doc.: IEEE Submission July 2012 Robert F. Heile, ZigBee AllianceSlide 1 79th Session of meetings of the IEEE Working Group for Wireless Personal Area Networks July 15-21, 2012 Grand Hyatt Manchester, San Diego, California, USA Closing Report
doc.: IEEE Submission July 2012 Robert F. Heile, ZigBee AllianceSlide Organization Chart WG Chair Bob Heile, ZigBee Alliance Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting Task Groups Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing Working Group Technical Editor James Gilb New Projects (WNG), Interpretations, Rules Pat Kinney, Kinney Consulting TG4j MBAN 15.4 PHY Ray Krasinski, Philips Chair TG8 Peer Aware Communcations Miung Lee, CUNY Chair TG4k Low Energy Critical Infrastructure Pat Kinney, Kinney Consulting Chair TG9 Key Management Protocol Robert Moskowitz, Verizon Chair Study Groups/Interest Groups TG4m 15.4 TV White Space PHY Sangsung Choi, ETRI Chair TG4n 15.4 China MBAN PHY Art Astrin, Astrin Radio Chair TG4p 15.4 Positive Train Control (PTC) Chair: Jon Adams, Lilee Systems Chair Study Groups: 15.4 Ultra Low Power (ULP) Chair: Shahriar Emami, Samsung Interest Groups Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Engineering Laboratories TeraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig Visible Light Comm follow-on (LED) Chair: Yeong Min Jang Kookmin University Layer 2 Routing (L2R) Chair: Clint Powell To add your name to the WG/TG/SG/IG reflectors please go to
doc.: IEEE Submission July 2012 Robert F. Heile, ZigBee AllianceSlide 3 San Diego Session Objectives July 15-21, 2012 TASK GROUP-4j MBAN PHY Amendment 1.Comment Resolution 2.Update Project Plan/Timeline TASK GROUP-4k Low Energy Critical Infrastructure Monitoring 1.Final first draft for Letter Ballot 2.Update Project Plan/Timeline TASK GROUP-4m : TVWS PHY for 15.4 (4TV) 1.Review responses to CFP 2.Update Project Plan/Timeline
doc.: IEEE Submission July 2012 Robert F. Heile, ZigBee AllianceSlide 4 San Diego Session Objectives July 15-21, 2012 TASK GROUP4n –China MBAN 1.Review response to the CFA 2.Update Project Plan/Timeline TASK GROUP-4p Positive Train Control 1.Review preliminary technical proposals 2.Update Project Plan/Timeline TASK GROUP-8 Smart Utility Networks 1.Work on Application Matrix and Technical Guidance Document 2.Update Project Plan/Timeline
doc.: IEEE Submission July 2012 Robert F. Heile, ZigBee AllianceSlide 5 San Diego Session Objectives July 15-21, 2012 TASK GROUP 9 –Key Management Protocol: 1.Work on draft 2.Update Project Plan/Timeline Study Group: 15.4 Ultra Low Power Amendment 1.Work draft PAR on 5C- target for Nov Spectrum Resource Use (SRU) Interest Group: 1.Hear Contributions 2.Discuss future of the Committee
doc.: IEEE Submission July 2012 Robert F. Heile, ZigBee AllianceSlide 6 San Diego Session Objectives July 15-21, 2012 THz Interest Group: 1.Hear Contributions 2.Discuss future of the Committee Visible Light Comm follow-on(LED) Interest Group: 1.Hear Contributions 2.Discuss future of the Committee Layer 2 Routing (L2R) Interest Group: 1.Hear Contributions 2.Discuss future of the Committee
doc.: IEEE Submission July 2012 Robert F. Heile, ZigBee AllianceSlide 7 NEW PROJECTS SUBCOMMITTEE 1.Report on WNG progress 2.Hear new presentations San Diego Session Objectives July 15-21, 2012
doc.: IEEE Submission July 2012 Robert F. Heile, ZigBee AllianceSlide 8
doc.: IEEE Submission San Diego Session Results July 2012 Robert F. Heile, ZigBee AllianceSlide 9
doc.: IEEE SubmissionRaymond Krasinski, PhilipsSlide 10 IEEE j Task Group Medical Body Area Networks Ray Krasinski, Philips Chair Closing Report 10 th Meeting of the MBAN Task Group San Diego, CA July 15-20, 2012 Jul 2012
