Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Capacity Valuation.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
ERCOT PUBLIC 10/21/ LTSA Scenario Results Update October, 2014.
ERCOT PUBLIC 7/22/ LTSA Scenario Results July, 2014.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
ERCOT PUBLIC 2/14/ LTSA Scenario and Data Assumptions February 14, 2014.
ERCOT PUBLIC 3/25/ LTSA Scenario and Data Assumptions March 25, 2014.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Value and Cost of Distributed Generation ACC Staff Workshop #1 – May 7, 2014 Docket No. E-00000J DG Valuation ─ Lessons from the APS Distributed.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
ENERGY MARKET PERSPECTIVE
ERCOT PUBLIC 6/17/ LTSA Scenario Results June, 2014.
Long Term Study Scenarios and Generation Expansion Update December 7, 2012.
Renewable Energy Project Economics, Policy and Incentives NARUC Staff Subcommittee on Accounting and Finance October 8, 2007 Dr. Lola Infante Manager,
Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
ENERGY POLICY OF EU AND INFLUENCE ON SEE ELECTRICITY MARKET Dragan Vlaisavljevic, Februar 2015.
Avoided Costs of Generation
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  Summary of first LTSA Workshop  Topics and Speakers.
PRESENTED TO PRESENTED BY Scenario Development Stakeholder Workshop # ERCOT Long Term System Assessment Drivers and Draft Scenarios Developed by.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
ERCOT PUBLIC 7/14/ Model Data Assumptions Doug Murray ERCOT Sr. Planning Analyst LTSA Scenario Development Workshop July 14, 2015.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation.
© Copyright 2013, First Solar, Inc. Establishing Accurate Power Generation Cost Assumptions for ERCOT Planning Colin Meehan – Director, Regulatory and.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
American Wind Energy Association Wind in The Portfolio Mike Jacobs American Wind Energy Association Managing Your Energy Portfolio in a Greener World January.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Long Term Study Transmission Results May 21 st, 2013.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
ERCOT – MISO DC Tie Study Comments
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
ERCOT PUBLIC 5/20/ LTSA Current Trends Scenario Results May 20,2014.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
Forecasting Power System Hourly Load and Emissions for Air Quality Modeling ERTAC-EGU Model Development Group – Webinar & Outreach slides Robert.
LTSA Scenario Development Workshop
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Presentation transcript:

Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013

2 Study Findings Lessons Learned Discussion of Future Long Term System Assessment (LTSA) Resource Expansion Methodology Topics of Discussion

3 Scenario Summary: 2032 Annual Generation Shares by Fuel (Existing and Expansion Capacity) May, 2013 The BAU w/ Increased DC Tie Capacity scenario exceeds 100% of ERCOT needs because additional generation was produced and exported to outside markets. As increasing amounts of wind, solar and geothermal prove to be economical, the amount of energy provided by renewables increased from 13% in the BAU w/ Retirements scenario to 63% in the Environmental Scenario.

4 Study Findings The scenarios analyzed in this study are only a few of the potential options that can be studied, however we have captured a range of potential future renewable generation expansion plans within these scenarios Natural gas price is a main driver for what generation gets built Wind and solar are economic resources in many scenarios Higher capacity factor wind units are economic without PTC –Better wind turbine technology assumption in wind data for future units Continuation of PTC is crucial for large wind penetration –For example, the BAU with PTC scenario results in 6,500 MW more wind build than BAU New Wind Shapes scenario where the only difference in the two scenarios is the PTC Solar is economic past 2022 –Capital costs are assumed to decline up to 2022 due to technological advancement May, 2013

5 Study Findings Reserve Margin (RM) and scarcity hours do not have a direct relationship –RM calculations based on existing ELCC of 8.7% for wind and assumed ELCC of 50% for solar As intermittent generation increases, operational reliability becomes a concern –System ramp rate considerations –Online inertia May, 2013

6 Lessons Learned Strengths –Iterative approach to determine most economic resource portfolio –First study by ERCOT to analyze generation economics to understand what future resources need to be considered when planning for transmission Opportunities for Improvement –Natural Gas fuel price forecast was limited to EIA Reference with low and high bands; a stochastic approach on any one scenario may provide additional understanding of natural gas price impacts to various technologies –Capital costs and O&M costs were nationwide values from EIA; do not reflect Texas specific costs  possible understatement of O&M costs due to prolonged operation to meet summer demand –Utilize KERMIT results of ancillary service requirements on the impacts to resource economics May, 2013

7 Discussion of Future LTSA Resource Expansion Methodology When planning for the next LTSA, these are some items that should be considered: –How can we use this process in future studies? –How can we improve the process? –What future considerations should be taken into account? –What questions does ERCOT need to answer? May, 2013

8 Questions??? If you have any questions or comments please contact us at: Jenell Katheiser Doug Murray May, 2013

9 Appendix May, 2013

10 BAU with all Tech January 22, 2013

11 BAU with Retirements January 22, 2013

12 BAU with updated wind shapes January 22, 2013

13 Environmental with DR/EE January 22, 2013

14 Drought January 22, 2013

15 Drought (Low NG price) January 22, 2013

16 Drought (Emissions and PTC) January 22, 2013

17 BAU with PTC January 22, 2013

18 BAU with High Natural Gas prices January 22, 2013

19 Environmental January 22, 2013

20 BAU with Increased DC Tie Capacity May, 2013