UNIVERSAL M. ENTP. www. affordablehousing. ug AFFORDABLE HOUSING & MUCH MORE JAN 01 – JAN 15.

Slides:



Advertisements
Similar presentations
“Bedding the Natural Choice”. Agenda What do we do and what is our background Duvet, Pillow and Mattress Topper Construction & Fabrics Natural Fibres.
Advertisements

Xing Zhang Yifan Zhang Fan Yang.  A Large-scale Coal Mine locates at this area.  The problem of subsidence here is quite serious.  Use TRANSIENT.
Measurement for Civil Engineering works
The Springs Apartment Homes Located at Expressway Islamabad Near Fazaia Colony Exclusively marketed by.
1 Sikandar Iqbal Graduate Trainee Engineer Civil Engineering Township Comparison & Analysis of Township Buildings.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
Tunnelling Across a River Using Immersed Tube Tunnelling Click through the slide show to see key stages in creating a tunnel across a river using Immersed.
Chapter 3 Measuring Excavation and Sitework
Foundations and basements
Foundation Systems.
Numbers
SOCIAL STUDIES Geography SOCIAL STUDIES Unit 2 Where People Start Communities.
Phase Difference = Phase Difference = 0.05.
CAMPAN VALLEY RESIDENTIAL LAYOUT PROJECT PHOTOS-FEBRUARY 15 th 2015.
1 Pertemuan 07 GEOTEKNIK Matakuliah: S0182/Studi Kasus Dalam Teknik Sipil Tahun: Juli 2005 Versi: 01/01.
Floor Systems and Foundation Support
October 19, 2009 Multi-Purpose Student Center Aerial Photograph view from northeast.
Chapter 2b Foundations Shallow & Deep Foundations.
School Building ready for Slab casting.. View of the Children's Home.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
DEVIKULUM Community Hall Project Progress to Date 2-May-2011.
Ronan Point Collapse Group 1: Gareth Nolan James O’Brien Jennie Quigley Laura Woodbyrne.
Actual Site Photo Price List Type Of VillasSuper AreaC.L.P 2 bhk (100 sq.yard)1050(sq.feet) bhk (200 sq.yard)1550(sq.feet) At.
Foundation Loads Dead Load Live Load Wind Load
Locrete Palestine Mr. Fahim Kasis, Managing Director Locrete Industries.
AFFORDABLE HOUSING & MUCH MORE
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
BUILDING CONSTRUCTION
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
Bingo
Sardar Patel Institute Of Technology
Wrong installation of window frame Wrong installation of window frame.
Residential Wall Systems
Termiticide: Method of Application
AARNA Progress Report-January 2017
Progress Charts.
AARNA Progress Report-June 2017
Residential Wall Systems
WELCOME.
نتعارف لنتألف في التعارف تألف (( الأرواح جنود مجندة , ماتعارف منها أئتلف , وماتنافر منها اختلف )) نماذج من العبارات الايجابية.
Yahoo Mail Customer Support Number
Find Best Affordable Movers And Packers in Singapore.
TECHjOSH.COM TechJosh.com.
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
Fossils: Tales from the Past
استاد راهنما : طراحی معماری 5 مجتمع مسکونی توسط: استاد راهنما :
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
How to perform Time Impact Analysis / Window Analysis in Primavera P6
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
SITE PICTURES AND PROGRESS
Residential Wall Systems
Residential Wall Systems
אביבה אלקלעי, ראש היחידה לכניסה להוראה, המכללה האקדמית אחווה
מהו הסטאז'? המכללה האקדמית תלפיות.
Pier Foundations Piers Suspended floor Ground beam Next slide.
THANK YOU!.
New York City Housing Development Corporation
Concrete A structural material made by combining cement, sand, aggregate, and water.
Thank you.
Thank you.

Presentation transcript:

UNIVERSAL M. ENTP. www. affordablehousing. ug AFFORDABLE HOUSING & MUCH MORE JAN 01 – JAN 15

JUPITER APARTMENTS – PHASE 02 NAJJERA 1BED & 2 BED APARTMENTS – TOTAL 40 UNITS

JUPITER APARTMENTS PHASE 2

REINFORCEMENT FOR COLUMN & FOOTINGS

EXCAVATION FOR BOTH BUILDINGS COMPLETE FOOTINGS BEING CAST ON SITE

EXCAVATION FOR BOTH BUILDINGS COMPLETE

FOOTINGS FOR COLUMNS

SITE WORK STARTED FOR JUPITER – PHASE 02 BACK FILLING OF EARTH

SETTING OUT COMPLETED ON SITE

BACK FILLING OF EARTH

EXCAVATION FOR BOTH BUILDINGS COMPLETE

EXCAVATION UNDER PROGRESS PLINTH WALL CONSTRUCTION IN PROGRESS

WORK FOR BOTH BUILDINGS UNDER PROGRESS

PLINTH WALL CONSTRUCTION IN PROGRESS

EXCAVATION UNDER PROGRESS

WORK FOR BOTH BUILDINGS UNDER PROGRESS PLINTH WALL CONSTRUCTION IN PROGRESS

THANK YOU www. affordablehousing. ug