GEOPAK for Construction. Instructors Kevin Vollet (573) 526-5176 Bill Politte (573) 526-4447 Alexa Mitchell(573) 751-6591.

Slides:



Advertisements
Similar presentations
TcpScancyr for Tunnels
Advertisements

Roadway Intersection Design In GEOPAK Site
New Design Tools GEOPAK Site V8.5 Michael Gilham Bentley Civil Michael Gilham Bentley Civil.
MicroStation Update 2013 Replacement of the Settings Manager.
CREATING A GRADING MODEL FROM START TO END By Jim Schneider.
SLOPE.
Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer.
REVIEW - EARTH WORK Fall STEPS FOR EARTH WORK COMPUTATION Define Typical Cross Section Apply Typical Cross Section: Every Station Station at pluses.
GEOPAK Road For Bridge Chapter 5.7 COGO Bridge Deck Elevation Commands.
GeoPak Ver Update New Criteria Enhancements since last year. Using Backslope Override and the Backslope Constraint Line(BCL)
what is VA? advantages tools a b c what is VA? advantages tools fully integrated architectural plug-in for Rhino 4 powerful feature-based editor to create.
GEOPAK Bridge. Instructors Steve Atkinson Bill Politte Kevin Vollet (573) (573) (573)
GEOPAK Road For Final Bridge Design. Instructors Paul Boenisch Alexa Mitchell.
Superelevation. Shaping Shaping is the process of placing complex shapes into a design file to represent an area of pavement slope. Shapes can be either.
© 2008 Bentley Systems, Incorporated GEOPAK Corridor Modeling Derricke Gray GEOPAK Product Manager.
Greater Atlanta Job Fair A Volunteer’s Guide to the Job Fair.
Moving to Civil V8i Select Series 3 Robert Garrett.
Quiz 1. Quiz 1 Answers 1.Coordinate geometry elements are stored in a..GPK files. b..INP files. c..IOC files. d..OOC files.
Presented By: Chuck Lawson, PE Paving the Way for Roadway Designer in GEOPAK V8 i (SELECTseries 1)
WHATIFCOURSE INTRODUCTION. Schedule Begin 9:30 am, end around 6 pm Lunch around 12:30 pm every 2 hour break short lectures end of course Thursday evening.
Tutorial: Drawings Chapter 2. Choose a Paper Size/Format Leave Unchecked for Plain Sheet INTRODUCTION TO SOLID MODELING USING SOLIDWORKS 2009.
Data Input How do I transfer the paper map data and attribute data to a format that is usable by the GIS software? Data input involves both locational.
My Trip To The. We will drive to the Curious Kids’ Museum.
Please open your laptops, log in to the MyMathLab course web site, and open Quiz 3.1 IMPORTANT NOTE: If you have time left on your quiz clock after you.
GEOPAK Corridor Modeling
My Trip To The. We will drive to the Center for Children and Families.
Please open your laptops, log in to the MyMathLab course web site, and open Quiz 3.3/4 IMPORTANT NOTE: If you have time left you finish this quiz, use.
GEOPAK 8.8/XM/Athens Review Derricke Gray GEOPAK Product Manager.
© 2005 Autodesk 1 Autodesk Civil 3D – WW Education AutoCAD Civil 3D 2008 “How Do I…?” Sanjay Asnani, PE.
Developing Effective Reports
ELECTRONIC DESIGN DATA MANAGEMENT. Directory Structure (GEOPAK Road Manual Chapters 1 & 2) MicroStation/GEOPAK files are stored in the t drive under t:\de-proj\county_designation\jobnumber.
IGrds Public Domain Enhancements.  The purpose of this minor enhancement is to upgrade the existing IGrds SDMS processes that import and export Geometry,
BME506 Pro/E Applications For BME Instructor: Xiangying Chen, Ph.D Dept. of Biomedical Engineering University of Miami.
Design Development Drawings 1. Code analysis: examine needed changes 2. Draw accurate existing plans/model 3. Indicate demolition 4. Indicate new wall.
Start Job. Purpose Creates File Directory Structure for the Project Copies MicroStation Default Files and Sets their Global Origin Copies and Renames.
My Trip To The. We will drive to the Center for Children and Families.
1 TEISS Case Project Introduction Melinda Ronca-Battista and Angelique Luedeker ITEP/TAMS Center.
ODOT Consultant Meeting, July 13, 2015
ROADWAY GEOMETRIC DESIGN Instructors: Alexa Mitchell Kevin Vollet
Superelevation. Shaping Shaping is the process of placing complex shapes into a design file to represent an area of pavement slope. Shapes can be either.
© 2008 Bentley Systems, Incorporated GEOPAK Corridor Modeling Midwest DOT Roundtable October 21, 2008 Kansas City, MO.
GEOPAK Road For Preliminary Bridge Design. Instructors Steve Atkinson Bill Politte Kevin Vollet Chris Schwandtner (573) (573) (573)
© 2012 Bentley Systems, Incorporated Moving to Civil V8i Select Series 3 Robert Garrett, Bentley Systems Inc. Product Manager.
Presented By: Weidong WU, Ph.D. Date: Part I Creating a Revolved Part 1. Start Pro/E wildfire. 2. File  set working directory…  Your directory.
Presented by: Chuck Lawson, PE Roadway Designer and Machine Control – What You Need to Know.
© 2014 Bentley Systems, Incorporated Templates 202 Presented by: Chuck Lawson, PE Bentley Systems, Inc.
GEOPAK Corridor Modeling Roadway Designer. File Names dtm - This is the Digital Terrain Model in the InRoads format, a DTM includes stringlines representing.
GEOPAK Corridor Modeling Derricke Gray, GEOPAK Product Manager.
Earthwork & Volumes Spec Requirements End Areas End-area Volumes
© 2009 Bentley Systems, Incorporated Thomas Taylor, Bentley Civil IP-8 Advanced Geometry for InRoads V8i Users.
© 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Roadway Designer - Completing Your Project.
© 2009 Bentley Systems, Incorporated Earthworks for InRoads V8i.
Geopak for MoDOT Right of Way & Location Survey Plans.
PLEASE USE THE ENTER KEY OR RIGHT CLICK ON THE MOUSE TO ADVANCE.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 12 Earthwork.
Introduction to AutoCAD and Civil 3D Justin Bonnema, PE USDA-NRCS ANMT Brookings, SD.
Introduction U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
SURVEYING FOR INSPECTORS. Course Content Introduction Chapter 1 – Chapter 1 – Field Equipment Chapter 2 – Chapter 2 – Location Survey Chapter 3 – Chapter.
Learning Objectives Understand the concept of floor. Create floors using the Floor tool. Create roofs using the Roof tool. Use the shape editing tools.
TcpTunnel.
Learning Objectives • Add drawing sheets to a project using the Sheet tool. • Add views to the drawing sheet. • Modify view properties of the drawing sheet.
Practice converting linear equations into Slope-Intercept Form
Greater Atlanta Job Fair
Sketching.
Graphing Linear Functions
SharePoint Foundation 2010
Course Schedule Day 1 Day 2 8:00 AM - 9:30 AM 9:30 AM - 9:45 AM
Course Schedule Day 1 Day 2 8:00 AM - 9:30 AM 9:30 AM - 9:45 AM
Course Schedule Day 1 Day 2 8:00 AM - 9:30 AM 9:30 AM - 9:45 AM
Aim: Full House Grid: 9 Grid Play: Calculate answer & cross it off
Presentation transcript:

