Optimisation of single bunch linacs for possible FEL upgrades Alexej Grudiev, CERN 6/02/2014 CLIC14 workshop.

Slides:



Advertisements
Similar presentations
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Advertisements

ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
July Alexej Grudiev, Improvement of CLIC structure. Possible improvement of the CLIC accelerating structure. From CLIC_G to CLIC_K Alexej.
INVESITGATION OF AN ALTERNATE MEANS OF WAKEFIELD SUPPRESSION IN CLIC MAIN LINACS CLIC_DDS.
Wakefield suppression in the CLIC main accelerating structures Vasim Khan & Roger Jones.
Design of Standing-Wave Accelerator Structure
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Room temperature RF Part 2.1: Strong beam-cavity coupling (beam loading) 30/10/2010 A.Grudiev 5 th IASLC, Villars-sur-Ollon, CH.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
Damped C-Band structures for ELI_NP proposal D. Alesini (LNF-INFN, Frascati, Italy) CERN, 18 July 2012.
Low Emittance RF Gun Developments for PAL-XFEL
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
RF structure design KT high-gradient medical project kick-off Alberto Degiovanni TERA Foundation - EPFL.
New RF design of CLIC DB AS Alexej Grudiev, BE-RF.
CLIC RF manipulation for positron at CLIC Scenarios studies on hybrid source Freddy Poirier 12/08/2010.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
SLAC Accelerator Development Program: X-Band Applications Chris Adolphsen OHEP Accelerator Development Review January 24-26, 2011.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
CLIC and High Gradient FEL Design D. Schulte for the CLIC collaboration and FEL friends D. Schulte, LSUM, Ankara, October
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
Hybrid designs - directions and potential 1 Alessandro D’Elia, R. M. Jones and V. Khan.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
Optimization of CLIC-G structure & Design of CLIC open structure Hao Zha, Alexej Grudiev (CERN) Valery Dolgashev (SLAC) 27/01/2015.
CLIC developments Xband FEL linac introduction W. Wuensch Xband technology.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
A Compact X-Band FEL Linac Chris Adolphsen SLAC. Chose X-Band technology as an evolutionary next step for the Next Linear Collider (NLC) from the SLAC.
Towards a full C-band multi-bunch/high rep. rate/high gradient injector linac D. Alesini (LNF-INFN, Frascti, Italy) With the contribution of: A. Bacci,
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
X-band Based FEL proposal
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
Course B: rf technology Normal conducting rf Part 2: rf-to-Beam Coupling Walter Wuensch, CERN Sixth International Accelerator School for Linear Colliders.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
A. Aksoy Beam Dynamics Studies for the CLIC Drive Beam Accelerator A. AKSOY CONTENS ● Basic Lattice Sketches ● Accelerating structure ● Short and long.
Test Accelerating Structures Designs, Objectives and Critical Issues
CALIFES A proposed electron beam test facility at CERN
Multi-stage pulse compressor
RF-kick in the CLIC accelerating structures
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
New test structures for CLIC (RF design)
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Abstract EuSPARC and EuPRAXIA projects
An X-band system for phase space linearisation on CLARA
Status of the CLIC main beam injectors
Optimisation of single bunch linac for FERMI upgrade
X-band FEL beam dynamics issues
NC Accelerator Structures
INJECTION SYSTEM UPDATE
Brief Review of Microwave Dielectric Accelerators
Developments on Proposed
Summary of the test structure design
CEPC injector high field S-band accelerating structure design and R&D
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
Bunch Separation with RF Deflectors
SuperB project. Injection scheme design status
CLIC source update CLIC main beam injectors reminder
Overview Multi Bunch Beam Dynamics at XFEL
Status of the CLIC Injector studies
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Presentation transcript:

Optimisation of single bunch linacs for possible FEL upgrades Alexej Grudiev, CERN 6/02/2014 CLIC14 workshop