doc.: IEEE Submission Scope of MBAN Task Group Draft an amendment of for MBAN –This amendment defines a physical layer for IEEE in the 2360 to 2400 MHz band which complies with Federal Communications Commission (FCC) MBAN rules. This amendment defines modifications to the MAC needed to support this new physical layer. Slide 11Raymond Krasinski, Philips Jul 2012
doc.: IEEE Submission Accomplishments for July Meeting Resolved all remaining comments received in response to Letter Ballot Discussion with IEEE –Participation by TG4n and members TG vote to ask WG to start Recirculation –And form BRC Slide 12Raymond Krasinski, Philips Jul 2012
doc.: IEEE Submission TG4J motion 1 Slide 13 Approve the resolution of all comments of: j-lb81-comment-register related to Subclause 5 and Subclause 6 as resolving comments on d1P j_Draft_Standard. Moved: Dave Evans Second: Paul Chilton Vote: Approved by Unanimous Consent Jul 2012 Raymond Krasinski, Philips
doc.: IEEE Submission TG4J motion 2 Slide 14 That j Task Group approves d j_Draft_Standard.pdf and requests that WG recirculate d j_Draft_Standard.pdf. Moved: Dave Evans Second: Liang Li Vote: Approved by Unanimous Consent Jul 2012 Raymond Krasinski, Philips
doc.: IEEE Submission TG4J motion 3 Slide 15 Move that the j Task Group seek WG approval of the formation of a Ballot Resolution Committee for the Recirculation Letter Ballot of d2P j_Draft_Standard. The committee will be chaired by Ray Krasinski. Moved: Dave Evans Second: Art Astrin Vote: Approved by Unanimous Consent Jul 2012 Raymond Krasinski, Philips
doc.: IEEE Submission WG motion 1 Slide 16 Move that the WG approve the start of a recirculation ballot to forward the d j_Draft_Standard.pdf to Sponsor Ballot. Moved: Liang Li Second: Ray Krasinski Vote: Jul 2012 Raymond Krasinski, Philips
doc.: IEEE Submission WG motion 2 Slide 17 Move to authorize Raymond Krasinski, David Evans, Shannon Park, Suhwook Kim, James Gilb, and Paul Chilton as the j Ballot Resolution Committee chaired by Raymond Krasinski; said committee to expire at the beginning of the September Wireless Interim Session. The Ballot Resolution Committee is authorized to approve the resolutions to comments received from recirculation of the 15.4j draft and to approve the start of another recirculation of the 15.4j draft on behalf of the Working Group. Comment resolution on Recirculations between sessions will be conducted via reflector and via teleconferences announced to the reflector at least 7 days in advance. Moved: Dave Evans Second: Art Astrin Vote: Jul 2012 Raymond Krasinski, Philips
doc.: IEEE Submission TG4J Schedule Slide 18Raymond Krasinski, Philips Jul 2012 Proposal Effort –Call for ProposalsMar 2011 –Preliminary ProposalsMay 2011 –Final ProposalsJuly 2011 –Begin Draft AmendmentNov 2011 Drafting –Preliminary draft AmendmentJan 2012 Balloting –Letter ballotMar 2012 –Comment ResolutionMay 2012 –Recirculation I (& 2)Jul 2012 –Sponsor BallotSep 2012
doc.: IEEE Submission Plan for Sept Meeting Resolve all comments received in response to recirculation of Letter Ballot Move to Sponsor Ballot Slide 19Raymond Krasinski, Philips Jul 2012
doc.: IEEE SubmissionPat Kinney, Kinney ConsultingSlide 20 IEEE k Task Group Low Energy Critical Infrastructure Monitoring Pat Kinney, Kinney Consulting Chair Closing Report San Diego, CA July 15-20, 2012 Jul 2012
