Ventilation Map N FAB Entry 1 Entry 2 Entry 3 D East Decline West Shaft (Intake) Door Closed Temporary Stopping A Temporary Stopping B Mine Fan ON/OFF Temporary Stopping E Temporary Stopping D D Caved Impassable Temporary Stopping C LHD Impassable Timbers Fire Out
Problem Map East Decline West Shaft (Intake) O2 = 20 % CO = 350 ppm NO2 = 3 ppm Smoke O2 = 14 % CO = ppm NO2 = 150 ppm D Door Open Curtain Open Curtain Open Smoke O2 = 9 % CO = ppm NO2 = 200 ppm Smoke O2 = 9 % CO = ppm NO2 = 200 ppm Smoke O2 = 7 % CO = ppm NO2 = 300 ppm Caved Impassable Water to Roof FAB Water Knee Deep Pager Phone 4 ft. Back Charred Timbers Right & Left Timbers On Fire Mine Fan ON/OFF LHD Impassable Face Drill Scaler Loaded Face with (Unshunted lead wires) Intense Heat Tool Room 1 Set Building Materials Entry 1 Entry 2 Entry 3 Pager Phone D Jim Bell (wet) Pump Controls ON/OFF Break into old mine Bill Owen Door Closed Fire Ext. Ken Sims Loose Roof Smoke O2 = 9 % CO = ppm NO2 = 200 ppm 2 Sets Building Materials
Team Map N East Decline West Shaft FAB Entry 1 Entry 2 Entry 3
Fresh Air Base Map N East Decline West Shaft FAB Entry 1 Entry 2 Entry 3
Co-Captain’s Map N East Decline West Shaft FAB Entry 1 Entry 2 Entry 3
Judges’ Map N East Decline West Shaft Entry 1 Entry 2 Entry 3 FAB
20’ x 20’ pillar 20’ x 20’ pillar 20’ x 20’ pillar 20’ x 20’ pillar Construction Map 20’ x 10’ pillar 20’ x 10’ pillar 10’ entries & 10’ crosscuts