Slide title In CAPITALS 50 pt Slide subtitle 32 pt Capacity Management in WCDMA.

Slides:



Advertisements
Similar presentations
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Advertisements

Slide title In CAPITALS 50 pt Slide subtitle 32 pt Feasibility Study of A-interface over Internet Protocol Masters Thesis Presentation Eero Laitinen,
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Post Launch Tuning Cingular UMTS.
Layer 3 Messaging and Call Procedures
LTE-A Carrier Aggregation
1 Analysis of NGMN Requirements REQ 9: LTE Parameter Optimization.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt G3X Series Fixed Wireless Terminals for GSM/EDGE Networks.
Capacity Management By DION
The Telecom Initiative and WTO Non Tariff Barriers proposals Update May 2009 Per Döfnäs Telefonaktiebolaget LM Ericsson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Active Queue Management for LTE uplink in eNodeB Yifeng Tan Supervisor: Professor Riku Jäntti Instructor:
Channel Switching Capability Impacting features Channel Switching
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Converged SAE / NGN Architecture The ScaleNet Architecture R. Keller, A. Schieder, Ericsson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ericsson satsning på Public Safety - National Security HIØ Personalseminar – 9. mai 06 - Ed.
Overview.  UMTS (Universal Mobile Telecommunication System) the third generation mobile communication systems.
1 Analysis of NGMN Requirements REQ 6: Substitution of Monitoring Probes by Infrastructure Inherent Trace Functionality.
Capacity and Load Sharing in Dual-Mode Mobile Networks
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Proactive fault management in mobile core network Niko Isotalo Instructor: Ira Antikainen Supervisor:
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt WCDMA Theory Dallas – 04 May 2006
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Frame Header Based Speech Quality Analysis Method in a Circuit-Switched Media Gateway Master’s Thesis.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt BSNL 3G Network Parameters affecting Data Speed
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Consumers’ Awareness of, Attitudes Towards and Adoption of Mobile Phone Security Stewart Kowalski, Ericsson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt KPI Reporting and Analysis Templates Naren Mohan
Buckling of Column With Two Intermediate Elastic Restraints Thesis Presentation Author:Md. Rayhan Chowdhury Mohammad Misbah Uddin Md. Abu Zaed.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Improved project management practices as a key to the successful IS implementation Željka Požgaj*, Hrvoje.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Security Level: Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Site DB creation and updates 05/08/2006 by Performance Team.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Bitstream and Hybrid Model VQEG Meeting, Kyoto, March 2008 Jörgen Gustafsson and Martin Pettersson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Service requirements from 3GPP TS SDO Emergency Services Coordination Workshop (ESW06) Columbia.
1 Analysis of NGMN Requirements REQ 3: Energy Saving.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Developing a Testing Process for Remote Usage of Multimedia Messaging Centre Master´s Thesis Presentation.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ESPA in WCDMA.
1 Analysis of NGMN Requirements REQ 10: Automatic Inventory.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt “42” ICT in Ireland Life After the Tiger David Cleary
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Cingular UMTS Phase II Markets Pre-Launch RF Activities.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt H igh S peed D ownlink P acket A ccess Naren Mohan
Slide title In CAPITALS 50 pt Slide subtitle 32 pt HANDOVER Overview.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt WTO Information Technology Symposium: Convergence and the impact of Globalization Ulf Pehrsson VP Government.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt PDU PCN TTCN 3 in SGSN testing Peter Eldh.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POWER CONTROL UMTS Seminar.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Static Call Admission Control and Dimensioning of Media Gateways in IP based Mobile Core Networks Mika.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Dynamic and Persistent Scheduling for Voice over IP Traffic in the Long-Term Evolution Uplink Master’s.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Business Id © NetHawk All rights reserved. Confidential April 2005NetHawk NetHawk Quality of Service products Markus Ahokangas, MSc Product.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt RTSP 2.0 TLS handling Magnus Westerlund draft-ietf-mmusic-rfc2326bis-12.
1 Analysis of NGMN Requirements REQ 7: eNodeB Plug & Play Self Commissioning.
LTE Mobility. Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text.
Ericsson Tower Tube. Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POST LAUNCH TUNING.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Risk-based regression testing in a telecommunication system node Master’s thesis presentation
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ANALYSING EFFECTS OF MALFUNCTIONS ON THE PERFORMANCE OF UMTS RADIO ACCESS NETWORKS Author: Antti Keintola.
GSDC China WRAN 2009 Jan 13th-14th
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Verification of a GPRS Charging System in a Simulated Test Environment Author: Kirsi Koskenheimo Supervisor:
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ambient Networks Media Delivery in the 3GPP Framework Author: Outi Koski Supervisor: Heikki Hämmäinen.
Rev PA1 WCDMA RAN PM - Supplemental Information 3/3/20051 WCDMA RAN PM Supplemental Information.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Some Background about 3GPP SA4’s RTSP extensions Thorsten Lohmar.
Security Level: HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Authentication/Authorization for possible deployments Relevant scenarios for CAFE.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Improvement of Software Delivery Process in the Telecommunications Industry Xian Sun
Slide title In CAPITALS 50 pt Slide subtitle 32 pt GMPLS RSVP-TE extensions for OAM Configuration IETF-81 Quebec.
1 Wireless Networks Lecture 21 WCDMA (Part I) Dr. Ghalib A. Shah.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Multi-component KPI:s ETSI/STQ_Mobile(08)18TD10.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ITU Joint Regional Conference in Alexandria Building secure societies Mr. Kent Halling, Senior Advisor.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt XPD measurement & Alignment.
Presentation transcript:

Slide title In CAPITALS 50 pt Slide subtitle 32 pt Capacity Management in WCDMA

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment Agenda  To provide the basics about Capacity Management  To mention the parameters involved  Monitoring of the functionality using passive measurements (STATISTICS)

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment Capacity Management  Ericsson WCDMA RAN Capacity Management Solution with support of other Radio Network Functions will control the load in the WCDMA cells.  Using this capability the system will provide the request QoS and coverage for individual connections

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment Resources that are capacity limiting  Downlink Transmitted Carrier Power  Downlink Channelization Codes  Uplink Interference

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment Dedicated Monitoring Resources  Downlink Channelization codes  Histogram Monitor (# RL in compressed mode in a cell, DL-SF, UL-SF usage, # of simultaneous HS-serving RL in a cell  Air Interface Speech Equivalent (UL and DL)  Uplink Received Total Wideband Power  RBS hardware utilization in UL/DL (expressed in terms of channel elements)

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment Algorithms working together  The set of capacity management algorithms aims to control the load in UTRAN cells. The purpose of the algorithms is to maximize the capacity in the UTRAN while maintaining the requested Quality of Service and coverage, and to ensure stability in the system. The set of capacity management algorithms executes this control by allowing usage of the system resources when possible, and by re-dividing and limiting the usage of resources when needed.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment The work flow of Capacity management

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment Functionalities inside a box

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment The fantastic three  Dedicated Monitored Resource handling It is responsible for keeping track of the utilization of critical resources.  Admission Control It is responsible for controlling the utilization of dedicate monitored resources by accepting or refusing request for usage of these resources.  Congestion Control  It is responsible for detecting and resolving overload situations on certain dedicated monitored resources.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment Requesting for admission…..  Non guaranteed, non Handover  Non guaranteed, Handover  Guaranteed, non Handover  Guaranteed, Handover  Guaranteed HS, non Handover  Guaranteed HS, Handover

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment Triggering….

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment The Parameters… 

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment RF Power and Channel Element Utilization Monitoring RBS Counters pmAverageRssi, pmTransmittedCarrierPower, pmTransmittedCarrierPowerNonHs, pmNoOfRadioLinksSf4-256 (UL-DL), pmApomcOfUlLinkCap Call Set up Blocking KPI Number of RAB establishment requests denied due to congestion, the number of RRC connections terminated due to congestion, the number of RABs switched down due to congestion

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment Admission Monitoring

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment Questions?

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson ConfidentialCapacity Managment