doc.: IEEE Submission, Slide 21 TG4k PAR Scope of Proposed Standard This standard is an amendment to IEEE It addresses principally those applications such as critical infrastructure monitoring. It defines an alternate PHY and only those MAC modifications needed to support its implementation. The amendment supports: Operation in any of the regionally available licensed, license exempt, and special purpose frequency bands. Simultaneous operation for at least 8 co-located orthogonal networks Application data rate of less than 40 kbits per second Propagation path loss of at least 120 dB > 1000 endpoints per mains powered infrastructure Asymmetric application data flow Extreme difference in capabilities and performance between endpoint devices and coordinating devices (collectors) –Coordinator may support all standardized modulations (MCS) and data rates –Coordinator may be required to support antenna diversity or antenna beam steering –End point must be able to conserve energy Reliable operation in dramatically changing environments (no control over environment). This amendment also provides mechanisms that enable coexistence with other systems in the same band(s) including IEEE , , and systems
doc.: IEEE Submission, Slide 22 Purpose of Proposed Standard The purpose of this amendment is to facilitate point to multi-thousands of points communications for critical infrastructure monitoring devices. The amendment addresses the application’s user needs of minimal network infrastructure, and enables the collection of scheduled and event data from a large number of non-mains powered end points that are widely dispersed, or are in challenging propagation environments. To facilitate low energy operation necessary for multi-year battery life, the amendment minimizes network maintenance traffic and device wake durations. In addition, the amendment addresses the changing propagation and interference environments.
doc.: IEEE Submission, Slide 23 Meeting Goals (Agenda ) Review preliminary draft document Review and resolve comments from preliminary draft review Review coexistence document Resolve comments from coexistence review Joint meeting with Coexistence Motion to approve preliminary draft, edited as per comment resolution document, as k draft Motion to request WG to ballot k draft
doc.: IEEE Submission Overview of 437 Comments ( ) Clause 31 Clause 431 Clause 5200 Clause 671 Clause 820 Clause 913 Clause 1983 Annex D3 Annex P15, Slide 24
doc.: IEEE Submission TG4k Schedule Proposal Effort –Final ProposalsSep 2011 –Adopt BaselineNov 2011 Drafting –Circulate preliminary document for comments May 2012 –Final draft editing (ready for WG Letter Ballot)July 2012 Ballot Comment Resolution –Letter ballot comment resolutionSep/Nov 2012 –Recirculation I comment resolutionJan 2013 –Recirculation II comment resolutionMar 2013 –Recirculation III comment resolutionMay 2013 –Sponsor Ballot (release draft for ballot)July 2013 –SB Recirculation I comment resolutionSep 2013 –SB Recirculation II comment resolutionNov 2013, Slide 25
doc.: IEEE Submission TG4k Motions TG4k approves the resolutions contained in document and empowers the technical editor to modify as per the resolutions, posting the modified document as d1P k_Draft_Standard, to the members only site. TG4k requests that the WG approve d1P k_Draft_Standard for Letter Ballot upon completion of edits, Slide 26
doc.: IEEE SubmissionSlide 27 July 2012 TG4m 4TV Closing Report for July 2012 Sangsung Choi, Chair (ETRI) Sangsung Choi(ETRI)
doc.: IEEE Submission Meeting Goal This Week Slide 28 July 2012 Hear final proposal presentations Hear technical presentations if any Discuss merging process Discuss timeline and next steps
