicante (Spain) LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions carried out by each partner in the last six months D12 Dissemination to Institutions and policy makers All the BIONAD beneficiaries are responsible for the organisation of specific communication activities in order to disseminate the project actions and results to Institutions and policy makers. The following preliminary contacts with institutions have been taken: o Councillor for the Environment of Pisa City - Italy o Environmental Department of Pisa Area - Italy o Senator of the Italian Government - Italy o Meeting of the Leonardo project “Competences pour l’Europe” (reference: IT1-LEO ), Brasov (Romania), July 2013 o Union for the Mediterranean Ministerial Conference on Environment and Climate Change, Athens (Greece), 13th May 2014 LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions carried out by each partner in the last six months D13 International fairs and other events Green week in Brussels 2-5 June 2014 UfM Ministerial Meeting on Environment and Climate 13 May 2014, Athens – Greece Co-Shoes Fair, October 2014, Alicante (Spain) LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions carried out by each partner in the last six months D14 Digital supports for international diffusion Each beneficiary started to define the specific video of each beneficiary activity ICCOMCNR started to have some contacts with some expert video companies in order to organise the general structure of the video ICCOMCNR started to work on the video text LIFE12 ENV/IT/352 «BIONAD»

Dissemination actions carried out by each partner in the last six months D15 Networking Cluster with OXATAN, SHOELAW, ECOFATTING, PODEBA, MICROTAN, SHOEBAT, CO2SHOE, SOREME, RESAFE, ECODEFATTING (LIFE projects) BIONAD specific presentation at the CNR LIFE event at Pisa on 25 th March 2014 Networking contacts at the CNR LIFE event at Pisa on 25 th March 2014 Networking contacts at the UNIFI LIFE event at Firenze on 24 th October 2014 LIFE+ Networking Event, 10 July 2014, Valencia (Spain) LIFE+ Networking Event,19 November 2014, Ibi -Alicante (Spain) LIFE12 ENV/IT/352 «BIONAD»

 ACTION E.1: Project management  ACTION E.2: Monitoring  ICCOMCNR has continuous contact with all project partners for monitoring project activities  ICCOMCNR prepares and sends a summary of the project activities carried out to monitoring team at the end of each month  ICCOMCNR receives from each beneficiary technical inputs for the monitor month summary  Definition of management structures  Definition of payment procedures of each beneficiary  ICCOMCNR organised the kick-off meeting in January 2014 in ICCOMCNR premises  Biokimica organised the 6 progress meeting in June 2014 in Biokimica premises LIFE12 ENV/IT/352 «BIONAD»

 ACTION E.1: Project management  ACTION E.2: Monitoring  ICCOMCNR uses project progress indicators for monitoring project activities  ICCOMCNR will revise the project progress indicators in each of the projects coordination meeting in order to check any irregularities  ICCOMCNR will check the number and type of people reached by each dissemination activity in order to check if the diffusion actions have met their goals LIFE12 ENV/IT/352 «BIONAD»

 ACTION E.1: Project management  Definition of management structures  Management and technical committe ICCOMCNR: Alessandro D’Ulivo UNIFI: Roberto Bianchini Biokimica: Marco Mazzoni INESCOP: Mercedes Roig SERICHIM: Pietro Delogu  Administrative committe ICCOMCNR : Manuela Cempini UNIFI: Silvia Borselli Biokimica: Sabrina Vastola INESCOP: Julio Gutierrez SERICHIM: Giuseppina Vassallo LIFE12 ENV/IT/352 «BIONAD»

 ACTION E.1: Project management  Definition of payment procedures of each beneficiary  Each beneficiary has a specific payment responsible ICCOMCNR: Alessandro D’Ulivo selects the project cost formally approved by department director UNIFI: Roberto Bianchini selects the project cost formally approved by department director or DISPAA council Biokimica, INESCOP and SERICHIM: Marco Mazzoni, Mercedes Roig and Pietro Delogu select the project cost formally approved by company director and administration department  ICCOMCNR and UNIFI have specific project code and tender procedures  Biokimica, INESCOP and SERICHIM have separated project cost management and respect best value for money rules LIFE12 ENV/IT/352 «BIONAD»

BIONAD Technical future issues for the next six months  B6 Demonstration of naturalised dyes in leather dyeing at pilot scale level  C3 Monitoring of quality improvement for leather dyed with naturalised dyes  C6 Monitoring of quality assessment for leather dyed with naturalised dyes LIFE12 ENV/IT/352 «BIONAD»

BIONAD Technical future issues for the next six months [All] Open discussion on actions to be carried out in the next six months of the project LIFE12 ENV/IT/352 «BIONAD»

BIONAD Dissemination issues balance  D3 Training course for Italian tanneries: start to organise  D4 Training course for Spanish tanneries: start to organise  D7 Project website: update  D8 notice boards (end M3): OK  D9 Diffusion material preparation: more posters (foreseen 25 Posters, 10,000 leaflets/brochures/factsheets, 2,500 various branded items, now 5,000 brochures, 1,600 gadgets, 3 posters, 1 roll-up, 2 presentations)  D10 Articles and press release: OK (foreseen 30 articles, now 10 and 1 TV interview)  D11 Demonstration workshop, seminars, conferences and other events: OK OK (foreseen maximum dissemination, now 11 events) LIFE12 ENV/IT/352 «BIONAD»

