RECYCLER 11.25.2002 1 REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.

Slides:



Advertisements
Similar presentations
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Advertisements

Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
1 NuMI BEAM POSITION MONITOR via MAIN INJECTOR, and RECYCLER Brajesh Choudhary, 06.Mar.2003 MINOS Collaboration Meeting University of South Carolina, Columbia.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
2002/7/02 College, London Muon Phase Rotation at PRISM FFAG Akira SATO Osaka University.
2002/7/04 College, London Beam Dynamics Studies of FFAG Akira SATO Osaka University.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
RECYCLER RECYCLER BPM SYSTEM UPGRADE, BPM TEST STATUS Brajesh Choudhary & Martin Hu & FUTURE PLANS.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
MI 1 REQUIREMENTS FOR THE MAIN INJECTOR & ASSOCIATED TRANSFER LINES BPMs INCLUDING THE NuMI BEAM LINE Brajesh Choudhary for the MI Dept.
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Simultaneous Position Measurements of Protons and Anti-Protons in the Tevatron R. K. Kutschke †, J. Steimel, R.Webber, S. Wolbers, Fermilab*, Batavia,
Antiproton Acceptance Keith Gollwitzer Dept. of Energy Review March 30, 2005.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Specifications of Tevatron BPM Upgrade Jim Steimel.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
CEPC Booster Zhang Chuang, Cui Xiaohao September 11,2015.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
A Survey of TBT Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Tevatron Department Meeting February 18, 2005 Beams-doc-1583-v2.
A Survey of the Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Run II Meeting March 24, 2005 Beams-doc-1752-v2.
TBT Data & Lattice Measurement for Recycler Ming-Jen Yang December 17, 2014.
Beam Commissioning Adam Bartnik.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Auxiliary Positron Source
Large Booster and Collider Ring
Linear and Nonlinear Lattice Correction Via Betatron Phase
Thursday morning – optics correction
Feed forward orbit corrections for the CLIC RTML
Feedforward correction to injection bump error in the SPring-8
Presentation transcript:

RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.

RECYCLER  Introduction  Definitions and measurements  Closed orbit  Single turn flash  Continuous Mode (Background flash)  Turn-by-turn  Intensity  Calibration  Beam structures  Specifications  Time structure  Dynamic range and precision  Number Of BPMs  Summary OUTLINE OF THE TALK

RECYCLER RECYCLER BPM SYSTEM Features of the present recycler BPM system  30 cm long elliptical split-pipe detectors, with axis dimensions of 9.6 cm X 4.4 cm  In the straight sections, round split-pipe BPMs with 10 cm aperture  The signals are pre-amplified in the tunnel  Signal processing is done in the service buildings  It incorporates the ion clearing system

RECYCLER RECYCLER BPMs Split tube BPM Design End View Top View Pictures - Courtesy Jim Crisp

RECYCLER  Flash Mode – Single turn position of the beam around the ring at a specified time/turn.  Injection Orbit – First turn position of the beam around the ring.  Last Turn Orbit – Last turn position of the beam around the ring before the kicker kicks out the beam.  Continuous Mode – Position data taken at 720Hz continuously.  Closed Orbit Mode – Average of ~100 background flashes.  Turn by Turn Mode for bunched beam - Flash data (at every BPM simultaneously) for up to 1024 consecutive turns. DEFINITIONS

RECYCLER WHAT DO WE NEED TO MEASURE ? Closed Orbit:  To understand where the beam is  To maximize the aperture, and  To understand and reduce the feed down effects from the combined function magnets We need a time resolution of ~ 10ms (cf 1sec. MI ramp, 50ms Recycler counter wave). Allows to observe orbit in RR several times during the MI ramp and its effect on the RR beam.

RECYCLER WHAT DO WE NEED TO MEASURE ? – Cont.  Injection (First Turn) Orbit / Counter wave bumps  Extraction (Last Turn) Orbit  Injection Lattice match  Fast perturbations of beam for any particular turn Flash Orbit – Deviations of the beam from the Closed orbit because of We need a trigger time resolution of 132ns (see the time structure slide).