doc.: IEEE Submission Meeting Slots July 2012 Sangsung Choi(ETRI) Slide 29 MtgMondayTuesdayWednesdayThursday AM1 Hear PHY Proposals AM2 Hear PHY Proposals PM1 Opening Logistics Hear Presentation Hear MAC Proposals Panel Discussion PM2 Hear presentations if any Hear MAC Proposals Hear presentations if any Discuss Merging Process Discuss Next Step
doc.: IEEE Submission TG4m Closing Report(1) Heard 8 final proposals - 4 PHY & 4 MAC Proposals Slide 30 July 2012 NoDoC #TitleProposer(Affiliation) ETRI OFDM PHY Proposal for TG4mCheol-ho Shin(ETRI) ETRI FSK PHY Proposal for TG4m Mi-Kyung Oh(ETRI) Full Proposal on PHY for IEEE m Hiroshi Harada(NICT) PHY Proposal to TG4m Cristina Seibert(SSN) PHY Proposal for the IEEE m Sasaki(Niigata Univ.) Proposed Approach for MAC changes for TVWS Benjamin A. Rolfe(BCA) IEEE m MAC Proposal: TVWS Multi-Channel Utilization (TMCU) Youngae Jeon(ETRI) MAC proposal for supporting the TVBD Network Seong-Soon Joo(ETRI) Full Proposal on MAC for IEEE m Hiroshi Harada(NICT)
doc.: IEEE Submission TG4m Closing Report(2) Heard 2 Presentations - The Usage of Polarized Antenna System(Kyunghee Chang/Inha University) - Discussion to facilitate expediting the selection of the PHY specification in TG4m(Daniel Popa/ITRON) Slide 31 July 2012 Discuss Merging Process - 3 Sub-Groups: FSK PHY, OFDM PHY, NB-OFDM PHY, MAC - Merge proposals before Sep. meeting - Present & discuss merged proposals, and agree baseline during Sep. meeting
doc.: IEEE Submission Future Plan/Timeline(1) Form a New Task Group - Affirm new officers for TG4m September, Prepare TGD November, Completed TGD March, 2012 Proposal Effort - Call for Preliminary Proposals May, Present Preliminary Proposal May, Call for Final Proposals July 9, Present Final Proposals July, Present & Discuss merging proposals September, Adopt Baseline September, 2012 July 2012 Sangsung Choi(ETRI) Slide 32
doc.: IEEE Submission Future Plan/Timeline(2) D rafting - Editors create first draft November Discuss & edit draft January 2013, March Final draft (ready for WG Letter Ballot) May 2013 Balloting - Letter ballot July Recirculation September, November 2013, January Sponsor ballot March 2014 July 2012 Sangsung Choi(ETRI) Slide 33
doc.: IEEE Submission IEEE TG4n Chinese Medical Band Art Astrin, Chair Astrin Radio Closing Report 2 st Meeting as a Task Group 4n San Diego, CA July 19, 2012 Slide 34
doc.: IEEE Submission Slide 35 Since May meeting Issued First Call for Applications
doc.: IEEE Submission Meeting Accomplishments Heard 6 Presentations Had discussions about the Chinese medical bands Reviewed IEEE Reviewed and updated the TG4n web page Slide 36
doc.: IEEE Submission n-Interferences-on-frequency-bands-of-IEEE n n-wban-based-micro-electronic-neural-bridge n-Complex-EM- Environment-in-Chinese-Hospitals n-Human-Physiological-Parameter-Monitoring n-cwpan-cban-actives-in n-overview-of-i2r-s-wireless-transceiver-design-for- mban-activities Contributions Slide 37
doc.: IEEE Submission Will issue Second Call for Applications: n-call-for-applications Next Steps Slide 38
doc.: IEEE Submission Timeline 2012 Slide TaskCommentsMayJulySeptNov Draft call for Applications X Issue Call for Applications X Application Submission Period XX Draft Call for Tech Requirement X Issue Call for Tech Requirement X Tech Requirement Submission Period XX Draft Call for Proposals
doc.: IEEE Submission Slide 40 PAR and 5C PAR: n-PAR Approved March C: n-Chinese-MBAN-Body-Area-Network-5C
doc.: IEEE Submission Thank You ! Any Questions ? Slide 41
doc.: IEEE Submission July 2012 Jon Adams, Lilee SystemsSlide 42 IEEE p Positive Train Control Task Group Closing Report 19 July 2012 Jon Adams, Chair Lilee Systems Ltd.
