Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #05 Gateway To Space ASEN / ASTR 2500 Class #05.

Slides:



Advertisements
Similar presentations
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Advertisements

Clean Air Project: Team Big Green SpaceGasm Launch Readiness Review Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #27 Gateway To Space ASEN / ASTR 2500 Class #27 T+9.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #04 Gateway To Space ASEN / ASTR 2500 Class #04.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
Requirements Definition Marcin Pilinski Chris Koehler Colorado Space Grant Consortium.
Colorado State University- Pueblo Working with Risley Middle School and Craver Middle School.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #05 Gateway To Space ASEN / ASTR 2500 Class #05.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #28 Gateway To Space ASEN / ASTR 2500 Class #28.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #27 Gateway To Space ASEN / ASTR 2500 Class #27 T+3.
1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.
1 Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #09 Gateway To Space ASEN / ASTR 2500 Class #09.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
Student Hands On Training I (2009) Hands-On Activities Hands-On Activities.
GONS Final Presentation Steven Benedict Jake Danser Josh Hecht Brock Kowalchuk Erik Shuttlesworth Matthew Zemel December 4, 2007 Steven Benedict Jake Danser.
Panoramic Rays Conceptual Design Review Brian Gonzales, Kaia Jerde, Harrison McLean, Anirudh Sarsam, Brett Traub, Matt Capron September 20, 2007.
Team Name Final Presentation Team Members Date Rev
1 Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #08 Gateway To Space ASEN / ASTR 2500 Class #08.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #06 Gateway To Space ASEN / ASTR 2500 Class #06.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #24 Gateway To Space ASEN / ASTR 2500 Class #24.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #9 Gateway To Space ASEN / ASTR 2500 Class #9.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
1 Student Hands On Training I (2009) BalloonSats & Ballooning BalloonSats & Ballooning.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Conceptual Design Overview
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
Greg Rancourt, Sarah Flinn, Dominic Boiko, Kevin Stuth, Derek Houtz, Max LaFon.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #05 Gateway To Space ASEN / ASTR 2500 Class #05.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #04 Gateway To Space ASEN / ASTR 2500 Class #04.
James Bader, Jordan Dickard, Blake Firner, Amanda Kuker, Michael Lotto, Diana Shukis
Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #06 Gateway To Space ASEN 1400 / ASTR 2500 Class #06 T-79.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Space Monkeys Launch Readiness Review Project Curious George November 11, 2008 Project Curious George November 11, 2008.
Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #21 Gateway To Space ASEN 1400 / ASTR 2500 Class #21 T-25.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #03 Gateway To Space ASEN / ASTR 2500 Class #03.
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney September 23, 2008.
REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: 2519S02 FOR
Zachary Cuseo, Sydni Smith, Andrew Fruge’, Tyler Knappe, Christopher Nie, and Shweta Maurya 8 October 2009.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams November 11, 2008.
Team Magnaritaville Conceptual Design Review Zachary Cuseo, Andrew Fruge, Shweta Maurya, Sydni Smith, Christopher Nie, Tyler Knappe 9/22/09 Fall 2009 Rev.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #05 Gateway To Space ASEN / ASTR 2500 Class #05.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
GONS Critical Design Review Steven Benedict Jake Danser Josh Hecht Brock Kowalchuk Sean Pomeroy Erik Shuttlesworth Matthew Zemel October 17, 2007 Steven.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #06 Gateway To Space ASEN / ASTR 2500 Class #06.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #3 Gateway To Space ASEN / ASTR 2500 Class #3.
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #3 Gateway To Space ASEN / ASTR 2500 Class #3.
Spring REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: 2500-SP03 FOR DESIGN CONCEPT OF THE Balloon Satellite (BalloonSat) PROPOSALS ARE.
Mission Statement... The Space Wolverines will;
Colorado State University- Pueblo
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
S^3 Launch Readiness Review
Team SCREAM Launch Readiness Review
Team Icarus Brandon Scott Bosomworth Edgar Alejandro Flores
Presentation transcript:

Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #05 Gateway To Space ASEN / ASTR 2500 Class #05

One Minute Paper:

-Recap of last class -Announcements -One Minute Reports -RFP, Requirements, Block Diagrams, and Design Documents (Oh My) -Next class Soldering 101 Today:

Colorado Space Grant Consortium Last Class Recap ASEN / ASTR 2500 Class #05 Last Class Recap ASEN / ASTR 2500 Class #05

- Work effectively as a team - Remember center of gravity during drop while designing - Good designs can be ruined by how it’s dropped - Design must be strong enough to survive the trip to the scale Things to Think About:

Colorado Space Grant Consortium And the Winners ARE? And the Winners ARE?

Link #1 Link #2

- Find your missing team members - Will meet in DLC 1B70 on Thursday 09/10/09 - Need volunteers to help set up and tear down - Set up help needed at 8:30 AM, tear down help until 11:15 - HW 03 due 09/10/ st Sunday training session 09/13/09 from 3:00 to 9:00 PM - General Questions? Announcements:

- If we decide our team sucks, can we switch? - What will we be doing individually on teams? - Has a team ever not made it to launch? - Why was George Lucas on Pluto? - Where do we start with our project? - How many lego teams have been successful? - How much are we expected to learn on the BalloonSat? 1 Minute Reports:

Colorado Space Grant Consortium Request For Proposals

What is an RFP? - There is a lot of money out there - There are a lot of ideas - Request For Proposal bring them together - Most satellites were at one time an RFP - Most of you will write or help write a proposal in your job - Now is your time to practice

Civilization as you know it has been destroyed by killer tomatoes from Io. You and your clan are trying to understand what’s going on with the planet. Your clan has liberated EOSS headquarters and they are now at your disposal. Your clan also has access to the entire inventory at allelectronics.com, large amounts of gaseous helium, latex balloons, a machine shop, foam core, various batteries and a Noodles & Co, which still continues to operate. The fate of planet Earth is in your hands.