GdA_CLIC Workshop_January 28 - February 1, Linac layout and energy ugrading Present machine layout E beam up to 1.5 GeV FEL-1 at nm and FEL-2 at 20-4 nm Seeded schemes Long e-beam pulse (up to 700 fs), with “fresh bunch technique” ~ 50 m available 40 m (80%) available for acceleration Energy upgrade Space available for acceleration 40 m Accelerating GHz 60 MV/m X-band linac energy gain 2.4 GeV Injection energy.75 GeV Linac output energy3.15 GeV FEL-1 & FEL-2 beamlines New FEL beamline < 1 nm Beam input energy ≥ 750 MeV For short bunch (< 100 fs) and low charge (< 100pC) operation Motivation from Gerardo D’Auria CLIC13

Aperture scaling and BBU Growth rate of the BBU due to wakefield kick from head to tail: PresentUpgradeScaling factor γ’/γ L t [m]40 [m]~10 E 0 [GeV]0.75 E L [GeV] /2 σ z [fs] /7 eN [pC] /5 ↓ a [mm]55*0.35=1.75 ←1/(2*7*5) γ0.02 Keep const * Alex Chao, “Physics of collective beam instabilities in high energy accelerators”, 1993 ** Karl Bane, “Short-range Dipole Wakefields in Accelerating structures for the NLC”, SLAC-PUB-9663, 2003

Transient in a cavity -> pulse compression W V P in P0P0 P out I in V in I ref V ref V rad I rad · P in P out Short-Circuit Boundary Condition: tptp tktk Analytical expression for the pulse shape

Effective shunt impedance of Acc. Structure + Pulse Compressor * i.e. A. Lunin, V. Yakovlev, A. Grudiev, PRST-AB 14, , (2011) ** R. B. Neal, Journal of Applied Physics, V.29, pp , (1958) Effective shunt impedance of TWAS ** + Acceleration in TWAS for transient pulse shape from PC * = Effective shunt impedance of TWAS+PC **

Effective Shunt impedance in Const Impedance (CI) AS R s0 /R τ s0 R s /R For Q = 8128; Q 0 = ; Q e = τ s0 = => R s0 /R = But in general it is function all 3 Qs: Q, Q 0, Q e R s /R τ s0 = => R s0 /R = No pulse compression With pulse compression

Const Gradient (CG) AS If the last cell ohmic and diffraction losses are equal => minimum vg. For 12 GHz, Q=8000, l c = 10mm: τ s0 = 0.96; min(vg/c) = very low vg at the end BUT CGAS can reach higher R s /R than CIAS Lowest group velocity limits the CGAS performance RsRs R s /R No pulse compression Q = 8128; Q0 = ; Qe = τ s0 = => R s0 /R = – function Q-factors Roughly the same as for CIAS with pulse compression vg_max = vg( ); vg_min = vg( ) Optimum vg variation is about factor 3.3 R s /R With pulse compression

Undamped cell parameters for dphi=150 o

CIAS pulse compression optimum Q 0 = – Q-factor of the pulse compressor cavity(s) t k = 1500 ns – klystron pulse length Optimum attenuation: τ s0 Averaged Shunt Impedance R s0 /R Optimum value of Q e ~ const: ranges from for Q=6000 up to for Q=8000 Point from slide above R s0 /R

CIAS Effective Shunt Impedance: w/o and with pulse compression No pulse compression With pulse compression As expected ~ 4 times higher effective shunt impedance with pulse compression Optimum pulse length is ~ two times longer no pulse compression is used, still it is much shorter than the klystron total pulse length R s0

CIAS linac 40 m long, =60MV/m : w/o and with PC Total klystron power Optimum structure length Klystron power per structure ~# of structures per 0.8x50 MW klystron 2 -> 1/5 ~20 -> ~2

CIAS high gradient related parameters: w/o and with PC Typical Pulse length AS Pin(t=0) AS Esurf(z=0,t=0)AS Sc(z=0,t=0) Flat pulse: ns Above the HG limits for larger apertures Peaked pulse: ns ns Assamption: Effective pulse length for breakdowns is ~ half of the compressed pulse  Breakdown limits are very close for large a/λ and thin irises A dedicated BDR measurements are needed for compressed pulse shape

