SPP Presentation. Recommendation Status Update Ty Mitchell Entergy Stakeholders Meeting August 22, 2006 Houston, TX.

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

OpalisRobot™ Demonstration Actual Run Book Procedure Actual Data center Run Book Procedure documenting for Level 1 staff how to both VERIFY.
OASIS Subcommittee Status EC Meeting 2/18/14. Preemption and Competition Annual Plan Items Affected 2013 AP Item 2(a) Develop version 2 business practice.
EC Meeting 2/24/ AP Item 7(b) Modify NAESB standards WEQ , WEQ , and related standards to be consistent with the Commission’s policy.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, August 26, :00 to 3:00 p.m. EDT.
Configuration Management Managing Change. Points to Ponder Which is more important?  stability  progress Why is change potentially dangerous?
Root Cause Analysis Procedure (IMSP525) Training
Software Configuration Management Speaker: Jerry Gao Ph.D. San Jose State University URL:
Lab/Sessional -CSE-374. SYSTEM DEVELOPMENT LIFE CYCLE.
Task Management System Client xx Team Member 1 Member 2 Member 3 This is not a real project, but a student project carried out for a system requirements.
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Fusion GPS Externalization Pilot Training 1/5/2011 Lydia M. Naylor Research Lead.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
1 iBizBuilder from ClearPath Welcome to the ClearPath Networks iBizaBuilder online Tool! This innovative tool will be an online source for automating your.
Transaction Processing Systems and System Development Life Cycle
LBTO IssueTrak User’s Manual Norm Cushing version 1.3 August 8th, 2007.
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
Market Coordination Team Update to RMS.  MCT Kick-off Meeting Update… –1 st MCT Meeting was held on 3/2 (Austin) Twenty five people were in attendance.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, May 13th, :00 to 3:00 p.m. EDT.
UCB SA-NV SAP TEAM EURO Information Session 17th November
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Standards Review Subcommittee Update November 2007 – January 2008 February 5, 2008.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Agile Concepts - II “Agile” Estimating & Planning Nupul Kukreja 5 th November, 2014.
Monitor & Control Risks 1 MEC-4. What is Monitoring & Controlling Risks? 2 » Monitoring & Controlling Risks is the process of: implementing Risk Response.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
AFC METHODOLOGY EMS USER GROUP SEP 12, 2004 AFC – New Developments EMS USER GROUP Sep
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
Standards Review Subcommittee Update August 17, 2010.
Joint Electric Scheduling Subcommittee Update October 29, 2013.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
Worldwide Protein Data Bank Common D&A Project Sequence Processing Modular Demo May 6, 2010 Project Deliverable.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
Monitor & Control Risks 1 MEC-4. What is Monitoring & Controlling Risks? 2 » Monitoring & Controlling Risks is the process of: implementing Risk Response.
ESI/SPP Seams Agreement Implementation Update Transmission Planning Summit August 11, 2010.
Revisions to original presentation are in "Red"1 Available Flow-gate Capacity Stakeholder Kickoff Meeting January 19, 2005.
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
SPP.org 1. ICT Working Groups Current Activities Jody Holland Dowell Hudson Antoine Lucas Tim Phillips.
Duke Energy Carolinas Transition to AFC Methodology Stakeholder Meeting Independent Entity Services Thursday, March 17, :00 to 3:00 p.m. EDT.
Entergy AFC Stakeholder Meeting March 9, 2005 Houston, TX.
Sprint 113 Review / Sprint 114 Planning August 12th, 2013.
Systems Analysis & Design
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Retail Market Subcommittee Update to TAC May 6, 2004.
Public Libraries Survey Data File Overview. What We’ll Talk About PLS: Public Libraries Survey State level data Public library data (Administrative Entities)
Public Libraries Survey Data File Overview. 2 What We’ll Talk About PLS: Public Library Survey State level data Public library data (Administrative Entities)
#WEEK 3: RELIABILITY-TEST DOCUMENTATION AND OTHER ITEMS NEEDED FOR RELIABILITY TESTING 2 August 2006.
Software Engineering Lecture 9: Configuration Management.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
The Committee will: Assess and report on technology resources, status and needs. Create concept papers in support of strategic directions approved by.
FESHM Updating Automating the Process. Workflow stages by name Length of time in each stage Approved4 years and 6 months Under Revision6 months, reminders.
Software Configuration Management
Software Configuration Management
Path Operator Implementation Task Force
Project Charter General Information Project Title Date
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
Coordinate Operations Standard
The Troubleshooting theory
Presentation transcript:

SPP Presentation

Recommendation Status Update Ty Mitchell Entergy Stakeholders Meeting August 22, 2006 Houston, TX

 SPP reviewed Software bug that caused the August 19, 2005 reservation issue.  SPP was satisfied that problem was resolved and will not occur in future.  No further recommendations 1. Revisit Software Patch

 First update for the AFC manual Includes:  Operating, Planning, and Study Horizon modeling assumptions stated in the AFC Audit report.  Base flow assumptions for modeling inputs  Explanation for the differences between the OASIS outage postings and the outages found in the posted models.  AFC Manual Updates will be an on going process. 2. Assumptions for the AFC Manual

 AREVA updates to insure correct processing of TSRs  Manual QC check is currently being used  Updates received 7/14/06 for implementation by 8/1/06  During testing problems were found delaying implementation  Entergy is waiting for AREVA’s review and date for receiving fix 3. Further Automation of the TSR Process

 Entergy has converted from HRM, used for trouble shooting tickets, to Remedy, a true change management software.  Remedy:  Has role based access allowing authorized users to approve/deny work request.  Provides a more controlled environment with proper electronic approvals and task sequencing 4. QC Process Enhancements with Remedy

5. Data Exchange with 1 st Tier Areas  Processes and enhancement updates to processes for the exchange of data with neighboring entities and coordination with first tier control areas

6. Base Case Overloads  Base case overloads have not been addressed due to the LPSC docket on base case overloads.  Offline action item to determine the time requirement for an engineer to run a redispatch on a monthly model to alleviate base case overloads.  Powerworld optimal powerflow analysis tool to run a redispatch.  Inserted Gen date such as cost and heat rate info.  Setup flowgates  DC Approximation to solve  Analysis did not alleviate all base case overloads

7. Last Good Solution Method  Entergy has performed a proof of concept of design for new enhancements and rules and presented it to the Stakeholders.  Entergy also developed a functional design document to implement an application to monitor and notify the Powerflow solution of RFCALC.  The work on the application has been delayed due to the lead developer along with several other developers leaving the company.  Entergy is working on resources and will provide an assessment on expected implementation.

8. OASIS Posting Enhancements  Subsystem files coincident to operating/planning horizons models  Outage postings.  Newly proposed additions to the list:  Dating Participation Factor files for tracking purposes  Posting of a translation table that matches all names and IDs in models.

9. Over Generation  Has not been an issue  Input?

10. Negative Generation  Long term resolution  Entergy working on final design document for AREVA  Need input from all Stakeholders  Written comments needed  Short term resolution  New developments will be discussed as one of the main meeting topics on todays agenda