Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October 2011 1.

Slides:



Advertisements
Similar presentations
LINAC4 and 3 MeV test stand at CERN
Advertisements

LINAC3 INSTRUMENTATION STATUS F.Roncarolo – 18 Feb 2015 F.Roncarolo 18 Feb
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
1 1. Some recent views ( ) 2 Linac tunnel
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Refurbished Booster RF John Reid October 24, 2012.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
The Stripping Foil Test Stand in the Linac4 Transfer Line
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
J. TAN, M. SORDET, L. SØBY, F. GUILLOT-VIGNOT, D. GERARD, M. LUDWIG, D. STEYAERT BE/BI Linac4 Instrumentation Review 18th October 2011.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
Developments of the FETS Ion Source Scott Lawrie.
European Organization For Nuclear Research PS2 Naming Conventions: the Options Ronny Billen 15 June 2009 Accelerators and Beams Department Controls Group.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
ESS wire scanner Benjamin Cheymol
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
LINAC 4 CCDTL Accelerating Structure SO SO Aluminum foil H = 0,3…0,5 mm Module of CCDTL Accelerating Structure.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Subject: INJECTION SYSTEM Junction LINAC4-booster
Experience with beam instrumentation at Linac4
Brief Status SPS Prototype PSB Prototype Installed in LS1
Linac4 Beam Characteristics
Beam Diagnostics Instruments
Naming convention Rules
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
Status of the BI Work Package in the LIU-PSB frame
Status of the Front End Test Stand April 2007.
LINAC4 commissioning plans etc.
questions for cern – doyle rev 7/09/07 1/5
commissioning and measurements
MEBT FC, WS, SC and EMU Status
Single Detector Design
BGC Collaboration Meeting –
Beam Finder Wire (BFW) Status
Presentation transcript:

Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October

Linac 4 2 Layout and specs L4L ~ 12 mL4D ~18 mL4C ~22 mL4P ~14 m L4T ~50 m L4Z ~10 m 45 keV3 MeV50 MeV102 MeV 160 MeV 1 Sem 2 Sem 2 WBS 2 Sem 2 WBS 1 Sem 1 Sem/WBS 3 Sem

Contents: 1.SEMGrid LEBT 2.SEMGrid Test Bench (RFQ) 3. SEMGrid DTL- CCDTL and PIMS 4.Wire Beam Scanner CHOPPER +DTL- CCDTL and PIMS 5. Dump and Transfer Lines 6. Summary of cost and status 3

1. SEMGrid LEBT: Resolution: 24 Wires ---> variable pitch Fils W gold 40 Microns. Ceramic support « frame ». Plan V and H simultaneous. Actuator: IN/OUT pneumatic. Travel 100 mm. 4

SEMGrid LEBT Grids: 24 wires (per plane) covering a total of 71 mm 5 wires,spaced 5 mm 4 wires,spaced 3 mm 7 wires,spaced 1 mm 4 wires,spaced 3 mm 4 wires,spaced 4 mm 5

SEMGrid LEBT 6

7

SEMGrid LEBT Grids 8

SEMGrid LEBT Status: 1 monitor installed in the stand test. 1 monitor under manufacture. Feb/April reserve (actuator +flange). Feb

SEMGrid LEBT: Cost: Manufacturing plans:……………..….… CHF SEMGrid assembled…………………………4 500 CHF/monitor Tools and tests…….……………………………1000 CHF 10

2. SEMGrid Test Bench(RFQ): Resolution: 48 fils ---> 24 wires with a pitch of 0.5 mm in the center and 12 wires on the edges with pitch of 1 mm. Wire graphite 34 Microns. Ceramic support « C ». Measure in ‘H’ plane only Actuator: IN/OUT pneumatic. Travel: 100 mm 11

SEMGrid Test Bench: Assembly of tank + actuator 12 Actuator In/Out 100 mm Vacuum tank Foot Beams

SEMGrid Test bench: Grid before soldering 13 Grid wires 60mm Intermediate frame

SEMGrid Test Bench : Status: Vacuum tank : - Study ……OK - Manufacturing of the tank : OK Actuator: - Flange « customised »….OK - Linear Drive..……………..OK - Assembly. ……………….OK Grid: - Plate Al2O3 ….OK (5 pieces) - Serigraphy of the ways….(in progress) - Welds (conductive glue) and tests…..(Nov. /Dec. 2011) Final assembly: - Feb

SEMGrid Test Bench: Cost: Model 3D + plans of tank:…………….… CHF (OK) Manufacturing of tank (per tank)……5 662 CHF Tests:…..………...……..162 CHF (OK) Actuator + flange: (per assembly)… CHF (OK) Grid: (5 pieces)…………………………..… CHF (in progress) 15

3. SEMGrids DTL-CCDTL-PIMS Lines. Resolution: 24 wires, spaced 0.5 mm - Wire graphite 34 Microns ---> conductive glue. - Wire W gold 40 Microns ---> tin solder. Actuator: IN/OUT pneumatic. Separated ‘H’ and ‘V’ measurement Ceramic support « type C » Travel: 50 mm 16

