I-5 North Coast Corridor. I-5 North Coast Corridor FREQUENTLY ASKED QUESTIONS Are we “only” expanding the freeway? Why widen the freeway? Are we just.

Slides:



Advertisements
Similar presentations
IMPLEMENTATION OF THE STANDARD GAUGE IN THE MEDITERRANEAN CORRIDOR. Cartagena- French border.
Advertisements

Client logo MnDOT - ACEC/MN Annual Conference Creating Multimodal Connections Facilitator Patrick Watz, AECOM March 5, 2013.
Performance Measures CTP 2040 Policy Advisory Committee August 19, 2014.
Mid-Atlantic Rail Operations Study -- Benefit Assessment Presented by: Jack Lettiere, Commissioner New Jersey Department of Transportation Presented to:
March 7, 2012 North Coast Corridor Program Overview Caltrans External Advisory Liaison April 16, 2013.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
America’s intercity provider
Colorado Rail Passenger Association Spring Meeting June 1, 2013.
NCTD/SANDAG Project Update Capital Improvement Program Bill Prey, P.E., LOSSAN Corridor Director San Diego Association of Governments RELATED TO AGENDA.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
OCBC Infrastructure Committee April 8, 2014 LOSSAN Rail Corridor Update Jennifer Bergener – Managing Director, LOSSAN JPA.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
Overview CMAA May 29, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Dan O’Neal, Chairman Washington State Transportation Commission.
Subcommittee on Rail Transportation
Freight Action Strategy for the Everett-Seattle-Tacoma Corridor February 2003.
1 Passenger Rail Solutions – Balanced Approach 2009 Ark-La-Tex Rail Summit May 9, 2009 – Marshall, TX Joe Adams, Vice President – Public Affairs.
System Management and Operations System Development and Design Growth and Development Plan Components E AST -W EST G ATEWAY.
California Freight Advisory Committee May 14, 2014.
CSSC Regional Rail Partners, September 18, 2012 Chesapeake Connector : Freight and Passenger Rail Benefits Study.
Comprehensive Freight Movement Plan Pennsylvania Rail Freight Seminar May 22, 2013 Pennsylvania Long Range Transportation Plan Pennsylvania Long Range.
1 SCORT 2010 September 21, 2010 David Valenstein Federal Railroad Administration State Rail Planning.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
1 Salt Lake City Gateway Area Railroad Consolidation Project Grant G. Schultz, Ph.D., P.E., PTOE Assistant Professor Brigham Young University CE En 361.
California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
California State Rail Plan Overview Presentation Tribal Informational Meeting – March 1,
Austin Strategic Mobility Plan Apr 19, 2010 Program Overview.
November 7, 2012 DUMBARTON RAIL CORRIDOR PROJECT.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
April 29,  Investment in new and improved services, with a strong focus on customer experience  Investment focused on improving efficiency  Shorter.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Trains are better for our environment than other modes of travel.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
On-TRAC: A Plan of Transit/Rail Action for Commuters.
North Carolina Rail Division Staff of about 50 Mission to: Improve & expand passenger rail service Improve safety at crossings Provide industrial access.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
Skagit-Island Special Needs Transportation Committee 11/5/2014.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
Early Implementation of Coalition Initiatives ARK-LA-TEX Rail Summit May 9, Transportation Department North Central Texas.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
MOBILITY 2030: THE METROPOLITAN TRANSPORTATION PLAN FOR THE DALLAS-FORT WORTH METROPOLITAN AREA North Central Texas Council of Governments Transportation.
Scotland’s Railways Malcolm Reed Chief Executive Transport Scotland.
“People should have transportation options.” TRANSPORTATION MOVING PEOPLE AND COMMERCE WHERE THEY WANT AND NEED TO GO.
Moving from TDM Planning to Implementation North Coast Corridor, San Diego.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Oregon Passenger Rail Leadership Council Meeting June 6, 2012.
System Management and Operations System Development and Design Growth and Development Plan Components E AST -W EST G ATEWAY.
Nate Asplund Director – Public Private Partnerships September 20, 2009 SCORT 2009 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Orht I-5 North Coast Corridor Project CA Transportation Planning Conference – New Directions in Planning Integrating Resource and Infrastructure Plans.
Federal Consistency Certification Sorrento To Miramar Double Track - Phase 1.
The 710 Freeway Threatens Pasadena Presented To The Pasadena City Council August 13, /13/2012 Item 1 Submitted by John Shaffer.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
TPB TECHNICAL COMMITTEE MEETING September 6, 2013 District Department of Transportation Federal Railroad Administration.
Federal Consistency Certification Sorrento Valley Double Track.
Click to edit Master title style March 2016 California Coastal Commission (Items W11a, W11b, and W10f)
Patricia McDonald, Secretary Vermont Agency of Transportation
Connecting and Transforming California
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
The Freight RUS - a draft for consultation
Michigan Update Michigan Association of Rail Passengers
DRPT Overview Jennifer Mitchell Agency Director
Manchester Airport -sustainable development plan – Surface access
2016 SCORT Annual Meeting Federal Grant Opportunities
APTA High Speed Rail Policy Forum December 2, 2015
Presentation transcript:

I-5 North Coast Corridor

I-5 North Coast Corridor FREQUENTLY ASKED QUESTIONS Are we “only” expanding the freeway? Why widen the freeway? Are we just trying to build our way out of congestion ? How do we protect and enhance coastal resources and communities?

PAGE 3 3 Draft Documents Release, Summer 2010 I-5 North Coast Corridor Project Timeline Are we “only” expanding the freeway?

PAGE 4 4 Multimodal: Transportation Options Different Customers/ Different Needs Quality of Travel Livability Sustainability Are we “only” expanding the freeway?

I-5 North Coast Corridor LOSSAN Corridor 51% of line is single-track Passenger and freight services: Metrolink, Amtrak, Coaster & BNSF Program Environmental Document completed in 2008 Rail Study prioritized 40 individual projects (Double tracking, Bridge replacements, Station improvements) identified 12 projects funded by SANDAG. Are we “only” expanding the freeway?

I-5 North Coast Corridor 6 Service Driven Plan - Weekday Trains Existing Near-Term Service Expansion Mid-Term Service Expansion Long-Term Service Expansion Amtrak 22 – COASTER Metrolink BNSF Total65 – Are we “only” expanding the freeway?

I-5 North Coast Corridor 7 Are we “only” expanding the freeway?

I-5 North Coast Corridor PAGE 8 I-5 North Coast Corridor Are we “only” expanding the freeway?

I-5 North Coast Corridor PAGE 9 Project Need: Traffic Congestion Why widen the freeway?

I-5 North Coast Corridor Why widen the freeway? Different Customers/Different Needs

I-5 North Coast Corridor Why do Fwy Improvements

I-5 North Coast Corridor

I-5 North Coast Corridor

I-5 North Coast Corridor Project Alternatives PAGE 14 Buffer AlternativesBarrier Alternatives Buffer Cost: $4.1 Billion No-Build Cost: $3.3 Billion Barrier Cost: $4.4 BillionCost: $3.8 Billion Buffer Barrier

I-5 North Coast Corridor PAGE Coaster ML Are we just trying to build our way out of congestion?

I-5 North Coast Corridor Legend Project Opportunities I-5 North Coast Corridor PAGE 16 Community Connectivity and Coastal Access Protection of Lagoons Community Character