YETS status report TCM 12.01.2016 Francesco castronuovo.

Slides:



Advertisements
Similar presentations
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Advertisements

Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
European Gravitational Observatory25/01/20061 Alignment : Hardware & Software Status Henrich Heitmann, Julien Marque with the contribution of: INFN Frascati,
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
TS2-SPS & TS1-LHC. TS2-SPS (On Monday 15th of June for 24hrs) SPS – HW: Replacement of HV Switch PFN 7 MKP (Impact 65420) SW: « Smooth » upgrade in accordance.
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Duties of a system administrator. A system administrator's responsibilities typically include:
Status of SPS Ionization Profile Monitor Mariusz Sapinski, CERN BE/BI MSWG
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
41 st LSC – March 21, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report The upgrade of 600 A Energy Extraction Systems.
Assessment Outcomes 2 and 3 Russell Taylor. Assessment Outcome 2 Set-up an operational computer system with a range of computer hardware Practical & Theoretical.
LHC Beam Dumping System Status and Readiness for LHC Run II Evian Workshop 2-4 June 2014 Nicolas Magnin – TE/ABT/EC On behalf of TE/ABT team. Thanks to.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
CALO News Pascal Perret LPC Clermont 26 November 2014.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
What will we do for Beam Preparation: Injection and Beam Dump Jan Uythoven Thanks to M.Barnes, E.Carlier, L.Ducimetière, B.Goddard, R.Jones, Y.Kadi, V.Kain,
ABT Consolidation Review Electronics & Controls Etienne Carlier
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
CH 13 Server and Network Monitoring. Hands-On Microsoft Windows Server Objectives Understand the importance of server monitoring Monitor server.
EN-CV interventions during YETS
MKD Reliability run Viliam Senaj TCM meeting 18/11/2014.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
MKI’s TCM Tests status Electronics and Controls 17/11/2014 by R.A.Barlow.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
1 ABTEF - 16/05/2014 Maintenance of safety-critical systems : LBDS - MKD / MKB on LHC.
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
Replacement of Obsolete/Old Hardware L. Ducimetière SPS Consolidation Review Luc Sermeus, Mike Barnes, Viliam Senaj, Thomas Kramer, Luis Feliciano, Vasco.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
YETS status report TCM Francesco castronuovo.
IPOC Software for LBDS Data Acquisition & Analysis LBDS Technical Audit CERN - AB/BT/EC - N.Magnin.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
LBDS YETS activity report Viliam Senaj MKD meeting, 19/01/2016.
BIS 303 Week 3 DQ 2 What is your organization’s policy regarding the replacement or upgrading of hardware and software? Are there scheduled replacements.
ABT-EC EYETS Activities 2nd reports
MKI Performance During 2016 and Plans for EYETS
TE-MSC activities in SPS during LS2
EYETS David Hay EN-OSS.
LHC-RF activities in LHC PT 4 TS2 YETS LS2
BE-CO LS1 review View from TE/ABT/EC
LHC Beam Dumping System Reliability Run Summary
MKD/MKB Review Meeting Scope and Definition
# 56- FIRE PREVENTION (Decision Needed)
J. Uythoven for the MPE-MI & MS Teams
EN-HE SPS works during EYETS
Capacitive pick-up on MKP: why, when, who, resources, others
MPE main activities planned for LS2
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Overview of LBDS related tasks
YETS 2017 TE-CRG-OP overview of tasks to perform during the first month _GF YETS2017_CRG-OP.
MPS relevant changed during TS
Unit 2 Computer Systems HND in Computing and Systems Development
Presentation transcript:

YETS status report TCM Francesco castronuovo

SPS 12/1/20162 ACTIVITIESLOCSTATUSRemarque Inspection 2 TMR MKDVLss18 to 12 Feb Tests on MKP tankLss1Cancelled9 to 12 Feb New DUMP Switch BA1 New To prepare Test of system BA11/02 water condition New Hardware Configuration MKE Lss4Remaining: Replacement of 12 CB Eca4 On Going End of work – Week 2 Test of system Eca418/01 water condition Oilers installation on BELss6 Postponed Next TS Handle on CBLss6 Test of system BA61/02 water condition

LHC 2 12/1/20163 ACTIVITIESLOCSTATUSRemarque General Inspection in RA 23 & RA 87 RA_23 Replacement of TDR UA_23End W3 Maintenance (software upgrade, hardware check…) UA_23On goingEnd W3 Consolidation Thyratron heating system UA_23On goingEnd W2 Installation of capacitive pick-ups acquisition system UA_23On goingEnd W2 Check of Thyratron bias board monitoring system UA_23On goingEnd W3 Add acquisition system for vacuum interconnect analog value UA_23On goingEnd W3 Start deployment of low-voltage monitoring system UA_23On goingEnd W3 Commissioning Tests UA_2319/02

LHC 4 ACTIVITIESLOCStatusRemarque General InspectionRA43 Normal maintenance (software upgrade, hardware check…) RA43 On GoingEnd W2 Migration FEC from RIO3 CPU to MEN-A20 CPU + FESA2 to FESA3 RA43 On GoingEnd W2 Check quality of AC dipole interconnections RA43 W7 Tests CommissioningRA43 26/02 412/1/2016

LHC 6L & 6 R ACTIVITIESLOCStatusRemarque General InspectionRA63/67 Clean-up 30 MKD + New panelsUA63/67 Replacement of stacks GTO : MKD + MKBHUA63/67On goingBeginning W3 Normal maintenance (software upgrade, hardware, Check…)UA63/67On goingEnd W2 Cabling cleaning in GP racksUA63/67W6 Improve re-trigger lines monitoringUA63/67On goingEnd W2 Re-check UPS power failure)UA63/67On goingEnd W2 Modification PROFIBUS communication frame (add fields)UA63/67 Deploy MKB switch ratio auto calibration systemUA63/67 Tests Commissioning Reliability run /1/2016

LHC 8 12/1/20166 ACTIVITIESLOCSTATUSRemarque General Inspection in RA 23 & RA 87 RA87 Replacement of TDR UA87Next week Maintenance (software upgrade, hardware check…) UA87On GoingEnd W4 Consolidation Thyratron heating system UA87On GoingEnd W4 Installation of capacitive pick-ups acquisition system UA87On GoingEnd W4 Check of Thyratron bias board monitoring system UA87On GoingEnd W5 Add acquisition system for vacuum interconnect analog value UA87 On Going End W5 Start deployment of low-voltage monitoring system UA87On GoingEnd W4 Commissioning Tests RA_UA8719/02