Saturday 17.4. ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
LBOC11-Oct-2011CERNMassimiliano Ferro-Luzzi 1 LHC Physics Programme  what's left ?
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
● Main goals for week 33: – Luminosity production; – First 150 ns bunch train attempts; – Roman Pots: check movement at 3.5 TeV, with 1b; – Off momentum.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
1) orbit reponse measurements indicated no obvious BPM polarity errors (Kajetan) 2) confirmed consistency between synchronous and IIR- based orbit estimates.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
LHC Status Fri Morning 3-June
MD Planning Fri – Sat (26. – 27.8.)
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Status of LHC Operations
Monday 6th August & night
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC Status Sun Morning 20-Mai
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Monday Morning – recovery from cryo.
Monday February 28th 8h00: Injection
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Friday Morning 7:30 injection for fill 2908
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday :20 beta beat corrections during squeeze for flat machine finished Afterwards fixing issues at injection: BPM rephrasing for B2 solved.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Summary for LPC (March 7th, Ralph Assmann)
Summary Tuesday h23: Machine closed. Precycle started.
LHC Status Fro Morning 9-Sep
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Monday 10th December - morning
Wednesday morning Waiting for PS – problem on RF cavity.
31/3/2010 Difficult day… but at the end stable beams.
Saturday 26 November 2011.
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40: Start squeeze in IR 1 & IR5: –  * = 2m reached at 17:10  ca. 30 minutes total for squeeze ● 17:30: Start squeeze in IR8: –  * = 2m reached at 17:55  ca. 25 minutes total for squeeze –  -beat correction using ‘knobs’ for Q5 and Q6 adjustments done via settings. ● 18:05: Start squeeze in IR2: – 18:30: Reached  * = 5m but encountered large losses for Beam2 (only a couple 10E9 left). Large coupling after trip of RQS.A78B2  the horizontal tune crossed the 1/3 resonance. Caused by too high dV/dt in function settings. 1

Saturday ● 19:30:  -beat measurements: –  * = 5m: not sufficient intensity for Beam2 but good measurement for Beam1  20% to 30%? –  * = 3m: 20%-30%  -beating for Beam1. – RQS.A78B2 tripped again during squeeze to  * = 3m. –  * = 2m: 20%-30%  -beating for Beam1. – change of  –beat during squeeze is small! – local coupling correction ● 20:00: finished  -beat measurements: ● 23:30: Preliminary studies for TCD adjustments with Beam1 only ● 01:00: Preparing new fill for the night – invalid time problem for RQTF circuits of Beam2 (loading of settings). ● 06:00: Start lumi scans. ● 06:45: Beam dumped: – again COD SIS? 2

Saturday ●  -beat for Beam1 at   = 2m in IR2 (all other IPS at   = 2m): 3

Saturday ● Coupling for Beam1 at   = 2m in IR2 (all other IPS at   = 2m): 4

Saturday ● Coupling correction for Beam1 at   = 2m in IR2 : 5

Saturday ● Coupling correction for Beam1 at   = 2m in IR8 : 6

Saturday ● Losses during AC dipole measurements (  * = 3m in IP2): 7

Sunday ● Day: – Stable beam physics fill. – Repeat optics squeeze. –  -beat measurement and correction. – Optics and orbit measurements and corrections. – IP steering. – Adjustment of tertiary collimators. ● Night: – Physics fill for the night. ● Monday: – Repeat ramp and squeeze procedure. – End of fill studies for establishing ‘stable beam’ conditions with squeezed optics. – Damper studies 8