Technical Support 2008 1 12/5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.

Slides:



Advertisements
Similar presentations
Technical Support /23/08 PHENIX WEEKLY PLANNING 10/23/2008 Don Lynch.
Advertisements

Technical Support /18/08 PHENIX WEEKLY PLANNING 12/18/2008 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
1 9/3/2009 PHENIX WEEKLY PLANNING 9/3/2009 Don Lynch.
Technical Support /13/08 PHENIX WEEKLY PLANNING 11/13/2008 Don Lynch.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
1 3/12/2009 PHENIX WEEKLY PLANNING 3/12/2009 Don Lynch.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
1 1/22/2009 PHENIX WEEKLY PLANNING 1/22/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
Technical Support /11/08 PHENIX WEEKLY PLANNING 12/11/2008 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
1 2/26/2009 PHENIX WEEKLY PLANNING 2/26/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
Technical Support /30/08 PHENIX WEEKLY PLANNING 10/30/2008 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
1 1/8/2009 PHENIX WEEKLY PLANNING 1/8/2009 Don Lynch.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
1 8/27/2009 PHENIX WEEKLY PLANNING 8/27/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/30/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
1 7/16/2009 PHENIX WEEKLY PLANNING 7/16/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 8/20/2009 PHENIX WEEKLY PLANNING 8/20/2009 Don Lynch.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch

Technical Support /5/08 October November December January Run Position 10/20 – 10/31 (CM & MMS moved north WC west) Station 1 south access 11/3-12/12 (MMS moved south WC west) Station 1 north access 12/15-12/31 (CM moved south, WC west) East Carriage Install 1/2-1/15 (CM moved north, EC & WC opt.) Run Position 1/16-1/19 (MMS moved north, EC & WC opt) Ready for run 9 1/19-2/1 (MuID Collars Installed, EC & WC opt.) IR Configuration for remainder of shutdown

Technical Support /5/08 October November December January Station 1 south access 11/3-12/12 (MMS moved south WC west) HBD Installation (west) /7 (east) 12/17-12/31 Install/test cards 10/2-11/30 sta 2&3 N and sta 1, 2 & 3 S Install Lead absorber 11/17-12/12 Install FEE S rack platform 11/17-11/26 And racks FEE S Cabling & Testing 11/24-12/12 MuTr sta 1 S Decaps 12/1-12/12 Shutdown ’08 Schedule

Technical Support /5/08 October November December January Station 1 north access 12/15-12/31 (CM moved south, WC west) Remove Sta 1 S 12/8-12/18 And Sta 2/3 N scaffolds Move CM south 12/17 Install MMS lampshade 12/18-12/21 Install MMN lampshades 12/18-12/31 Re-install MMN walk-over supports 12/22-12/31 and platforms Shutdown ’08 Schedule

Technical Support /5/08 October November December January East Carriage Install 1/2-1/15 (CM moved north, EC & WC opt.) Install EC 1/2-1/15 Run Position 1/16-1/19 (MMS moved north, EC & WC opt) Move MMS North 1/16 Ready for run 9 1/19-2/1 (MuID Collars Installed, EC & WC opt.) DC East/West Repairs 1/16-2/1 Install MuID Collars 1/19-1/21 Pink/Blue/White Sheets 1/16-2/1 Close Shield Wall 126-1/30 Cryo Start Up, Start Physics 2/1-2/18 Shutdown ’08 Schedule

Technical Support /5/08 October November December January Other On going Tasks Fan Tray Maintenance (fill in) RPC3 Prototype install (11/15-12/31) (including assembly at factory, Moving tunnel shielding, modify Crystal palace & vapor barrier, RPC3 install, rack, install scintillators,services & testing) RPC Factory Support Dark Current test stand Storage Racks with humid. Cntrl Prep for 2009 Shutdown (as time permits) Shutdown ’08 Schedule

Technical Support /5/08 October November December January Rack room electronics, etc. Build new storage 10/1-12/15 crates NCC prototype design support HBD support VTX fabrication tooling design VTX installation design FVTX design/engineering support As Required Shutdown ’08 Schedule

Technical Support /5/08 Shutdown ’08 Electrician Work *Run Power to new MuTrgr FEE racks on MMS. by 10/31 Wiring completed…temporary power to be provided for South FEE tests *Re-wire ToF Rack power distribution bucket in Gas Mixing House. This is to correct minor wiring errors. Done. Mixing house UPS’s installed need to be plugged in. *Walk down PHENIX Electrical Distribution Panels/Breakers and update changes on the electrical one- line drawings. Complete by ?. *Install power and signal cable tray (ceiling suspended) for new DCM rack row – north of existing DCM racks. To Be Scheduled *Assist in signal and LV cable installation for MuTr/RPC upgrades as necessary. Installation of RPC prototype rack needed..held up by tunnel shielding  held up by tunnel cran power  all to be resolved by end of next week *Repair Duct heaters for Control Room. Temporary 15 KW Heater installed. To be completed next week? *Upgrade power capacity of Central Magnet power distribution for future bridge rack loads. *Remove existing 15KVA transformer and install 45KVA unit. Lower priority; not required for run 9, to be scheduled when manpower available and operations & projects inconvenience are minimized

Technical Support /5/08 Roof leak in utility bathroom at northwest corner behind tech offices. Roof leak over door between rack room and assembly hall. Trailer bathroom slop sink (for Custodians). Heat wrap tape for trailer bathroom toilet drains to prevent freeze/clogging in winter. New duct heater (In progress) Improved Rack Room AC performance (In Progress) 1008 Building Maintenance Issues