RECYCLER WHAT DO WE NEED TO MEASURE ? – Cont. Beam position at any point as a function of time (Continuous Mode)  To have a continuous monitor of beam Hz for events such as bumps and sudden beam losses This is the basic data of the BPM system  It is used to measure three bumps and aperture scan  It is the input to the fast time plot  And provides loggable data

RECYCLER WHAT DO WE NEED TO MEASURE? – Cont.  To measure the lattice functions of the machine by observing the betatron oscillation caused by a ping.  To measure non-linear properties of the lattice.  To observe evolution of unpredictable events such as sudden beam loss or oscillations.  Study beam dynamics  Measure Injection Oscillations. TURN-BY-TURN MEASUREMENT SIMULTANEOUSLY AT EVERY BPM

RECYCLER LATTICE MEASUREMENT Lattice functions can be measured using TBT or Closed orbit.  Measure  &  lattice function per BPM.  Get phase advance measurement directly from TBT data per BPM (errors are uncorrelated and systematic free)  Insensitive to the accuracy of kick magnitude.  Few kick sources  Measure phase advance and  lattice function per BPM  Potentially better position resolution (due to averaging)  Need minimum of two kick sources, beta at the kickers and phase advance between them.  Systematic errors also include kick strengths & BPM calibration. Turn-by-Turn Closed Orbit

RECYCLER WHAT DO WE NEED TO MEASURE? - Cont.  To diagnose position of beam loss (RR does not have an independent BLM system).  Intensity measurement is also a useful cross check on the validity of the measurements  Can also be used to diagnose non-functioning BPMs BEAM Intensity (±5% * ) at all BPMs for single turn measurement * - Possibly after calibration

RECYCLER CALIBRATION A calibration system must be provided to allow the required position and intensity precision to be maintained over several years.  BPM Calibration system is needed for checking and calibrating  Hardware from the amplifier to the Front end electronics in the service building, and the  Software  BPM calibration software is needed to perform these function and store calibration data in user friendly manner

RECYCLER BEAMS IN THE RECYCLER RECYCLER OPERATIONAL MODES:  Protons will be used for setup and tests (except cooling).  Anti-protons will be used for normal operations.  Reverse proton injection with 2.5MHz or 7.5MHz time structure for tune-up during normal anti-proton operations (both protons and anti-protons in the machine at the same time). We do not require simultaneous measurement of the bunched and the barrier bucketed beam.

RECYCLER RECYCLER BARRIER BUCKET MAP

RECYCLER TIME STRUCTURE 2.5 MHz – In this mode of operation the RR completes a bucket to bucket transfer of 4, 2.5MHz bunches spaced 396ns apart. The RR can either receive or transmit beam in this configuration. This configuration is used for  Proton tune-up of the Recycler  Reverse protons from RR to MI to Accumulator  Pbar transfers from Accumulator to MI to RR, and RR to MI  Recycling of Pbars from the Tevatron.

RECYCLER TIME STRUCTURE – Cont. 7.5MHz – This scenario is expected if the Tevatron goes to 132ns bunch spacing mode. In this case the essential purpose remain identical as in 2.5MHz mode.

RECYCLER TIME STRUCTURE – Cont. “Debunched” beam inside barrier buckets or Stored Pbars  Barrier pulses in the Recycler are currently 48 RF buckets (906 ns).  The number and positions of the barriers may vary.  During injection and extraction 2.5 MHz beam is also present. The Fourier spectrum of the beam current varies depending on the positions of the barriers.

RECYCLER MHz Bunch Structure: The BPM system is NOT required to measure 53 MHz beam in the Recycler. If available it might be used for diagnostic purposes (for example, if MI can’t see 2.5 MHz structure, then 53 MHz will be used for transfer line orbit studies, and we will be able to see the beam as it passes through the RR). TIME STRUCTURE – Cont. For 53 MHz structure the pre-amps should be able to withstand 40 bunches with current up to 2.5E10/bunch.