SEE RFP

To Recap RFP: -Final weight shall not exceed 850 grams - Shall image the Earth or the Balloon during flight and shall record internal and external temperature - Must have an additional experiment Chapter 8 nearspace.asp Chapter 8 nearspace.asp - Must follow all the guidelines while writing proposal - Why and How – this is your plan and foundation for project - Using screen shots…

So... -Take the ideas you came up with individually during the HW#2 - Start with these in your team and expand them during HW #3 - But…Keep It Simple Stupid (KISS Principle) - Start now! - You are writing a proposal not a request for proposal - Proposals September 17, Launch is November 7, 2009

What You Get… Plus - Foam core and insulation - Flight batteries - Hot glue and Al tape - Flight tube and flag - Switches

Presentation: Presentation Templates - Final presentation should cover same items in final report

Final Written Report: Design Document Template - You will write you team’s final report throughout the semester with our Design Document revisions - team video

Fall 2006 Team Video

Fall 2008 Team Video

Drawings:

Colorado Space Grant Consortium Functional Block Diagrams Functional Block Diagrams

Functional Block Diagram:

AVR 2MB Flash, Temp, Pressure, XY Accel Onboard 9.0V5.0V3.3V Analog #1 Analog #2 Analog #3 Analog #4 Outputs Inputs 9V Switch Camera Data Line Heater 9V 1.5V 2 GB Data Line 9V Switch

Colorado Space Grant Consortium Requirements

Requirements Definition Marcin Pilinski Chris Koehler Colorado Space Grant Consortium

Anatomy of Requirements Mission Statement (aka Mission Goal) A very general description of the problem being addressed by the system. Mission Objectives 3 to 5 general statements elaborating the Mission Statement. Objective Requirements Quantify each objective: when, what, where, for how long System Requirements The system as a whole must perform to this set of specifications in order to meet the objective requirements, mission objectives, and mission statements Subsystem Requirements Each subsystem must perform to these specifications in order to meet the criteria defined above. This part is done separately for each subsystem i.e. power, mechanical, computer, science, thermal. Step 1: General definition. Subjective description and a few numbers Step 2: Numbers and ranges. Focus in on defining the problem. Step 3: Subsystems. Repeat step 2 for every subsystem, tracing from system requirements G O Requirements Level

An Example from Class: Icarus Goal (G1) The BalloonSat Aquintus shall ascend to an altitude of approximately 100,000 feet to carry out scientific experiments that will measure tilt of the satellite, forces acting upon it, wind speed, and solar energy to better understand the conditions in which high altitude observatories would be in. Goal (G1) The BalloonSat Aquintus shall ascend to an altitude of approximately 100,000 feet to carry out scientific experiments that will measure tilt of the satellite, forces acting upon it, wind speed, and solar energy to better understand the conditions in which high altitude observatories would be in. Goal (G1) The BalloonSat Aquintus shall ascend to an altitude of approximately 100,000 feet to carry out scientific experiments that will measure tilt of the satellite, forces acting upon it, wind speed, and solar energy to better understand the conditions in which high altitude observatories would be in. O1 (comes from G1) Construct BalloonSat to improve understanding of HA conditions at X-100,000 ft for under $YYY dollars by MM/DD/YYYY. O2 (comes from G1) Measure tilt in one axis and forces in the range of X mN to YmN as a function of altitude in the range of X-100,000. O3 (comes from G1) Measure wind speed perpendicular to one face of the BalloonSat and solar energy as a function of altitude.

2. Objective Requirements and System Requirements Before Starting the next level… (system level or level 1 in this scheme) 1.A requirement must be NECESSARY, must have a clear need 2.A requirement must be TRACEABLE 3.A requirement must HAVE A METHOD OF VERIFICATION 4.A requirement must be ATTAINABLE 5.A requirement must be CLEAR 1.SYS2The system shall determine the tilt from 10 to -10 degrees with a precision 0.5 degrees (Goal 0.1 degrees). O2 Ex.

2. Objective Requirements and System Requirements General Guidelines and Wisdom For the Young Engineer 1.A requirement defines the “WHAT” not the “HOW” –“HOW” defines the implementation, i.e. the solution –“WHAT” defines the functionality which is the first thing you need before starting anything! 2.A requirement has some standardized wording –shall: denotes a requirement which must be verified, use it in every requirement “there is no try, only do or do-not” –should: denotes a goal for which a best effort will be made –will: denotes a factual or explanatory statement 3.A requirement is succinct, strong, and gets to the point fast –Avoid “or” statements and “if” stipulations –No wordiness, a brief statement saying WHAT the system shall do. –DO NOT use the following words or ones like it: A FEW WEASEL WORDS TO AVOID: Adequate, Always, Bad, Better, Clearly, Easily, Efficient, Etc., Every, High, Ideal, Large, Maximize, Maximum, May, Most, Minimize, Minimum, Must, Never, Normal, Rapid, Real-time, Satisfactory, Significant, Simultaneous, Small, Sometimes, Sufficient, User-friendly, Worse… These words introduce ambiguity, doubt, and deception… …an engineer craves not these things.