CIAS with PC: max. Lstruct < 1m For high vg corner Shorter tp Lower Qe More Ptotal Less Pin/klyst. Lower field and power quantities R s0

CIAS and CGAS with PC, different RF phase advance, no constraints CLIC_G_undamped: τ s =0.31 < τ s0 =0.54; Ls=0.25m; Qe=15700; Pt = 400MW H75 : τ s =0.50 ~ τ s0 =0.54; Ls=0.75m; Qe=20200; Pt = 613MW

CIAS and CGAS with PC, different RF phase advance, Ls < 1m

Small aperture linac, 2.4 GeV, 40m RF phase advance2π/3 a/lambda0.118 d/h0.1 Pt322 MW Ls0.833 m # klystrons8 # structures8 x 6 = 48 a2.95 mm d0.833 mm vg/c2.22 % tp125 ns Qe20700 Constant Impedance Accelerating Structure with input power coupler only P C RF load Klystron Pulse compressor Hybrid

Middle aperture linac, 2.4 GeV, 40m RF phase advance 2π/33π/4 a/lambda0.145 d/h Pt401 MW Ls1 m # klystrons10 # structures10 x 4 = 40 a3.62 mm d1.09 mm0.937 mm vg/c3.75 %3.29% tp90 ns102 ns Qe Constant Impedance Accelerating Structure with input power coupler only P C RF load Klystron Pulse compressor Hybrid

Large aperture linac, 2.4 GeV, 40m RF phase advance5π/6 a/lambda0.195 d/h0.183 Pt602 MW Ls1.333 m # klystrons15 # structures15 x 2 = 30 a4.87 mm d1.90mm vg/c4.425 % tp101 ns Qe18500 Constant Impedance Accelerating Structure with input power coupler only P C RF load Klystron Pulse compressor Hybrid

FERMI energy upgrade An analytical expression for effective shunt impedance of the CI and CG AS without and with pulse compression have been derived. Maximizing effective shunt impedance for a given average aperture gives the optimum AS+PC design of a single bunch linac Different constraints have been applied to find practical solutions for a FERMI energy upgrade based on the X-band 2.4 GeV, 60 MV/m linac Closer look together with beam dynamics experts is necessary to chose the right structure

Motivations from PSI

X-band Energy Vernier for ATHOS Parameters specs: Required energy gain: dE = GeV Total length available for acceleration: Lt = 16 m If: the aim to introduce the same amount of Longitudinal Wake (W_L) as in C-band Linac3: W_L3 Then: Since W_L~L/a^2: = /sqrt(L3_C/Lt)=6.44mm/sqrt(104m/16m)=2.53mm => /λ=0.101 Total power from the klystrons at 1.5us: Ptot is significantly less then on can get from one XL5 and we are far from breakdown limit. => higher dE is possible even with one XL5. For example, for 0.5 m long CIAS: 40MW => 0.53GeV or 2x40MW => 0.76GeV a/λ= % of W_L3 L_s = 0.5m 32 CI Acc. Str. Ptot = 22MW + WG loss + op. margin a/λ= % of W_L3 L_s = 1m 16 CI Acc. Str. Ptot = 24MW + WG loss + op. margin Const Gradient (CG) AS require the same power Const Impedance (CI) AS have a bit higher EM fields and Sc at the input cell

More motivations from PSI

ARAMIS energy upgrade. It is probably unreasonable to take 0.5 m CIAS from the previous slide since it is too short and aperture is too small (there is already enough W_L in ARAMIS line) Taking 1m long CIAS from the previous slide: 24m long X-linac with 3 XL5s (3x40MW) can provide energy increase: dE = 1.1GeV. In this case, we may come close to the BDR limit of 4MW/mm^2 (BDR~1e-7) so we may start to see some breakdowns at this levels ! The above 1m long CIAS is rather close to a potential Fermi linac energy upgrade structure (middle aperture). It probably can be the same structure for both projects. A different structure (i.e. larger aperture) is maybe a better choice. More refined specs are needed to make optimized design.