RECYCLER DYNAMIC RANGE We need to be able to measure:  From 0.5E10/bunch (2.0E10 total) to 7.5E10/bunch (30E10 total) particles for 2.5MHz transfers.  From 0.2E10/bunch (2.4E10 total) to 4.0E10/bunch (48E10 total) particles for 7.5MHz transfers.  From 20E10 to 400E10 particles for debunched stored beam. When the stored beam exceeds 400E10 particles we expect to attenuate the signals. The dynamic range of 20 will be adequate.

RECYCLER INTENSITY CALCULUS  2E10 – requires 3E10 pbars, a reasonable number to use for tuning and pilot shots, given the expected stacking rate.  30E10 – maximum pbar extracted from Accumulator without degrading emittances.  20E10 is the lower limit for the stored/debunched beam in barrier buckets.

RECYCLER MEASUREMENT PRECISION OVER THE FULL DYNAMIC RANGE Absolute - True position relative to the center of the BPM. (Covers long term stability, intensity dependence & spectral dependence.)  1.00 mm  5% of the actual position. Relative - Difference between two measurements on subsequent turns with stable beam. (Covers short term stability and resolution).  0.40 mm This is 3  or ~99% of the measurement should be within these limits.

RECYCLER PRECISION CALCULUS Recycler beam pipe radius is 22mm. 1mm beam position error loses ~10 % of the acceptance. We use orbit differences to study the lattice. The orbit differences are limited to ~ 3mm to avoid beam losses, and non-linear effects. We need 5% resolution to achieve 10% in 

RECYCLER NUMBER of BPMs  We are proposing to modify a BPM at each half cell. (This is the same algorithm as the Tevatron and the MI.) The modified horizontal BPMs will be at the focusing and the vertical at the de-focusing locations. The RR has 104 half cells/plane with ~ 90  phase advance.  We need 211 BPMs (104 Horizontal & 107 Vertical) in RR, 26 BPMs in the transfer lines, a total of 237 BPMs.  The RR at present has 422 BPMs. The associated transfer lines have 26 BPMs.

RECYCLER NUMBER OF BPMs – Cont. Why every half cell:  To observe maximum orbit excursions.  To determine all possible orbit motions unambiguously (to see the sine and cosine terms).  To verify the operation of the correctors. There is one corrector every half cell in RR.

RECYCLER NEW SOFTWARE We are trying to minimize the software effort required by adopting the present software as much as possible. The major changes that we need are:  The capability to read out every BPM on TBT  A simple to use test of the integrity of the system (a combination exercise of the calibration and a list of non-functioning BPM's)

RECYCLER SCHEDULE  January 2003 shutdown – Take out and modify off-plane pre-amplifiers.  February to May 2003 – Reinstall modified pre-amplifiers on on-plane channels in the tunnel, as tunnel access schedule permits, and commission the new BPM electronics.  May 2003 – Use the new system for beam studies at least one month before summer shutdown. An improved working BPM system is needed by 5/2003.

RECYCLER SUMMARY Dynamic Range20:1 Intensity Accuracy5% Absolute Position Accuracy 1.0mm  5% (3  Relative Position Accuracy 0.4mm (3  Flash Trigger Time Resolution132ns Closed Orbit Time Resolution10ms Analog Bandwidth2.5 MHz min m. Bunch Structure ns BB edge 2.5MHz/7.5MHz/BB, ns BB edge Number of BPMs211 + Transfer Lines (26) Display MechanismR39, FTP/SNP, SDA Current clearing electrode functionality need to be maintained and HV(±500V) protection must be included. Commission the new system by May 2003.