doc.: IEEE Submission 90 Participants from 60+ Entities Herzog TI GuardRFID Inha University OneAccess Networks Meiji University ARINC Siemens US DOT Sunrise Micro US DOT FTA Samsung Information Systems America The Ohio State University Electronics and Telecommunications Research Institute US DOT Volpe Safetran (Invensys Rail) Union Pacific RR LG Electronics Notor Research Semtech Noblis Tohoku University REIC Beijing Univ of Posts and Telecommunications NXP Verizon Authentec Sensus TU Braunschweig Via Technologies Halcrow US DOT FRA Philips Astrin Radio China Academy of Telecomm Research Gannett Fleming GE APTA Semaphore Group Anritsu Oki July 2012 Jon Adams, Lilee SystemsSlide 43 CalAmp Rail Safety Consulting Institute for Infocomm Research National Taiwan University Qualcomm Freescale Kyocera Interdigital Tensorcom Analog Devices CSX National Technical Systems Parsons Brinckerhoff Stantec Bombardier Transportation Rohde and Schwarz Korea Railroad Research Institute Lilee Systems Parsons The Boeing Company Vinnotech Yokogawa Sony
doc.: IEEE Submission About Positive Train Control Positive Train Control systems designed to prevent: –Train-to-train collisions –Overspeed derailments –Unauthorized incursions into work zones –Movement through improperly configured track switch PTC systems are designed to mitigate error by human operators Comprised of four subsystems –Locomotive segment –Wayside segment –Back office segment –Communications segment IEEE p –Adds vehicular mobility to –Initial application is interoperable communications between Train and Wayside Train and Network Infrastructure Wayside and Network Infrastructure July 2012 Jon Adams, Lilee SystemsSlide 44 Communications Segment Locomotive Wayside Office
doc.: IEEE Submission Meeting Highlights Presentations – , Security Device Identities for transit – , Use of DSRC band for PTC – , Preliminary Technical Proposal for PTC Joint Meeting with to discuss DSRC band regulatory considerations Special guests –Mr. Louis Sanders, Technical Director of the American Public Transportation Association (APTA) –Mr. Satoshi (Sam) Oyama, Senior Researcher in Intelligent Transportation Systems, ARIB July 2012 Jon Adams, Lilee SystemsSlide 45
doc.: IEEE Submission 15.4p Meeting Objectives 6 Time Slots Discuss technical proposal process and the Technical Guidance Document ( ) Preliminary technical presentations Informative presentations Continue to flesh out schedule moving toward completed standard July 2012 Jon Adams, Lilee SystemsSlide 46
doc.: IEEE Submission IEEE p PTC Schedule Study Group Approval of Study GroupNov 2011 Completion of PAR/5C DocsJan 2012 Approval of PAR/5C DocsJan 2012 Preparation for Task Group Phase –Call for ApplicationsDec 2011 –Extension of Call for ApplicationsMar 2012 –Approval by NESCOM and 802 EC of IEEE p TGApr 2012 Task Group Proposal Effort –Technical Guidance DocumentMay 2012 –Call for ProposalsMay 2012 –Preliminary ProposalsJuly 2012 –Final ProposalsSep 2012 –Adopt BaselineNov 2012 Drafting –Preliminary specification draftJan 2013 –Final draft (ready for WG Letter Ballot)Mar 2013 Jon Adams, Lilee SystemsSlide 47 July 2012
doc.: IEEE Submission PAC Closing Report Myung Lee, Chair CUNY July 19, 2012 Myung Lee, CUNYSlide 48
doc.: IEEE Submission Meeting Objectives Presentations on application and use cases Development of Applications Matrix Development of Technical Guidance Document (TGD) Project Plan Myung Lee, CUNYSlide 49