GEOPAK for Construction

Instructors Kevin Vollet (573) Bill Politte (573) Alexa Mitchell(573)

Facilities Restrooms at either end of hallway Break room at “upper” end of hallway Coffee & refrigerator through the door to left Parking – Parking out front – Adjacent lots – MoDOT cars can use Garage

Schedule Begin at 8:00 a.m. Go until 3:30 p.m. +/- 1 hour lunch – 11:30 a.m. +/- Finish Thursday mid-day

Class Overview Introduction to GEOPAK (Introduction) – Starting GEOPAK – Setting Up User Preferences Setting up a new GEOPAK Job – Start Job (Chapter 1 & 2) Accessing an Existing Project – Project Manager (Chapter 3) Coordinate Geometry (COGO) – Coordinate Geometry Dialog (Chapter 4)

Class Overview XS Navigator (Chapter 5) – Navigation Tools – Draw Tools Extracting Plan Graphics (Chapter 6) – Storing Points, Chains Superelevation (Chapter 7) – Design Process – Input Files – Transition Section Seeding Calculations (Chapter 8)

Class Overview Plan View Labeler (Chapter 9) – Point Elements – Linear Elements Earthwork (Chapter 10) – Class A Excavation DP Station and Offset / Draw Transition(Chapter 11) Cross Section Reports (Chapter 12) – Slope Stake Report – WSPro Report Converting report to an easy to read format

Class Overview Exporting Chain & Profile information to Carlson (Chapter 13) XS Sheets (Chapter 14) – Class A Excavation

Directory Structure T:\de-proj\Carter# – # - user number on top of screen User1Carter01 User2Carter02 User3Carter03 User4Carter04 User5Carter05 User6Carter06 User7Carter07 User8Carter08 User9Carter09 User10Carter10 User11Carter11 User12Carter12 User13Carter13 User14Carter14 User15Carter15

GEOPAK Road 1