RECYCLER CLOSED ORBIT MEASUREMENT OF CIRCULATING ~ 200 BPMs 1.PURPOSE : During operations the Recycler will be in this state most of the time -- circulating, cooled antiprotons, with an RF barrier bucket. Continual monitoring and tracking of beam positions will be an essential diagnostic for tracking, understanding, and correcting orbit changes over time scales of MI ramp times to years. 2.BEAM CONDITIONS : Intensity range= 20e10-400e10 and longitudinal emittance range = 2 eV-sec – 108 eV-sec. RF gap width range = nsec. Barrier bucket size = nsec. 54 eV-Sec of cold beam and 108 eV-Sec of hot beam could be present at the same time in the Recycler. 3.ACCURACY : <0.15 mm rms measurement to measurement rms deviation 4.LONG TERM STABILITY : <0.2mm long term drift 5.TIME RESOLUTION : <10msec 6.NONLINEARITY : <5% and over the full intensity range 7.ELECTRICAL OFFSET: <0.5 mm uncertainty 8.DATA COLLECTION: Triggered on multiple TCLK/RRBS events; triggered manually; up to 720 Hz 9.DATA STORAGE/DISPLAY : 720 Hz, SDA, Data logger, R39 PA

RECYCLER FLASH ORBIT MEASUREMENT OF INJECTED ~ 200 BPMs 1.PURPOSE : During the Recycler operation we will inject 2.5 MHz (4 bunches) pbar/proton beam for tune up and storage. Monitoring of single turn beam position is required for reliable injection and extraction of the beam. 2.BEAM CONDITIONS : Intensity range= 0.5e10/bunch (2e10 total) – 7.5e10/bunch (30e10 total) and longitudinal emittance range = 0.5 eV-sec/bunch – 3 eV-sec/bunch, in the presence of beam in the barrier bucket. This beam is bunched in 2.5 MHz. 3.ACCURACY : <0.15 mm rms measurement to measurement rms deviation 4.LONG TERM STABILITY : <0.2mm long term drift 5.TIME RESOLUTION : <132 nsec 6.NONLINEARITY : <5% and over the full intensity range 7.ELECTRICAL OFFSET: <0.5 mm uncertainty 8.DATA COLLECTION: Triggered on multiple TCLK/RRBS events; triggered manually 9.DATA STORAGE/DISPLAY : SDA, Data logger, R39 PA

RECYCLER FLASH ORBIT MEASUREMENT OF INJECTED ~ 200 BPMs 1.PURPOSE : During the Recycler operation we will inject/extract 7.5 MHz (12 bunches) pbar/proton beam for tune up and storage. Pbar beam will be the recycled beam from Tevatron after collider operation. Monitoring of single turn beam position is required for reliable injection and extraction of the beam. 2.BEAM CONDITIONS : Intensity range = 0.2e10/bunch(2.4e10 total) - 4e10/bunch (48e10 total) and longitudinal emittance range = 0.5 eV-sec/bunch – 0.65 eV-sec/bunch, in the presence of beam in the barrier bucket. This beam is bunched in 7.5 MHz. 3.ACCURACY : <0.15 mm rms measurement to measurement rms deviation 4.LONG TERM STABILITY : <0.2mm long term drift 5.TIME RESOLUTION : <132 nsec 6.NONLINEARITY : <5% and over the full intensity range 7.ELECTRICAL OFFSET: <0.5 mm uncertainty 8.DATA COLLECTION: Triggered on multiple TCLK/RRBS events; triggered manually 9.DATA STORAGE/DISPLAY : SDA, Data logger, R39 PA

RECYCLER TURN-BY-TURN ORBIT MEASUREMENT OF INJECTED ~ 200 BPMs 1.PURPOSE : During the Recycler operation we will inject 2.5/7.5 MHz (4/12 bunches) pbar/proton beam for tune up and storage. Monitoring of Turn-by-turn beam position is required for lattice and beam dynamics studies. 2.BEAM CONDITIONS : Similar to flash condition 3.ACCURACY : <0.15 mm rms measurement to measurement rms deviation 4.LONG TERM STABILITY : <0.2mm long term drift 5.TIME RESOLUTION : <132 nsec 6.NONLINEARITY : <5% and over the full intensity range 7.ELECTRICAL OFFSET: <0.5 mm uncertainty 8.DATA COLLECTION: Triggered on multiple TCLK/RRBS events; triggered manually 9.DATA STORAGE/DISPLAY : SDA, Data logger, R39 PA