SEMGrids DTL-CCDTL-PIMS lines. Assembly of Tank + Sem H et V 17 Tank Actuator V Actuator H Foot Beam

SEMGrids DTL-CCDTL-PIMS lines. 18 Place for connector box. beam

SEMGrids DTL-CCDTL-PIMS lines. Section across beam axis 19 “V “ In “H” Out

SEMGrids DTL-CCDTL-PIMS lines. Section along beam axis : 20 2mm H V No collision between H and V grids Beam

SEMGrids DTL-CCDTL-PIMS lin Vacuum tank: 21 Foot Beam Plan V Plan H

SEMGrids lines DTL-CCDTL-PIMS Measuring Head: 22 Measuring head is removable (4 screws) Connector Sub D 25 pins

SEMGrids lines DTL-CCDTL-PIMS Measuring Head (section): 23 Feedthrough Grid Bellows Grid support

SEMGrids lines DTL-CCDTL-PIMS Location of wires on the electronic ways: 24 Intermediate frame Grid Graphite wires

SEMGrids lines DTL-CCDTL-PIMS Status: Tank: (5 pieces) - Study ……OK(to be checked) - Manufacturing of tanks + supports: June 2012 Actuator: (5 X 2 actuators + 1 reserve) - Study……..OK (To be checked) - Manufacturing……June Assembly. …………………… « Measuring head: (10 pieces + 2 reserves) - Plate Al2O3 …. (10 pieces) - Serigraphy of the tracks….(ok) - Soldering (conductive glue) and tests…..(Oct /Dec 2011) Final Assembly : -Oct

SEMGrids lines DTL-CCDTL-PIMS Cost: Model 3D + plans of the tank: CHF (Ok) Manufacturing of the tank:…… CHF(estimation/pce) Actuator: ………….…………….….3000 CHF(estimation/pce) Measuring head:.………………………1 500 CHF(estimation/pce) 26

4. Wire Beam Scanner: Actuator + Wire support: 27 Stepping motor Wire support Linear Drive Flange DN63 Travel : 40 mm /45 deg.

WBS Measuring head: metallic wires 28 Wires

WBS : TANK: 29 Beam Flange DN63 Vacuum gauge Foot 112mm

WBS: TANK: mm

WBS Status: Vacuum tank: - Study……OK - Production of tanks: Beginning of Actuator (linear drive): - Mechanical parts for 9 Scanners ….OK. - Motors(10) to order (6 to 10 weeks.) - Miscellanious pieces End of Assembly. Start of Wire support: - Metallic wires………….OK. - Graphite wires………………Start of

WBS: Cost: Model 3D + manufacturing drawings:……… CHF (estimate) Vacuum tank: (6 pieces) - Chopper line (2 pieces) ………………. ? (Ok) - Line CCDTL-PIMS (4 pieces)……… CHF/Tank. (to be committed) Actuator: (9 pieces) - Manufacturing:………………… CHF/act. (Ok) - Motorization:………………………………… CHF/motor. (to be committed) - Misc…………………………………………… CHF/act. (to be committed) 32

5.Dump and Transfer Lines SEMGrid similar to the SEMGrid DTL-CCDTL- PIMMS. 33

Line # of Monitor s Dynamic range (where applicable) AccuracyResolutionComments Intensity [p] Pulse Length [us] Beam Size [mm] L4L 2 SemG. 2 WS mA ….0.2 mm 0.1 mm 1 mm-LEBT: pas variable Diam chamber: 100mm -RFQ: 24 x0.5 in the center+12x1 on edges Diam chamber: 65 mm L4D 1 SemG.40 mA100….0.1 mm0.5 mm X 24Diam. Chamber: 38 mm L4C 2 SemG. 2 WS. 40 mA100….0.1 mm0.5 mm X mm Diam. Chamber: 38 mm L4P 2 SemG. 2 WS. 40 mA100….0.1 mm0.5 mm X mm Diam. Chamber: 38 mm L4Z 1 SemG.…. 0.1 mm…. L4T 3 SemG.…. 0.1 mm….

Status MonitorsQty.DeliveryReserve Semgrid LEBT2 + 1R Actuator: Measuring head: 1 ok +1 Feb ok +1 April /1/ Semgrid RFQ1 Tank: Actuator: Measuring head: Ok Dec.2011 No 4Grids Semgrid DTL- CCDTL-PIMS 5 + 2R Tank: Actuator: Measuring head: June 2012 No 2 5 WBS6 + 3R Tank: Actuator: Measuring head: Avril ok + Mars 2012 Fev 2012 No Motors wires 35

COSTS(CHF) MonitorsStudy (CHF) Actuator (CHF) Measuring head (CHF) Tank (CHF) Reserve (CHF) SEMGrid LEBT X15002X……….4500 SEMGrid RFQ X12503X58241X5000 SEMGrid DTL.CCDTL.PIMS X15005X100005X17500 WBS X2006X100004X21000 TOTAL

COSTS TOTAL: ~ CHF Actually, ~ CHF has been committed, there remains ~ CHF to be paid for the mechanical assembly as of today. 37