Incoming instruments. New instruments IMACS MOEMultiobject echellette LDSS upgradeMultiobject optical spectroscopy CorMASSLow-res visiting NIR spectrograph.

Slides:



Advertisements
Similar presentations
Geminis Future AO Program A Decade of AO Evolution at Gemini Recent AO Program Highlights Doug Simons Gemini Observatory.
Advertisements

Subaru AO in future. Outline Overview of AO systems at Mauna Kea and in the world. Ongoing plan of AOS at Subaru and Mauna Kea. What’s in future.
GLAO instrument specifications and sensitivities
NIR INSTRUMENT FOR GLAO Takashi Hattori, Iwata Ikuru (Subaru Telescope)
The ARC 3.5 Meter Telescope The 2.5 Meter Sloan Telescope The 0.5 Meter ARCSAT Telescope The 1.0 Meter NMSU Telescope Apache Point Observatory Latitude.
RASC, Victoria, 1/08/06 The Future of Adaptive Optics Instrumentation David Andersen HIA.
Observational techniques meeting #7. Detectors CMOS (active pixel arrays) Arrays of pixels, each composed on a photodetector (photodiode), amplifier,
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Thermal Infrared Observation using Adaptive Secondary Mirror (ASM) Hiroshi TERADA (Subaru Telescope)  Ground-based Thermal IR w/AO  Subaru Thermal IR.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
PILOT: Pathfinder for an International Large Optical Telescope -performance specifications JACARA Science Meeting PILOT Friday March 26 Anglo Australian.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
AURA New Initiatives Office S.C. Barden, M. Liang, K.H. Hinkle, C.F.W. Harmer, R.R. Joyce (NOAO/NIO) September 17, 2001 Instrumentation Concepts for the.
NGAO Instrumentation Cost Drivers and Cost Savings September 2008 Sean Adkins.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
NGAO Instrumentation WBS Replan By Sean Adkins April 25, 2007.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
TMT Instrumentation Canadian capabilities and interests David Loop, NRC-HIA June 26, 2010.
SOFIA — The Observatory open cavity (door not shown) TELESCOPE pressure bulkhead scientific instrument (1 of 7) Scientist work stations, telescope and.
Next generation wide field AO (GLAO) and NIRMOS for Subaru Telescope.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
U NIVERSITY of C ALIFORNIA O BSERVATORIES LICK · KECK · TMT University of California Observatories Director: Michael Bolte (UCSC) Associate Director: Ian.
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
Magellan Director Report Personnel Observing Statistics Instrument Commissioning Instrument Development Fast Internet Connection Publications (A. Uomoto)
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
DL – IFU (Prieto/Taylor) Slicer: –25mas sampling … 0.9mm slices ~f/250 (assuming no anamorphism) Detector = 2k array of 18um pixels –Slit subtends 1-pixel.
Tomographic reconstruction of stellar wavefronts from multiple laser guide stars C. Baranec, M. Lloyd-Hart, N. M. Milton T. Stalcup, M. Snyder, & R. Angel.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
Magellan technical updates, Pasadena April 2006 – September 2006.
NEXT GENERATION OPTICAL SPECTROGRAPH FOR NOAO Samuel Barden, Charles Harmer, Taft Armandroff, Arjun Dey, and Buell Jannuzi (National Optical Astronomy.
Ground Layer AO at ESO’s VLT Claire Max Interim Director UC Observatories September 14, 2014.
KMOS Instrument Overview & Data Processing Richard Davies Max Planck Institute for Extraterrestrial Physics  What does KMOS do?  When will it do it?
Opto-Mechanics for SNAP at UM
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Existing instruments Future Instruments.
The Active Optics System S. Thomas and the AO team.
Technology Development for ELTs Doug Simons GSMT SWG April 28, 2003.
ALTAIR: Access to Large Telescopes for Instruction and Research Chair: Larry Ramsey (14 members, 8.5L, 2S, 3.5U) Report: Submitted Mar 9, 2009
Magellan F/5 Status Eavesdropping PISCO Andrew Szentgyorgyi 25 Apr 2011/Pasadena 4/25/111Magellan SAC/Pasadena.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Some Thoughts on Ground Layer Adaptive Optics & Adaptive Secondary Mirrors for Keck P. Wizinowich 9/15/14 1.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
SAC Report Povilas Palunas 2/23/ Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Pasadena Updates March February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.
MMIRS Status A.Szentgyorgyi/SAO 30 April Imaging 7 x 7 arcmin FOV 0.2 arcsec pixels Y,J,H & K wavelength coverage Spectroscopy Multislit (4’ x 7’)
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
GMT’s Near IR Multiple Object Spectrograph - NIRMOS Daniel Fabricant Center for Astrophysics.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
SAC Meeting 24 Sept 2006 FIRE Status Report F F olded port I I nfra- R R ed E E chellette MIT Rob Simcoe Adam Burgasser Paul Schechter U. Michigan Rebecca.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
F/5 telescope work Secondary mirror polishing (SOML) Secondary mount support controls Active optics controls Flat field screen & lamps Telescope baffles.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
SOFIA — The Observatory
Jay Elias1 1plus bits plagiarized from Steve Heathcote and others
Keck Observatory Status
Pyramid sensors for AO and co-phasing
Magellan Status Report March 19, 2016 Carnegie Observatories
Adaptive optics Now: Soon: High angular resolution
An IFU slicer spectrometer for SNAP
User instrument policy
IRMOS / MOAO Architecture Options
Presentation transcript:

Incoming instruments

New instruments IMACS MOEMultiobject echellette LDSS upgradeMultiobject optical spectroscopy CorMASSLow-res visiting NIR spectrograph GLAO guiderGround layer AO sensors F/5 secondary mirrorMMT clone F/5 bafflesOK, not an instrument

New instruments (cont’d) F/5 wavefront sensorsShack-Hartmann camera F/5 WFCWide field corrector and ADC MagEOptical echellette PFSPlanet finding spectrograph (user) MegacamWide field F/5 imager MMIRSMultiobject NIR spectrograph

New instruments (cont’d) PISCOMultiband optical imager (user) IMACS GISMOMultiobject image slicing IFU FourStar4K x 4K NIR imager IR EchelletteNIR echellette (H2RG) F/11 AO secondaryGregorian AO mirror MIRAC4Mid-IR imager

How many? Without retirements, 17 facility instruments With staffing appropriate for today’s operation, six facility instruments plus a few user instruments is possible Develop a plan for instrument deployment and retirement

F/5 system components Secondary mirror Baffles Wide field corrector Wavefront sensor Megacam MMIRS

F/5 commissioning Expect a few weeks of engineering to get everything working Plus a bit more, because of switchover times A few extra people on site for commissioning work

F/5 operations Changeover can be handled by Magellan staff Visiting instruments (Megacam, MMIRS) present additional support requirements Visiting support scientists come with the instrument?