doc.: IEEE Submission Achievements 7 time slots at this meeting 10 Presentations on Application Matrix & Technical Guidance Document (TGD) –Jong Taek Oh (Hansung U): Doc r0 –Eldad Zeira (InterDigital): Doc r0 –Marco Hernandez (NICT): Doc r0 –Robert Moskowitz (Verizon): Doc r0 –Marco Hernandez (NICT): Doc r0 –Eldad Zeira (InterDigital): Doc r0 (TGD) –Igor Dotlic (NICT) : Doc –Seunggeun Jin (ETRI): Doc. 350r2 (Application matrix) –Byung-Jae Kwak (ETRI): Doc. 411r0 –Seunghoon Park (Samsung): Doc. 385r1 (TGD) Drafted First versions of Application Matrix (AM) and Technical Guidance Document (TGD) TG8 Web page established Myung Lee, CUNYSlide 50
doc.: IEEE Submission Timeline TG formation Mar 12 Call for Application April 12 Application presentation May 12 TGD approval/Call for proposal Sep 12 Preliminary proposal presentation Nov 12 Final proposal presentation Jan 13 PAC Framework Document/Call for contribution May 13 Contribution presentation July 13 Draft spec (P D1.0) complete/Letter Ballot Mar 14 LB Comment resolution/ LB recirculation May 14 Sponsor Ballot Jan 15 RevCom submission July 15 Slide 5 Slide 51Myung Lee, CUNY
doc.: IEEE Submission TG8 PAC Officers Chair: Myung Lee (CUNY) Vice Chair: Huan-Bang Li (NICT), Suhwook Kim (LGE) Editors: Shannon Park (Samsung), Sunggeun Jin (ETRI ) Secretary pro tem Chanho Yoon (ETRI) Myung Lee, CUNYSlide 52
doc.: IEEE Submission Plan for Palm Springs Teleconference before September meeting –Teleconf. bridge provided by LGE –International: Access code: –1 st teleconference: August 21 (Tuesday), US EST US EST 8:00pm, 5:00pm PST, Japan, Korea: 9:00am, China: 8:00am Review of AM and TGD –2 nd teleconference September 5 (Wednesday), US EST US EST 9:00am, PST 6:00am, Japan, Korea, 10:00 pm, China 9:00pm. Final review of AM and TGD Preparation of September F2F meeting At September Meeting (8 time slots) –Completion of Application Matrix (AM) and Technical Guidance Document (TGD) –To Issue the Call for Proposals (CFP) Myung Lee, CUNYSlide 53
doc.: IEEE SubmissionRobert Moskowitz, VerizonSlide 54 IEEE Task Group Key Management Protocol Bob Moskowitz, Verizon Chair Closing Report San Diego, CA July 15-20, 2012 Jul 2012
doc.: IEEE Submission July 2012 Robert Moskowitz, VerizonSlide 55 Accomplishments of the July Meeting Refine KMP Transport mechanism – Work on Trigger events Work on draft document Inform LED ID Interest Group of work for Joint session with Security workgroup In depth discussions on use cases
doc.: IEEE Submission July 2012 Robert Moskowitz, VerizonSlide 56 Planning for September Meeting 3 sessions Anticipate progress on Technical Editor position Technical presentations
doc.: IEEE SubmissionPat Kinney, Kinney ConsultingSlide 57 IEEE q Study Group Ultra Low Power Shahriar Emami, Samsung Chair Closing Report San Diego, CA July 15-20, 2012 Jul 2012
doc.: IEEE Submission July 2012 Shahriar Emami, SamsungSlide 58 July Closing Report for ULP SG (1/6) Number of meetings slots: 4 Total Number of contributions: 5 Participation: Tuesday (23)- Wednesday (10)
doc.: IEEE Submission July 2012 Shahriar Emami, SamsungSlide 59 July Closing Report for ULP SG (2/6) Meeting Activities: - Hear presentations - Work on PAR and 5C
doc.: IEEE Submission July 2012 Shahriar Emami, SamsungSlide 60 July Closing Report for ULP SG (3/6) Contributions: Document # Document # Document # Document # Document #
doc.: IEEE Submission July Closing Report for ULP SG (4/6) Accomplishments - Heard all 5 presentations - Prepared PAR and 5C drafts July 2012 Shahriar Emami, SamsungSlide 61
