ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the alignment tolerance test on 1 st transmitter board Complete transmitter testing on 2 nd board with connectorized components on both design Complete the final report Progress to date: Planned Work: Return all the hardware components to Dr. Brooke Complete and turn in the course survey
Final Board Layout Receiver board Tx board design 1 Tx board design 2
Improved First Tx board Patch Cord, our ReceiverPatch Cord, Receiver box 100m fiber, our Receiver 100m fiber, Receiver box
Second Tx board Testing Patch cord, our Receiver Patch cord, Receiver box 100m fiber, our Receiver100m fiber, Receiver box
Have a great time in this class Good luck on your other finals !