HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.

Slides:



Advertisements
Similar presentations
Requirements Specification and Management
Advertisements

1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
GLAST LAT Project4.1.7 Dec 15’03 V 1 FSW Organization Chart FSW Lead J. J. Russell Project Manager (IPM) L. Klaisner Electronics & FSW Manager G. Haller.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
Segment Two: Business Requirements Drive the Technical Updates January 26-27, 2012 Idaho ICD-10 Site Visit Training segments to assist the State of Idaho.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
CC20O7N - Software Engineering 1 CC2007N Software Engineering 1 Requirements Engineering Practices with Techniques.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
Aerospace Testing 2006 A Centralized Approach To Ground Support Software To Reduce Technical Risk and Overall Mission Costs Thomas Hauck GSE Software,
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
Barbara PlanteFIELDS iPDR – DCB Flight Software Solar Probe Plus FIELDS Instrument PDR DCB Flight Software Barbara Plante UC Berkeley SSL
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
SPP Spacecraft Emulator (SCE) Introduction
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Refined ECSS Software Process Model Elements SD-TN-AI-0570, Issue 5 APPENDIX D.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
11/24/2015Dr. SASTRY-PROJ SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D.
Overview of SOIS Electronic Data Sheets (EDS) & Dictionary of Terms (DoT) SOIS APP WG Fall 2012.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Phase 3 The Software Requirements Specification. After review of the customer’s System Spec. After educated analysis Preliminary design A technical, software.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
GoetzPre-PDR Peer Review October 2013 FIELDS TDS FPGA Peer Review Keith Goetz University of Minnesota 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
NCKU UCB Tohoku GSE Software, T.T. Wang 1 Ground Support Equipment(GSE) Software Tzu-Te Wang.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
FGM peer PDR GSE - 1 Braunschweig, October 8-9, 2003 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
Solar Probe Plus FIELDS RFS Peter R. Harvey. RFS FSW Requirements.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
Solar Probe Plus FIELDS Team Meeting Management 7/07/2015.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Secondary Boot Code (SBC) D.Wood Naval Research Laboratory.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
11/3/2000cmd_soh1 SOH and CMD Current Status. 11/3/2000cmd_soh2 ISUAL Flight Software 0.0 SOH Telemetry CMD Input Debug I/O.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review RFAs and Recommendations Peter R. Harvey.
Command & Data Handling
Overview of SOIS Electronic Data Sheets (EDS) & Dictionary of Terms (DoT) SOIS APP WG Fall 2012.
Ground Support Software
Solar Probe Plus FIELDS
ESA GSE.
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Instrument Data Processing Unit (IDPU)
Acceptance Test Review
CONTOUR NGIMS Electronics Test History
GLAST Large Area Telescope
Our Process CMSC 345, Version 1/04.
Presentation transcript:

HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1

HarveyFIELDS iCDR – Flight Software Agenda 2 Requirements Definition Baseline Software Requirements Specification (SRS) Software Documentation Tree Requirements Partitioning for Phased Delivery (Build Plan) Testing Requirements Requirements Traceability Matrix (in SRS)

HarveyFIELDS iCDR – Flight Software Documents 3 Management Plans/Standards NPR_ (Software Engineering Standard) NASA-STD (Software Documentation Standard) NASA-STD /1 (Software Quality Standard) NASA-STD-8715 (Software Safety) GSFC-STD-1000e (Gold Rules) SPF-SMA SMA Requirements SPF_SMA_002_Rev-_PAIP SPF_MGMT_008_SDP (Software Development Plan)

HarveyFIELDS iCDR – Flight Software Documents 4 Requirements/Specifications _Rev_-_Level-3_PAY_PayloadRequirementsDocument.docx _Rev_A_GI_ICD General Instrument ICD _Rev_A_FIELDS_ICD FIELDS Specific Instrument ICD SPF_SYS_010_Instrument_Requirements - IRD (Level 4) SPF_FSW_002_SRS (Level 5) SPF_DCB_001_Specification_REV6.doc SPF_MEP_100_CDI_ICD_REV6 SPF_MEP_101_TDS_ICD_REV3 SPF_MEP_102_DFB_ICD_REV4 SPF_MEP_103_MAG_ICD_REV4 SPF_MEP_104_AEB_ICD_REV4 SPF_MEP_105_SWEAP_ICD_REVC The LNPS does not current have an ICD

HarveyFIELDS iCDR – Flight Software Documents 5 Software Documents/Reports Preliminary plan SPF_FSW_002_SRS (Software Requirements Specification) SPF_FSW_003_SDD (Software Data Dictionary) SPF_FSW_004_SAD (Software Architecture) SPF_FSW_005_SID (Software Interface Design) SPF_FSW_006_STP (Software Test Plan) SPF_FSW_007_SUM (Software Users Manual) SPF_FSW_008_SMP (Software Maintenance Plan) SPF_FSW_MPR_YYMM (Monthly Progress Report inc/ Metrics) SPF_FSW_SVD_XXX (Software Version Descriptor) SPF_FSW_STR_XXX_YYMMDD (Software Test Report) SPF_FSW_SIR_XXX_YYMMDD (Software Inspection Report) SPF_FSW_SCR_NNN (Software Change Request) SPF_FSW_SPR_NNN (Software Problem Report) Review Packages (SwPDR, SwCDR, SwATRR, SwAR) Sw Design Peer Review Packages (periodic) Sw Code Walkthrus (prior to each build delivery) Test Procedures, GSE Display Definitions, Command & Telemetry Database files

HarveyFIELDS iCDR – Flight Software Required Products 6 Software Products Boot FSW (PROM) Operational FSW (EEPROM) (in addition to Boot)

HarveyFIELDS iCDR – Flight Software L4 Requirements and Traceability 7 NB: (i)FSW-03(b) science data in total data volume per ICD, not meant to mean “volumes.” (ii) FSW-08, 09 flow from L3 directives which currently include a “TBD” response time.

HarveyFIELDS iCDR – Flight Software L4 Requirements and Traceability 8 NB: (i) “Collect and telemeter” naturally is an overview of the work to handle the input science raw measurements. It includes time-tagging, summing, averaging, and general data processing to commanded options.

HarveyFIELDS iCDR – Flight Software Build Plan and Schedule 9

HarveyFIELDS iCDR – Flight Software Test Requirements 10 Test Requirements Test Platform : ETU Data Controller Board Initially ETU DCB when available Test Equipment: GSE PC GSEOS Software Spacecraft Emulator Instrument Simulation (w/ Good and Bad Data Sets) Logic Analyzer Digital Scope Data Storage: All instrument data and housekeeping Command/Event logs Network access for external science data displays