doc.: IEEE Submission July Closing Report for ULP SG (5/6) Conference Calls - August 9, pm-8 pm PST - August 23, pm-8 pm PST July 2012 Shahriar Emami, SamsungSlide 62
doc.: IEEE Submission July Closing Report for ULP SG (6/6) Plan for September Meeting - Hear presentations on technical requirements - Finalize PAR and 5C July 2012 Shahriar Emami, SamsungSlide 63
doc.: IEEE SubmissionPat Kinney, Kinney ConsultingSlide 64 IEEE TeraHertz Interest Group Thomas Kürner, TU Braunschweig Chair Closing Report San Diego, CA July 15-20, 2012 To be Provided Jul 2012
doc.: IEEE Submission July 2012 Shoichi Kitazawa, ATRSlide 65 IEEE IG SRU Shoichi Kitazawa, ATR Chair 6 th Meeting Closing report San Diego, CA 19 July, 2012
doc.: IEEE Submission Draft plan of IG SRU schedule Goal: To summarize informative ideas to judge to establish SG. Meeting Schedule: Every plenary meeting or required based upon contributions. IG output: Technical documents of Better Use of Spectrum Resources in WPANs. July 2012 Shoichi Kitazawa, ATRSlide 66
doc.: IEEE Submission July 2012 Shoichi Kitazawa, ATRSlide 67 Agenda Items for the Week Approve meeting minutes. Presentations –IG SRU technical document ( r1) Other business items –Next step –Call for contributions –Schedule Report on progress to WG
doc.: IEEE Submission July 2012 Shoichi Kitazawa, ATRSlide 68 Accomplishment for the meeting IG SRU 6th meeting was called to order 18 July 2012 at 08:20 and finished at 09:30. –9 Attendee –Approve meeting agenda ( r1) –Approve meeting minutes ( r0) Presentation –IG SRU technical document ( r1) Discussion –Scope of IG SRU and next step –Call for contributions –Next meeting
doc.: IEEE Submission Plans for November Meeting Hearing presentation. Editing Technical document. Discussion July 2012 Shoichi Kitazawa, ATRSlide 69
doc.: IEEE Submission July 2012 Yeong Min Jang, Kookmin UniversitySlide 70 LED-ID Interest Group Yeong Min Jang, Kookmin University Chair 2 nd Meeting, Atlanta Closing Report 20 July, 2012 doc.: IEEE led
doc.: IEEE Submission Purpose of LED Interest Group Determine whether there is sufficient interest in creating a LED Study Group for the purpose of developing a LED PAR 5C. July 2012 Yeong Min Jang, Kookmin UniversitySlide 71 doc.: IEEE led
doc.: IEEE Submission Objective of Meeting Call for presentation of LED Hearing of presentations of LED issues July 2012 Yeong Min Jang, Kookmin UniversitySlide 72 doc.: IEEE led
doc.: IEEE Submission July 2012 Yeong Min Jang, Kookmin UniversitySlide hour time slot was held in Wednesday. - Attendance: 12 attendees in Wednesday AM1 slot. 3. Relative Documents: - Presentations led Secure Device Identities led Standardization Directions in IEEE IG-LED led Technical Issues for LED commercialization led LED-based Hybrid Techniques for High-performance Positioning Systems led IEEE IG-LED Beamforming doc.: IEEE led
doc.: IEEE Submission Plans for November Meeting July 2012 Yeong Min Jang, Kookmin UniversitySlide 74 Before Nov. meeting: generate and circulate a “call for presentation and participation” paragraph During Nov. meeting: continue discussion to determine market focused technical objectives of the IG Invite many interested parties doc.: IEEE led
doc.: IEEE SubmissionSlide 75 Layer 2 Routing- Interest Group Closing Report for July 2012 Clint Powell, Powell Wireless Commsulting, LLC Chair
doc.: IEEE SubmissionSlide 76 IG-L2R Determine the level of interest for a project on Layer 2/Mesh Under Routing and make recommendation to WG.
