08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Tue 9/8 – Wed 10/8 Stable beams # :18 RQT12.R7B1 trip. End of STABLE BEAMS # ~86 pb -1 in ~19 hours 20:30 No beam from PSB (RF problem in ring.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Friday 15th June 01:11 Injection.
Monday fill with 1092 bunches (6 h stable beams)
LHC Morning Meeting - G. Arduini
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Monday – recovery from MKI flashover
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Thursday 10th May - morning
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Monday Morning – recovery from cryo.
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Saturday – Morning 7:36 beams dumped
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday – Morning Fill 3265 stable beams since 1:31
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Mon Access for switching temperature probe DFB L7.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Scrubbing progress - 08/12/2012
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Thursday 22 September 2011.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday 20 September 2011.
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Wednesday 26 October 2011.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Wednesday 6.10 Morning: Quench test at 450 GeV
Thursday 10:00 Fill 1986 in stable beams.
Sat :24 Fill 2669 stable beams, average bunch intensity 1.5e11, peak lumi: ~6.5e33 cm-2s-1. 14:37 Beams dumped by operation due to cryo problem.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Mon 8/8 – Tue 9/8 Stable beams #2009
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Tuesday
Presentation transcript:

08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start ramp. 13h15: Stable beams # h39: Beam dump. Collected 30 pb -1  triggered by bad temperature reading on TT891A on DFBAJ_HCM, which caused the CS CM to be lost for a short while, which caused the PIC to fire Monday September 12 th LHC morning report

Peak luminosity > 3 × cm -2 s LHC morning report

Losses & Lifetime at Start of Physics LHC morning report

IR8 Vacuum LHC morning report

IR8 Losses LHC morning report

16h39: Beam dump. Collected 30 pb -1  triggered by bad temperature reading on TT891A on DFBAJ_HCM, which caused the CS CM to be lost for a short while, which caused the PIC to fire  BLM intervention: Deployment of the BLMLHC real-time server with changes on: - fix on the Study Capture buffer and - suppression of some of the debugging files. Several events for Capture, XPOC (beamDumped1 &2) and PM data have been sent to test the correct production of the data and their delivery. All tests completed successfully (including the sanity checks). 19h05: Injection. 20h11: Problem to load ramp for TCTVA.4R1.B2. 22h59: Fixed. Continue… Monday September 12 th LHC morning report

TCTVA.4R1.B2 Issue: PXI Crate Stuck LHC morning report

Pressure Increase at 450 GeV LHC morning report

Vacuum & Temperature IR LHC morning report

23h18: Injection 00h18: Ramp 00h56: Stable beams #2103. Monday/Tuesday September 12 th /13 th LHC morning report

High Luminosity LHC morning report

Loss Warnings IR1 and IR LHC morning report

Vacuum LHC morning report

MKI Temperature LHC morning report

Performance in Last Fills LHC morning report

Delivering integrated luminosity… Ahead LHC morning report