BGV 03-nov-2015CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and TS3 installation plans Valdir & Massi.

Slides:



Advertisements
Similar presentations
Preferred Utilities Manufacturing Corp.
Advertisements

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Unit 206: Domestic hot water systems
AC-SSC-1 Installation and operation manual
Installing Residential Central Air Conditioning Systems This is a condensing unit with flared or brazed tubing connections and service valves. Refrigerant.
Bunsen Burner Mr. Skirbst Physical Science Topic 10.
27/10/ PHOS Cooling status (1-27 Oct) Brief History: 28 Sep start cool down. Steps (by liquid) was: +17, +5, -3, -10, -15,
BCAL Interlock System US BCAL Chiller US BCAL MPOD 1 US BCAL PLC Pulsed Output from Flow meter to PLC From US BCAL cooling loop US BCAL MPOD 1 RS485 from.
Cable Channel tests ____________________________________________________________ 17/Apr/07 Pisa Group Four configurations of insulation has been tested.
Installation and Initial Start Up by Martin Noska, Service Engineer, Aftersales & Service.
Engineer Training Troubleshooting TJ8300 / TJ8500 Troubleshooting.
Given Connections Solution
Pixel Cooling System Modifications C. Newsom December 17, 2009 University of Iowa.
CAFS On-Line Orientation Montgomery County Fire & Rescue Service Operating the CAFS Controllers.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Irrigation Controllers. The Brains of the Operation Controllers are effectively the “brains” of the irrigation system Used to carry out watering schedules.
NA62 – GTK Cooling Station 1 Main characteristics Fluid: C 6 F 14 (fluorocarbon) Operating temperature: -30 °C ÷ -10°C Temperature precision: ±1 K Temperature.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
20/10/ PHOS Cooling status (1-20 Oct) Brief 28 Sep start cool down. Steps was: +5, -3, -10, -15, -20, -25, -30°C (by liquid).
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
01/10/ PHOS Cooling status (1 Oct) Incident happened (ECV failure) 1 Oct at 5 Am cooling plant failure happened: ECV (electrical.
BGV 05-may-2015CERNMassimiliano Ferro-Luzzi 1 BGV cooling : test & installation plans  point 8  LHC tunnel.
IBL cooling thermal chock incident 15 October The IBL cooling team.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
CUE – Make Any Pump an E-Pump
LESSON 16 ENGINE OPERATION
ECS workshop, CERN, may ‘00M. Ferro-Luzzi LHCb Vertex Detector System Reminder of current VELO design Controls: Motion mechanics Vacuum system Cooling.
Connections are loose for draining pump Water in From street Water out to house This is the setup for public water Pressure and the pump system turned.
Solutions for Hotel HDL-MHRCU.431.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
BGV 23-feb-2016CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and plans reporting on behalf of EN-CV (Sylvain Nichilo & Olivier Crespo-Lopez)
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
Introduction to Mechanical Engineering
IBBelle: Status & Plans
University of Colorado – Boulder
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Forum on Tracking Detector Mechanics - Bonn, May 2016
Tracker cooling loop “check out” draft for discussion
Pixel Cooling System Modifications
Andreas Alexopoulos BGV Meeting #98 25 / 01 / 2017
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Hazardous Gas Alarm System
November technical stop activities:
CAFS On-Line Orientation
< How to assemble the Mechanical Interlock Unit AR-12M >
Door Heat Exchanger: Specification
Presentation transcript:

BGV 03-nov-2015CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and TS3 installation plans Valdir & Massi

BGV 03-nov-2015CERNMassimiliano Ferro-Luzzi 2Status  Cooling installed for BOTTOM detectors  TOP lines from manifold are in closed loop with valve quasi-closed  Valdir reports a leak when circulating of about 21 to 36 ml/h –See BGV meeting #65, 8-sep-2015  Reports also: when OFF the leak seems smaller, < 1.78 ml/h –See BGV meeting #66, 22-sep-2015  Access on 14-oct-2015, –Level at ~1.4l, down from ~2.6l on 07-sep-2015, thus ~1.5 ± 0.4 ml/h –Refilled and restarted cooling circulation, set point 0.7bar 15C  Chiller turns OFF (failure) on 19-oct-2015 ? – “the relay lock of the safety mechanism is still active”  Need access to restart (we have no remote power cycle option)

BGV 03-nov-2015CERNMassimiliano Ferro-Luzzi 3 Plan for TS3  Prepare four distributors with all tubing and insulation –Leak-test in the lab  Set up a plateau just above the BOTTOM distributors, with brackets on the four poles of the BGV frame  Install distributors (when ?)  Connect TOP module cooling lines (when ?)  Circulation test, check flow and leaks at module connections  Finish insulation  Chiller will probably need a refill  If time enough: test with dry air interlock

BGV 03-nov-2015CERNMassimiliano Ferro-Luzzi 4 Remote power cycling of chiller  Chiller now on UPS-backed mains  How to make it remote power-cyclable ? Power Relay switch (Default closed) LAN-controlled mains sockets Solution 2 (no UPS backup) Solution 2 (no UPS backup) Solution 1 (with UPS backup) Solution 1 (with UPS backup) Where can we find one in RA43 ?