BIONAD Dissemination issues balance  D12 Dissemination to Institutions and policy makers: OK (foreseen successful communication, now 5 contacts/meetings)  D13 International fairs and other events: OK (foreseen maximum dissemination, now 3 fairs/events)  D14 Digital supports for international diffusion: start (foreseen project video)  D15 Networking: OK OK (foreseen 10 projects, now 10) LIFE12 ENV/IT/352 «BIONAD»

ADMINISTRATIVE ISSUES  Inception Report evaluation  Mid-Term Report  Next Deliverables  Partner costs May 2014  Budget “movement”: Amendment?!  Next meeting LIFE12 ENV/IT/352 «BIONAD»

INCEPTION REPORT EVALUATION LIFE12 ENV/IT/352 «BIONAD» POSITIVE EVALUATION Some remarks:   In the Midterm Report:   Complete Deliverable B2 by highlighting some technical results   Complete Deliverable C1 with specific technical results   Complete Deliverable B4 with specific technical results   Complete Dissemination Annex with specific information   Website: texts more accessible   Cost accounting: private Beneficiaries cost centres   Unforeseen costs: quantify, detail and justify

MID-TERM REPORT LIFE12 ENV/IT/352 «BIONAD» ICCOMCNR will be responsible of the production of the Mid- Term report which will be made up by:   Progress report with the summary of technical, administrative and dissemination project issues   Administrative summary excel files of each beneficiary of project costs with signatures   Dissemination Annex   Deliverables (foreseen and EC requested)   Possible Technical Reports The Mid-Term Report deadline is 31 March 2015 The EC ok of the Mid-Term Report, with the demonstration to have spent more than the 150% (€ 435,428) of the pre- financing received (€ 290,285), will produce the second project payment from the EC

MID-TERM REPORT LIFE12 ENV/IT/352 «BIONAD»   Documents needed from each partner   Check of financial documents for final original versions with signatures

MID-TERM REPORT LIFE12 ENV/IT/352 «BIONAD» Deadline   ICCOMCNR will send to each beneficiary a form for technical and dissemination contribution for the Mid-Term Report no later than 10th of February 2015   Each beneficiary has to send to ICCOMCNR all the technical contribution no later than end of February 2015 (except some March activities)   Each beneficiary has to send to ICCOMCNR all the dissemination contribution no later than end of February 2015 (except some March activities)   Each beneficiary has to send to ICCOMCNR the draft of all the administrative excel documents no later than end of February 2015   ICCOMCNR will send to each beneficiary the comments on the draft of all the administrative excel documents no later than 7th of March 2015   Each beneficiary has to send to ICCOMCNR all the final administrative excel documents with signatures no later than 15th of March 2015   ICCOMCNR will send to EC and Monitoring agency all the Mid- Term Report documents no later than 31st of March 2015

NEXT DELIVERABLES LIFE12 ENV/IT/352 «BIONAD» All the following Deliverables will be annexes of the Midterm Report :   Natural dyes on kilo-scale synthesis: Action B.5   Deliverables requested by the Inception Report evaluation:   Updated Deliverable B2   Updated Deliverable C1   Deliverable Action B4: Demonstration of naturalised dyes in leather dyeing at laboratory level

PARTNER COSTS December 2014 LIFE12 ENV/IT/352 «BIONAD» PARTNERCLAIM Personne l Personnel December 2014Travel Travel December 2014 External assistanc e External assistance December 2014 Consuma bles Consumable s December 2014 Overhea ds Overheads December 2014TOTAL TOTAL December 2014 ICCOMCNR 244, , , ,400 18, ,000 20, ,000 12, , , UNIFI 143,000 58, , ,300 1, ,000 29, ,000 6, ,440 96, SERICHIM 133,500 86, , ,000 60,000 12, ,000 6, , , BIOKIMICA 175,500 84, ,140 15,400 30, ,000 16, ,000 9, , , INESCOP 118,500 58, ,790 1, ,000 4, ,000 7, ,106 5, ,396 77, TOTAL 814, , ,350 3, ,100 54, ,000 86, ,106 39, ,469, ,074.23

Budget “movement”: Amendment?!  Each beneficiary has to evaluate internal project costs and define eventual budget movement  ICCOMCNR, as coordinating beneficiary, will collect all the beneficiary eventual budget movement and will analyse the possibility to prepare a project amendment LIFE12 ENV/IT/352 «BIONAD»

Projects MEETINGs LIFE12 ENV/IT/352 «BIONAD»   1st Kick off meeting in ICCOMCNR in Italy in January 2014   2nd Coordination meeting in Biokimica in S.Croce sull’arno (Italy) on June 13th 2014   3rd Coordination meeting in SERICHIM in Torviscosa (Italy) on 29th January 2015 Next Project meeting   4th Coordination meeting in INESCOP in Elda (Spain) on June 2015   5th Coordination meeting in UNIFI in Florence on January 2016   Final meeting in ICCOMCNR Italy on June 2016