doc.: IEEE SubmissionSlide 77 Determine Interest Level of Layer 2/Mesh Under Routing Timeslots Wed. AM1 Open and Review Call for Interest/Presentations Hear 3 Presentations incl. Q&A Thurs. AM1 Discuss Next Steps Formulate Recommendation to WG Meeting Goals
doc.: IEEE SubmissionSlide 78 Avg. # of Individuals Attending sessions: 30 Avg. # of Entities Represented in sessions: 22 IG-L2R Group Participation
doc.: IEEE SubmissionSlide 79 Minutes posted as doc. # l2r Overwhelming consensus to recommend to WG to continue as an Interest Group at next mtg. Straw Poll #5 (28 in room) Recommend to Working Group to continue as an IG? YES: 22 NO: 0 Abstain: 5 New to room*: 5 *Was not in Wed. AM1 IG L2R Session Status
doc.: IEEE SubmissionSlide 80 Palm Springs (in Sept.) Issue call for Interest/Presentations for Sept. mtg. Expand topical area per mins. Related work in other areas Work on generating and giving a Tutorial (at next Interim or Plenary) See mins. (doc. # l2r) for details Next Steps
doc.: IEEE SubmissionSlide 81July 2012 Pat Kinney, Kinney Consulting LLC Standing Committee Closing Reports WNG & Maintenance Advisory Group (MAG) July 2012 Pat Kinney, Kinney Consulting LLC Chair
doc.: IEEE Submission Standing Committees The SC WNG meeting had one presentation: Dependable Wireless M2M Network for Controlling - Applications for Cars, Energy, Medicine, Cities ( ) by Dr. Ryuji Kohno (Yokohama National University) SC Maintenance: Meeting objectives were to review the web site, review the request form, and define a process for this committee Pat Kinney, Kinney Consulting LLC Slide 82July 2012
doc.: IEEE Submission Dependable Wireless M2M Network Dependability in network” means to guarantee lowest performance enough high in a sense of highly reliable, safe, secure, fault tolerant, robust services in any predictable and even unpredictable worse environments Demand for Dependable Networks –Need for Highly Reliable, Robust Communications for Controlling –Transition from Human centric communications to Machine-to-Machine (M2M) communications. –Highly reliable, safe, secure and robust communications for M2M Controlling is necessary –Integrated wired & wireless networks provide dependable, green and ecological networks adaptable for environment. Emotion and Sustainability –Medicine, Robot, ITS, Energy Supply, and Manufacturing require more dependability in controlling network, integrated circuit, link in micro devices. –Medical equipment and industrial products need long life time, fault tolerance. –Dependable Network Architecture for M2M controlling. Pat Kinney, Kinney Consulting LLC Slide 83July 2012
doc.: IEEE Submission SC WNG Actions Straw Poll: How many companies have an interest on this activity? Count was 31 Do we establish an interest group or a study group within to discuss it? Support for IG was 18 with 5 for study group Given the interest and the expected participation an interest group will be formed at the closing plenary if an IG chair can be named (perhaps Dr. Kohno?) Pat Kinney, Kinney Consulting LLC Slide 84July 2012
doc.: IEEE Submission SC Maintenance Web site and request form were reviewed and approved Process was defined using maintenance as a baseline, and will be included in the Operations Manual –Revised Operations Manual to be voted on next session –Committee size will be 5 – 7, selected by WG chair –Committee will maintain maintenance database and make recommendations to WG Pat Kinney, Kinney Consulting LLC Slide 85July 2012
doc.: IEEE Submission July 2012 Robert F. Heile, ZigBee AllianceSlide 86 Upcoming Sessions September 16-21, 2012, Hyatt Grand Champion, Palm Springs, CA, USA, 802 Wireless Interim Session November 11-16, 2012, Grand Hyatt San Antonio, San Antonio, TX, USA, 802 Plenary Session. January 13-18, 2013, Hyatt Regency Vancouver, BC, CA, 802 Wireless Interim Session* March 17-21, 2013, Caribe Royale, Orlando, FL, USA, 802 Plenary May 12-17, 2013, Hilton Waikoloa Village, Big Island, HI, USA, 802 Wireless Interim Session* July 14-19, 2013, Geneva, CHE, 802 Plenary Session.