Technical Support /5/08 MuTrigger South Rack Platform & racks installed, power hooked up cabling and rack cooling in progress Bridge water manifolds have been reworked…need to be reinstalled MuTrigger FEE South Rack Station 1 South Scaffold modified.. will remain in place until 12/12

Technical Support /5/08 RPC2&3 Prototype Rack Rack ready waiting for shielding to be re- stacked which is waiting for crane to be re- powered Power bridges across to Rack Cable tray runs on edge of pedestal floor to rack R

Technical Support /5/08 RPC3 Prototype Installation RPC3 prototype: mechanical installation is complete; services (gas, signal, electric), and environmental control installation is complete

Technical Support /5/08 RPC Absorber All Lead cut, painted and ready for installation

Technical Support /5/08  4 pairs of scintillation counters  each pair consists of 2 ~1” thick scintillators; active area ~ 2” x 2” ; Length ~10” with phototube and shielding; light guide cylinder ~ 1” dia. With 1” dia PMT’s; Weight is ~ 4 lb per pair.  TLD’s: Change and read weekly (quantity and location TBD)  To be positioned in South tunnel uniformly distributed around the beam pipe at approximately 3, 6, 9 and 12 O’clock at a radially convenient location which overlaps the RPC3 prototype  Z location is south of RPC3 as close as possible but at most 12” away (for the 3 O’clock pair, others to match z-position)  Detectors require 2.5 kV to be run from IR.  16 channel signal, also to be run from IR  Rack support is TBD RPC3 Prototype Installation: Scintillators

Technical Support /5/08 RPC3 Prototype scintillators

Technical Support /5/08 PC1 East Broken Wire Repair Planning is in progress

Technical Support /5/08 PC1 East Broken Wire Repair

Technical Support /5/08 PC1 East Broken Wire Repair

Technical Support /5/08 PC1 East Broken Wire Repair PC1 East Spare in Bldg 510

Technical Support /5/08 HBD Installation Schedule: West (Bill): 11/6 (Done) East (Ted): 12/4 (Done) Positioning, Cabling and commissioning to follow HBD The Prodigal detector returns! Let’s slaughter the fatted calf!

Technical Support /5/08 RPC Factory Support

Technical Support /5/08

Technical Support /5/08 RPC Factory Module and Gap Storage with humidity Control Burn-in test stand (bicycle rack) Tilt Tables (2) for Assembly and Handling Gaps modules and ½-octants Detail parts storage for Module and ½ octant structural parts

Technical Support /5/08 RPC Factory Dark Current Test Stand under construction Also working on: - a burn-in test stand for ½ octants - additional storage for gaps modules and structural detail parts - transport table/cart

Technical Support /5/08 Proposed Reorganization Relocated file & storage cabinets, & desk Added 2 DCM racks to east end of row 5 and 2 DCM racks to west end of row 5 Moved 2 large black racks from row 4 and added a third large black rack to row 2 Moved tall blue (open) rack from north end of row 2 to east end of row 3 and added another of the same to row 3

Technical Support /5/08 Scaffolding Crates New Crates for Sta 2/3N scaffolds and Sta. 1 scaffolds are in progress.

Towards St.2 Scaffold Disassembly & South Arm Installation RIKEN/RBRC Itaru Nakagawa

12/5/0828 Station-3, Octant-6 (Before)

12/5/0829 Noise Source ARCnet card ARCnet

12/5/0830 Station-3, Octant-6 (After)

12/5/0831 Current Noise Status (Station-3)

12/5/0832 Installation Check List (St.2&3) Miscabling –Visible inspection –Data consistency check (by running calibration) ADTX Performance –Slow control  –PROM Download –Efficiency  –Fake hit  –Timing  MuTR FEE Performance –Noise w/o HV off  (Some strips remain high) –Noise w/ HV on  –Gain  stereo ~ 1, non-stereo~0.9  LV –Miscabling  –LV measurement at Chassis with all other power on   In Progress

12/5/0833 December Schedule Platform Done Plumming Power SMT4 Install South Cabling LV test Optical chain test Final Test North Arm Board Test Noise Check Fake Hit, Calibration South Station-1 Scaffold Activity MuTRG MuTR decapacitation Absorber Install MuTR Decap. South St.1 Scaffold DisassemblyNorth Station-1 Access & Lampshade Close Tsutomu, Itaru -> Japan ADTX-FEE Cable install Board install Cable to Rack

12/5/0834 South Arm Installation Ran LV/Optical Cables (Uninstall after Run09) Found one dead trunk cable out of 36 Temporary power from Central magnet

12/5/0835 Infrastructures Power –Temporary power source from central magnet (Mike) Water pluming (Mike Lenz) LV (Steve, Frank) –Cabling –Distributor –Control GUI Optical (Steve) –BCLK fanout –PECL fanout

12/5/0836 To be done for Station-1 East West Thermocoupe not working Noisy Signal Cable Chassis-1, Cable-4 Lost communication w/ boards Reduce elevation of chassis Noisy Signal Cable Chassis-5, Cable-8 Noisy Signal Cable Chassis-1, Cable-8,16 Man Lift Noisy Signal Cable Chassis-1, Cable-6

Technical Support /5/08 Safety, Security, etc Site wide emergency drill sometime next week. If at PHENIX follow directions of Paul Giannotti (CAS Watch is our LEC, Paul is backup) Emergency Information website: Emergency Preparedness brochure: The office of Emergency Management will conduct a briefing Mon. Dec 8 at 11:00 AM in Berkner. Also webcast at

Technical Support /5/08 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: