Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS1172000 EDMS 1172000.

Slides:



Advertisements
Similar presentations
Consultants in Maintenance Management and Maintenance Planning
Advertisements

ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
Computerized Maintenance Management System | May 15, |1 | Computerized Maintenance Management System Presented By [Presenter Name] [Presenter Title]
More than experience CERN – 3rd MAY 2011 – Kick-off meeting Maintenance Assessment Project – Kick-Off Meeting Arek Burnos, Tony Vaclavicek, Tom Pryslak.
OHT 22.1 Galin, SQA from theory to implementation © Pearson Education Limited Objectives of cost of software quality metrics 2.The classic model.
OHT 14.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software quality infrastructure components The need for procedures and.
Planning and Tracking Software Quality Yordan Dimitrov Telerik Corporation
OHT 17.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Corrective and preventive actions — definitions The corrective and preventive.
Development plan and quality plan for your Project
Computerised Maintenance Management Systems
MFI Office Maintenance Management Project Presentation 30th of May
1 Configuration Management 101 ITS Professional Capacity Building Program T3 Webinar February 21, 2008.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
Enterprise Asset Management
SQA Architecture Software Quality By: MSMZ.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
Software Quality Assurance Activities
From Research Prototype to Production
KPIs report Requirements for KPIs – lagging vs leading
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
RBM and Asset Strategy.
Human Resource Information Systems: A Definition HRIS -- Systematic procedure for collecting, storing, maintaining, retrieving & validating date needed.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
Maintenance Management Project Mario Batz EN-CV Pierre Bonnal DG-DI Christophe Delamare GS-ASE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Ingo Ruehl.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Resource Management Resource Management 3.03 Understand support services.
Atlanta Area OAUG Meeting January 18, 2008 Using Oracle eAM to Support Asset Reliability.
Computerised Maintenance Management Systems
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
Requirements engineering The process of establishing the services that the customer requires from a system and the constraints under which it operates.
Maintenance Management Project Status Report Follow Up Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe.
Damien Lafarge on behalf of MMP Engineering Department Work Organization, Maintenance Planning and Maintenance Experience session Pierre Bonnal Christophe.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
Disaster Recovery Management By: Chris Rozic COSC 481.
Many entry points to improve reliability! Research, Prototyping, Development QA & Testing Manufacturing & Installation Commiss- ioning Operation Technical.
CMMS Software CMMS Software
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
Towards a dependable and sustainable National IT Infrastructure MANAGING IT INFRASTRUCTURE ASSETS: IMPLEMENTATION NEEDS.
Pierre Bonnal DG-DI Christophe Delamare GS-ASE
Asset & Maintenance EN-HE group
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Implementation of Computer Maintenance Management system - CMMS
How to Pass SMRP (Society of Maintenance
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Projects Integrating Planning for Successful Occupancy, Operation, and Maintenance into your Capital Project.
GIS Portal Racks Project
Resource Management 3.03 Understand support services
How to Design and Implement Research Outputs Repositories
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Database Development Cycle
Resource Management PP Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
System Analysis and Design:
Program Introductions Who we are, what and where Clients and Systems
Presentation transcript:

Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS

Outline Current status of MM in EN dept. Current status of MM in EN dept. EN groups and systems concerned EN groups and systems concerned Foreseen implementation approach Foreseen implementation approach EN dept. resources involved EN dept. resources involved

Current Status of MM in EN Dept. CV, EL, HE ICE actively involved in CMMWG/SB CV, EL, HE ICE actively involved in CMMWG/SB BalticBerg Audit – started work on recommendations BalticBerg Audit – started work on recommendations Definition & implementation of first use cases Definition & implementation of first use cases STI starts to review its needs for CMMS STI starts to review its needs for CMMS HECVEL

EN Entities and Systems Concerned Mainly concerned EL, CV and HE Mainly concerned EL, CV and HE Using CMMS (EAM) since more than 15 years Using CMMS (EAM) since more than 15 years Important changes for inventory, maintenance plans, safety inspections, CBM on the way Important changes for inventory, maintenance plans, safety inspections, CBM on the way ICE hardware and software ICE hardware and software Controls infrastructure management integrated with controlled equipment Controls infrastructure management integrated with controlled equipment STI evaluation CMMS needs started STI evaluation CMMS needs started Asset tracking & parts Asset tracking & parts Intervention tracking & documentation Intervention tracking & documentation

2/2 Spares Documentation Maintenance & Reliability Inventory & Data EN Maintenance Management Project Asset inventory Definition of critical assets/tracking Definition of critical parts Material lists Store management Maintenance plans & procedure definitions Inspection rounds modeling & mobile devices KPIs Failure codes Safety inspections review CBM – definition of mechanisms Work order scheduling Definition of essential documentation Collection & linking Reports development Running Activities

Limit of EN MMP Contribution - Software EN main contribution Processes & Models Prototyping Training Support

2/2 Spares Documentation Maintenance & Reliability Inventory & Data S. Poulsen (TBC) D. Lafarge E. Van Uytvinck G. Peon (TBC) FSU & Expert support EN Maintenance Management Project Decision & Validation: EN Department head and Group Leaders Decision & Validation: EN Department head and Group Leaders CV, EL, HE, STI, ICE maintenance Teams M. Batz EN-MMP Continuity of CMMWG/CMMSB actions EN coherent needs & deployment Aligning methods & needs with all MMP participants Field analysis of requirements Field support for deployment

EN dept. resources proposal 1/2 Grou p Resource Name Resource Type % for MMP MMP Res. (p·m) Additiona l Res. (p·m) EL E. Van Uytvinck Staff20%2.5 TBDFSU 24 CV U. EptingStaff20%5.0 S. PoulsenStaff30%7.5 M. BatzStaff60%15.0 TBD Tech. Student ( ) 19 G. PeonStaff & FSU10%2.5 TBDFSU 48

EN dept. resources proposal 2/2 Grou p Resource Name Resource Type % for MMP MMP Res. (p·m) Additional Res. (p·m) HEI. RuehlStaff20%5.0 D. LafargeStaff20%5.0 J.M. ChevalleyStaff10%2.5 A. Bekkelien Fellow ( ) 24 External support ContractTBD STI C. Mitifiot, R. Bebb Staff 20%5.0 ICEP. GayetStaff20%5.0 TBD FSU ( ) 24 ∑55(p·m)139 (p·m)