MMIRS Status A.Szentgyorgyi/SAO 30 April 2005. Imaging 7 x 7 arcmin FOV 0.2 arcsec pixels Y,J,H & K wavelength coverage Spectroscopy Multislit (4’ x 7’)

Slides:



Advertisements
Similar presentations
MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
Advertisements

LBT AO Progress Meeting, Arcetri Walter Seifert (ZAH, LSW) The LBT AO System and LUCIFER 1.Requirements for the commissioning of LUCIFER:
All these Sky Pixels Are Yours The evolution of telescopes and CCD Arrays: The Coming Data Nightmare.
All these Sky Pixels Are Yours The evolution of telescopes and CCD Arrays: The Coming Data Nightmare.
MMT Megacam Brian McLeod Smithsonian Astrophysical Observatory.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
PTF / MOSAIC status R. Dekany January 31, Palomar Transient Factory P48 as transient discovery engine –New, wide-field visible imager (MOSAIC) –New.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
PALM Project Jan COO All-Hands Mtg. Project 1640 is an infrared, coronographic integral-field spectrograph for high-contrast companion.
PalSpec Status Review1 PalSpec Status Review WITH NOTES RE KECK APPLICATION Terry Herter, Chuck Henderson (Cornell) John Wilson, Mike Skrutskie.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
KMOS Instrument Science Team Review Instrument overview.
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
MOIRCS and FMOS for cluster studies Ichi Tanaka Astronomical Institute, Tohoku University MOIRCS and FMOS for cluster studies.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
The Mid-Infrared Instrument (MIRI) Medium Resolution Spectrometer for JWST Martyn Wells MIRI EC & UKATC.
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
Telescope Integration and Tests Tuesday Afternoon.
Mid-InfRAred Camera wo LEns (MIRACLE) for SPICA Takehiko Wada and team MIRACLE.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
MIRI Optical System CDR, 6 th & 7 th December 2006 Mid InfraRed Instrument 07-1 Optical System Critical Design Review (CDR) TIPS Presentation: Margaret.
The FMOS Facility for the SUBARU telescope Gavin Dalton Oxford/RAL.
The Prime Focus Imaging Spectrograph Design and Capabilities
Current Status of SPICA FPI Mechanical I/F & resources April 6 th 2010 Hideo Matsuhara (ISAS/JAXA) & FPI team.
Test Readiness Review 23 October 2003 CRAL - LYON.
Oct 26, 2007SALT Workshop UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Science Rationale Modes –Fabry-Perot Spectral Imaging –Grating Spectroscopy;
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Binospec - Next Generation Optical Spectrograph for the MMT
Magellan Planet Finder Spectrograph Jeff Crane (OCIW) Steve Shectman (OCIW) Paul Butler (DTM)
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
The INS NIRCam Team.
1 Transiting Exoplanet Survey Satellite Daryl Swade Archive Team Meeting June 16, 2014.
Astronomical Observational Techniques and Instrumentation
Oct 17, 2001SALT PFIS Preliminary Design Review1 Operation Concepts Definition Document (OCDD) Chip Kobulnicky University of Wisconsin.
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
The Prime Focus Imaging Spectrograph for the Southern African Large Telescope: Operational Modes Chip Kobulnicky – Instrument Scientist, University of.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Integral Field Spectrograph Eric Prieto LAM. How to do 3D spectroscopy.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J

MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
COSMOS Status David Sprayberry, Sean Points & Jay Elias
An IFU slicer spectrometer for SNAP
LSST Camera Detector Status
ECAL electronics schedule
Brian McLeod Smithsonian Astrophysical Observatory


Overview Instrument Role Science Niches Consortium science
SLAC DOE Program Review

MIRI Observing Templates
Astronomical Observational Techniques and Instrumentation
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

CMX scope and functionalities

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
The Image The pixels in the image The mask The resulting image 255 X
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
star 2004 june 26 nelson, Na footprints Zenith, 90 km Na layer
Presentation transcript:

MMIRS Status A.Szentgyorgyi/SAO 30 April 2005

Imaging 7 x 7 arcmin FOV 0.2 arcsec pixels Y,J,H & K wavelength coverage Spectroscopy Multislit (4’ x 7’) or longslit (7’) R = 3000 J+H, R = 1400 “Enhanced” Flamingos design Overview

Hawaii-2 2k x 2k focal plane Two-dewar design to allow slit mask exchange during the day

OVERALL ELECTRONIC CONTROLLER DIAGRAM IR controller architecture is an extension of successful John Geary’s CCD controller design for MMT in use for all SAO MMT instrumentation.

MMIRS Controller Prototype

MMIRS Focal Plane Layout

SWIRC Now Facility MMT with Full 32 Channel Readout

MMIRS Liposuction Weight of MMIRS now ~3500 lb., so can be handled with crane in Clay dome.

MMIRS Project Milestones May 2005Critical Design Review/Optics Fab Commences Jun 2005Commence Fabrication & Assembly Oct 2005 Start Focal Plane Cryo Testing Nov 2005Start System Integration Dec 2005Receive optics July 2006Start System Functional Test Oct 2006Ship to MMT Feb 2007(?) Available for Magellan First Light (TBD)

Lift Fixture

Software

Electronics

Project Status